Construction and Demolition Waste Management at UVM

Slides:



Advertisements
Similar presentations
INSPECT HUMAN WASTE DISPOSAL SYSTEMS
Advertisements

The Committee and Research – Where are we and where might we be going?
Leadership in Energy and Environmental Design for Existing Buildings (LEED-EB): Operations and Maintenance Sustainability Activities by the BUILDING OCCUPANT.
ANSI/ASHRAE /USGBC/IES/ Standard AND ITS REQUIREMENTS COMPARED TO LEED V 3 Presented by: Rachael Green Huitt-Zollars; USGBC North Texas Chapter.
Construction Waste Management in Hospitality Industry Paul Cetola - LEED AP Allied Waste Services.
Kendra A. Morrison, U.S. EPA Region 8 Analysis of Recycling Asphalt Shingles in Pavement Mixes from a Life Cycle Perspective.
Leadership in Energy and Environmental Design-Existing Buildings (LEED-EB): Operations and Maintenance Waste Stream Audit: Six Steps for conducting a “Dumpster.
FHWA Sustainable Highways Self- Evaluation Tool Tracking Environmental Commitments Recycle and Reuse Materials Construction Equip. Emission Reduction Construction.
MassDEP1 Environmental Business Council’s Health Care Seminar MassDEP’s Construction and Demolition Debris Ban Massachusetts Department of Environmental.
Building for theBy Recycling Industrial Materials Industrial Materials Recycling Kimberly Cochran, PhD US EPA Office of Solid Waste AGC Building Division.
Sustainability in Construction: A LEED Primer
Construction + Demolition Waste Trends Trends in Construction and Demolition Waste in Oregon AOR Construction and Demolition Recycling Forum March 15,
LEED CERTIFICATION IN THE RETAIL ENVIRONMENT Maggie Benson and Isabelle Bouthillier Project By:
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
Green Building Materials
Basic Building blocks for Developing a Sustainability Program Florida Healthcare Engineering Association September 22, 2010.
Leadership in Energy and Environmental Design for Existing Buildings (LEED-EB): Operations and Maintenance Sustainability Activities by the BUILDING OCCUPANT.
Session One: Introduction to Green Buildings and LEED Introduction to the LEED Rating System.
Green School Design Gary A. Jerue ED 846 Spring 2010.
New iCAP Section from Purchasing, Waste and Recycling SWATeam October 22, 2014 Warren Lavey (chair), Dilip Chhajed, Bart Bartels, Janet Milbrandt, Olivia.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Recycling Roofing Materials in Canada 3 rd Asphalt Shingle Recycling Forum November 1 & 2, 2007 Chicago, Illinois Michael Clapham, NRCan.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
SAINT PAUL SUSTAINABLE BUILDING POLICY Training Module Five Construction Waste Reduction Saint Paul Sustainable Building Policy.
The District School Board of Collier County Recycling Program.
Expressing Environmental Impact in Monetary Units - Environmental Accounting/Costing Approaches.
Construction and Demolition Waste Reduction Management and Practices University of Santo Tomas College of Architecture.
Materials and Resources. 1.Materials and Resources Goals LEED NC Prerequisites & Credits Intent & Strategies LEED EBOM Credits 2.Indoor Environmental.
Resource Efficiency Opportunities in the Building Sector
LEED: LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN Gibbs INTD 153 Design Studio I.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Nirmala Menikpura Institute of Global Environmental Strategies (IGES) Life cycle greenhouse gas emissions and other impacts from recycling activities:
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Sustainability Project Recycling Programs Katie Kishimura, Kellina Lohman, Erica Trimble, Joslyn Wood Tuesday, October 23, 2012.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
© 2009 Capaccio Environmental Engineering, Inc. “Helping Industry and the Environment Prosper” Pollution Prevention Saves Money By Reducing Operational.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
*Green City “Briefing” presentation to the City Council Summer 2008 GCGC GCGC * Project Location is confidential.
Green Recycling Network Toward a Greener Tomorrow... Today!
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
WasteCap Resource Solutions, Inc.. WasteCap Resource Solutions Nonprofit 501(c)(3) Providing waste reduction and recycling assistance for the benefit.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
Recycling involves processing used materials into new products in order to  prevent waste of potentially useful materials  reduce the consumption of.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
Construction and Demolition Waste Management at UVM.
Energy efficiency : Solar Panels heat 60% of our hot water.
Take the Risk out of Sustainability Willis Construction Risk Management Conference September 2013.
Going Green Is it Worth it? Melbourne Convention and Exhibition Centre AIPC July 2010.
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
Sustainability and Facilities Management John Sullivan Energy & Sustainability Office Facilities & Services Division.
Presentation of Contractor’s Report “California 2008 Statewide Waste Characterization Study” CIWMB Strategic Policy Development Committee September 9,
Board Workshop: Overview Of CIWMB Waste Characterization Studies and Tools May 9, 2006.
LEED NC Materials & Resources 13 points Slide Editor: James A. Strapko LEED Source:
The UC Project Management Institute is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion.
Recycling C&D Waste Instead of Landfilling. What CAN Be Recycled? Dirt Cardboard Drywall HDPE (5 gallon buckets) Clean white wood Metal Brick block and.
1 Implementing E.O : Opportunities for Industrial Materials Recycling Implementing E.O : Opportunities for Industrial Materials Recycling Federal.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
SNL/NM Pollution Prevention Critical Mass Achieved: C&D Waste Recycling at Sandia National Laboratories OFEE Symposium June 3, 2008 Ralph Wrons P2 Program.
DEMOLITION WASTE RECYCLING RCBC 2016 Conference | May 2016 PRESENTERS: Suzanne Bycraft: Manager, Fleet & Environmental Programs Linh Huynh: Waste Reduction.
MAPA Wednesday Webinar Everything you always wanted to know about LEED* *but were afraid to ask.
Innovative Construction and Demolition Initiatives Mark Maxwell Emily DeCremer.
Nucor Building Systems SUSTAINABILITY OF NUCOR BUILDING SYSTEMS.
Objectives of a Green Building
Construction Debris Best Management Practices
Green Cleaning to Meet LEED (Leadership in Energy and Environmental Design) Existing (Green) Building Operations and Maintenance Requirements.
Nova Scotia: Thinking Outside the Landfill
Management and Disposal Options for CCA-Treated Wood Waste
LEED Overview.
Presentation transcript:

Construction and Demolition Waste Management at UVM

Construction and Demolition Waste Opportunities Construction and demolition waste is 20-40% of the waste stream going to landfills nationally C+D waste is being generated at UVM everyday; we estimate there are nearly one hundred active projects on campus on any given day.

Environmental Impacts Landfill leaks Methane gas generation Energy lost by not recycling / re-claiming materials Transportation: greenhouse gas emissions

Definition of C&D Waste “Waste material that is produced in the process of construction, renovation, or demolition of structures. Structures include buildings of all types (both residential and non-residential) as well as roads and bridges. Components of C&D debris typically include concrete, asphalt, wood, metals, gypsum wallboard and roofing”. -EPA

Key Terms Construction waste- waste generated while constructing a new building or structure Demolition waste- waste generated while taking down an existing building or structure Deconstruction- the taking apart of an existing building so that materials can be re-used elsewhere

Typical C&D Wastes Asphalt, Asphalt Shingles Carpet Carpet padding Clean wood/pallets Concrete Corrugated cardboard

Typical C&D Wastes Gypsum (drywall) Land clearing debris Scrap metal Salvage Other…

Requirements at UVM Major projects: new buildings, major renovations Minor projects: short term or partial building projects Ongoing renovations: Physical Plant routine maintenance and renovation

Requirements at UVM The waste management plan will be based on LEED® guidelines for C+D waste management The plan must divert at least 50% of waste generated from the project Workers must view training presentation as part of job site orientation

C&D EMS Focuses on continuous program improvement by organizing activities into four stages: Plan Do Check Act Program documentation is to maintain program improvements over time This approach is based on organizational quality improvement practices

C&D EMS Plan: vendor identification, development of job specifications Do: walkthrough checklist, collection of disposal tickets Check: entering of disposal data into the system, meeting of LEED goals Act: evaluation of program by project managers, analysis of financial impacts

C&D EMS Plan: tri-annual review of vendor options and specifications Do: implement the project tracking system for all major projects and move the size of the projects covered smaller and smaller Check: assure C&D waste LEED points are achived for every project (50% recycled for 1 point; 75% for 2 points) plus innovation point Act: financial break even compared to landfilling the entire job

LEED Requirements The Leadership in Energy and Environmental Design (LEED®) Green Building Rating System is the nationally accepted benchmark for the design, construction and operation of high performance green buildings. It gives building owners and operators the tools they need to have an immediate and measurable impact on their buildings’ performance, by promoting a whole-building approach to sustainability.

LEED Requirements LEED certification is required for large projects at UVM According to the 2007 “Environmental Design in New and Renovated Buildings” Policy, UVM projects must achieve 33/69 points to achieve the required ‘Silver’ rating. In the LEED-NC 2.2 Rating system, there are 2 points available for Construction and Demolition waste diverted from the landfill: 1 point if 50% of waste is diverted 2 points if 75% of waste is diverted The UVM tracking tool collects and reports the information that must be submitted to receive these points.

LEED Criteria MR Credit 2.1: Construction Waste Management: Divert 50% From Disposal: 1 Point Recycle and/or salvage at least 50% of non-hazardous construction and demolition debris. Develop and implement a construction waste management plan that, at a minimum, identifies the materials to be diverted from disposal and whether the materials will be sorted on-site or co- mingled. Excavated soil and land-clearing debris do not contribute to this credit. Calculations can be done by weight or volume, but must be consistent throughout. MR Credit 2.2: Divert 75% From Disposal: 1 Point in addition to MR Credit 2.1 Recycle and/or salvage an additional 25% beyond MR Credit 2.1 Additional points for using salvaged and/or recycled content building materials

Demolition/Deconstruction and New Construction Required Elements Collection containers must be on site and labeled clearly before demolition can begin Waste must be separated into appropriate categories Labeled bins will remain on site for waste generated in new construction All waste shipped off-site must be tracked in C&D database

Online Tracking Tool Website The Green Building Coordinator Homepage: http://www.uvm.edu/~gbc/ The Online Tracking Tool Data Entry Page: http://www.uvm.edu/~gbc/cdw/?Page=projects.php