District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
IRTBA “STATE OF THE INDUSTRY” Will County FY 2012.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
November 14, 2014 District Construction Season.
Welcome.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
From Island Estates Parkway to St. Johns County Line.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Gaviota Beach Road – Transportation Division County Project Summer Crossing – Pre 1997 Located west of Highway 101 Access to Gaviota Beach and Hollister.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Current Construction Projects Major Projects Pinellas County.
Massachusetts Avenue Roadway Improvements Board of Selectmen’s Meeting July 13, 2015 TOWN OF LEXINGTON.
Odd Fellows Road Interchange and Roadway Improvements Citizen Information Meeting April 15, 2015.
Westfield Public Works Department Jeremy Lollar, Director June 8, 2015.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
STA Safety Project PID #76439 December 12, 2006.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Community Development Department Royal Palms Parkway City Council Workshop July 29, 2014.
1. PUBLIC WORKS 2 Traffic in Synch  Synchronization of traffic signals began December 2007  2,300 signals synchronized as of June 2010  On track to.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Madison Avenue Reconstruction Department of Planning and Development.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Transportation Report
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Improvements to Stockton Street
Town of Brighton, Department of Public Works
District 3 Complete Streets Projects
DICKINSON AVENUE RECONSTRUCTION
DISTRICT 1 ADVERTISED PROJECTS
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Highway 169 Bridge Replacement & Pavement Resurfacing
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
SE 12th Street Roadway Improvements February 8, 2005.
1200 West Widening and Reconstruction Project
District Construction Season
Construction Management & Engineering
Contract 60X10 Informational Meeting Weber I-55
Meadow Lane – Brandon Road Improvements Welcome!
Harbour Island Force Main Replacement
Rehabilitation Project WIN
Monterey County Project Report for Measure X Expenditures
2015 January February March April May June July August September
Presentation transcript:

District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project Development

Contract No. – CE MD 213 at MD 279 in County Contract No. – CE MD 213 at MD 279 in County Geometric Improvements Advertisement Date: November 18, 2014 Notice to Proceed: March 16, 2015 Approximate Hot Mix Asphalt Tonnage: 725 Tons. Scope: Drainage improvements, sidewalk construction to meet ADA compliance, signal reconstruction, APS pedestrian signals, resurfacing through intersection. MD 213 at MD 279

Contract No. – CE MD 273 at Appleton Road in Cecil Contract No. – CE MD 273 at Appleton Road in Cecil County Geometric Improvements - Roundabout Advertisement Date: December 9, 2014 Notice to Proceed: March 23, 2015 Approximate Hot Mix Asphalt Tonnage: 3,500 Tons MD 273 at Appleton Road

Contract No. – CE Contract No. – CE MD 281 at Muddy Lane Geometric Improvements - Roundabout Advertisement Date: January 27, 2015 Notice to Proceed: May 11, 2015 Approximate Hot Mix Asphalt Tonnage: 2,000 Tons MD 281 at Muddy Lane

Contract No. – CE MD 272 at Tiger Drive in Cecil County Contract No. – CE MD 272 at Tiger Drive in Cecil County Geometric Improvements Advertisement Date: March 10, 2015 Notice to Proceed: June 22, 2015 Approximate Hot Mix Asphalt Tonnage: 3,900 Tons Scope: Removal of concrete median, signal reconstruction, roadway widening, resurfacing through intersection. MD 272 at Tiger Drive

Contract No. – CE Contract No. – CE MD 279 from U.S. 40 to Belle Hill Road in Cecil County Town of Elkton Resurfacing and Safety Improvements Advertisement Date: April 14, 2015 Notice to Proceed: July 1, 2015 Approximate Hot Mix Asphalt Tonnage: 10,500 Tons MD 279

Contract No. – CO Contract No. – CO MD 315 from Main Street to Reliance Avenue in Caroline County Town of Federalsburg Resurfacing and Safety Improvements Advertisement Date: Summer, 2015 Notice to Proceed: Fall, 2015 Approximate Hot Mix Asphalt Tonnage: 640 Tons MD 315

Contract No. – CE Contract No. – CE MD 272 North of Rogues Harbor Road in Cecil County Slope Repair Advertisement Date: November 17, 2015 Notice to Proceed: March 14, 2016 MD 272

Contract No. – CE MD 273 at Blue Ball Road in Cecil County Contract No. – CE MD 273 at Blue Ball Road in Cecil County Geometric Improvements - Roundabout Advertisement Date: December 1, 2015 Notice to Proceed: March 14, 2016 Approximate Hot Mix Asphalt Tonnage: 3,100 Tons MD 273 at Blue Ball Road

Contract No. – CE Contract No. – CE MD 222 from Granite Avenue to South Town Limits in Cecil County Town of Port Deposit Drainage Improvements Advertisement Date: January 19, 2016 Notice to Proceed: May 2, 2016 Storm drain repairs and proposed storm drains at ten locations, including utilizing existing outfalls and constructing new outfalls to the Susquehanna River. MD 222