The Institution Recycling Network Case Studies: Construction and Demolition Waste Management Build Boston, November 15, 2005 Mark Lennon 603-229-1962www.WasteMiser.com.

Slides:



Advertisements
Similar presentations
Construction & Demo Waste. Landfilling Waste is a Big Deal A study shows 28.7% of waste placed in landfills is construction & demolition waste (C & D.
Advertisements

Reducing construction waste through design Dave Marsh Construction Project Manager.
Martin Grohman, LEED®AP Director of Sustainability, GAF Slide 1 SETTING UP A CONSTRUCTION WASTE MANAGEMENT PLAN.
65 years of tradition in designing and manufacturing custom-made furniture Founded in Southern Germany Clients in Germany and Switzerland Strong partner.
Richard A. Ludt Waste Management Administrator Interior Removal Specialist, Inc. LEED ® AP.
Guidelines and Required Codes That Affect Building Design
Update on FCPS Construction/Renovation Projects August 2009.
A Free, Confidential & Non-Regulatory Program Smart Waste Management alternatives for Iowa business & industry Reduce Reuse Recycle.
October 22, 2009The Upside of Waste Management NEIA Workshop Central Newfoundland Waste Management Facilities BAE Newplan Group Ltd. Wayne Manuel P.Eng.
Integrating Construction, Demolition, and Recycling By: Brooke Morgan At this time in Northwest Arkansas, thousands of tons of valuable resources are being.
Construction and Demolition Waste Management at UVM
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Skyscraper Construction
VOLUSIA COUNTY’S HISTORIC COURT HOUSE Volusia County was created by an act of the Florida Legislature in December …to date four courthouses have.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
AIMHO11/12/2013 RENOVATION.  1550 on-campus beds  650,000 square feet  Facility occupancy range  3 year live on – requirement  3 housing types.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
Sustainability and the Breuer Building Sustainability and the Breuer Building The Cleveland Green Building Coalition
What you need today Text Notebook Calculator (optional) 1/8” = 1’ print of foundation (basement) plan –With dimensions.
Introduction The Institution Recycling Network 7 South State Street Concord, NH John Gundling, CWM Specialist.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Recycling Roofing Materials in Canada 3 rd Asphalt Shingle Recycling Forum November 1 & 2, 2007 Chicago, Illinois Michael Clapham, NRCan.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Salvage: It’s like destroying things, Only a lot gentler Blake Rainville Thomas Pinello Eammon Coughlin Peter Connelly.
Construction and Demolition Waste Reduction Management and Practices University of Santo Tomas College of Architecture.
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
Introduction of the Building Sector in DPR Korea 9 th March, 2008.
Deconstruction: A Local Government Model Wayne Fenton Orange County Public Works, Hillsborough, NC.
Green Recycling Network Toward a Greener Tomorrow... Today!
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Recycling and Reuse Policy for C&D Waste Justin Green Program Director Build It Green!NYC.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
Greg Shinaut Black Hills Energy City of Lincoln – Green Practices Consultant.
Environmental management Office waste recycling March 2006 University of Leeds EAUC Hazardous Waste seminar – 5 July 2006 Dr Keith PitcherEnvironmental.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
EAUC Hazardous Waste seminar – January 2007 Dr Keith PitcherEnvironmental Officer tel: web:
Local Jurisdiction Adoption of Construction & Demolition Ordinances Local Assistance & Market Development July 11,
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Construction and Demolition Waste Management at UVM.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
Kindersley Waste & Recycle: Landfill Impacts SWANA Regional Waste Management Workshop November 16, 2015 – Saskatoon, SK.
Presented by Katelyn Wright, Greater Syracuse Land Bank Executive Director Mike Gable, Construction Junction Executive Director Winnie Branton, Esq., Branton.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT PROJECT 10/DS 413/MAY 9, 2012.
JLC CONSTRUCTION FIELD GUIDE The most comprehensive and trusted reference guide to best practices for the construction market ANY TIME. ANY PLACE. ANY.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
APPLICATIONS OF TECHNOLOGY
City of Cambridge Department of Public Works October 19, 2010 Schedule: Construction Beginning: October 2010 Construction Duration: 18 months Contractor:
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
DEMOLITION WASTE RECYCLING RCBC 2016 Conference | May 2016 PRESENTERS: Suzanne Bycraft: Manager, Fleet & Environmental Programs Linh Huynh: Waste Reduction.
Innovative Construction and Demolition Initiatives Mark Maxwell Emily DeCremer.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
Children’s Section of the Library Entrance lobby from Main Street looking east.
BLAKELY  Welcome.
Why We Exist Second chances Personal redemption
2015 School Bond Construction Program
Fun Facts: James M. Bennett High School
Disposal of waste concrete and bricks
MAPLE RUN UNIFIED SCHOOL DISTRICT Building Purchase
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Value of contract: Length of contract: Contract start date:
Presentation transcript:

The Institution Recycling Network Case Studies: Construction and Demolition Waste Management Build Boston, November 15, 2005 Mark Lennon www.WasteMiser.com

IRN Active & Recent Projects Boston Scientific – Demo, Renovation (Office) Dartmouth – Renovation, New Construction (Engr School) Emerson – New Construction (Dorm) Harvard (8) – Demo, Renovation, New Constr. (Multiple) Liberty Mutual – Renovation (Office) Maine Medical Ctr – Demolition (Admin) Mt. Washington Valley Econ Council – New Construction Olin College – New Construction (Dorm) USM – New Construction (Community Ctr) URI – New Construction (Dorm) VT Trans – Deconstruction (Residential) VT Law School – Renovation, New Construction (Multi Fctn) Yale – Renovation (Med School)

IRN Active & Recent Projects 6 States 18 Architects 14 Contractors ~25 Markets ~15 Haulers 5,000 – 400,000 Square Feet $3 Million - $38 Million Recycling: 75% - 99%

Recyclable Materials Furniture, FurnishingsFixed Assets (doors, windows) Architectural SalvageFerrous Metals Concrete (incl. Rebar)Non-Ferrous Metals Brick and BlockGypsum Wallboard AsphaltShingles Dimensional Lumber, PlywoodRoofing (Metal, Slate, Membrane) Engineered, Treated WoodLandclearing Wastes Porcelain, Ceramics (Fixtures)Glass Mixed Debris

Boston Scientific Campus Description: Complete interior demolition and reconstruction. 483,000 sq ft, three stories, three buildings (1980’s). Steel frame on slab. Size/Duration: $38M, 24 months Location: Marlborough (exurban) Contractor: Payton (GC), SOS (demo) Architect: BKA

Challenges Single loading dock (inbound + outbound) Long carries Large number of materials Oddball materials (demountable partitions, rooftop HVAC units, etc.) Phased construction (with employee move-in as phases completed)

Materials Recycled Furnishings (reuse)49Carpet157 Building Mat’ls (reuse)39Plate Glass34 Metals, Mixed430Gypsum (Partitions)2,762 Wire & Cable135Wood12 Metals, HVAC3,134Aggregate34 Ceiling Tiles581Mixed C&D (Net at 85%)964 Total Project Reuse and Recycling8,331 Total Waste Disposed371 Project Recycling Rate (Through 9/20/05)95.7%

Keys to Success Hampers and carts (indoor staging to live-load) Union support On-site presence Training, communications Flexibility from all involved

Harvard Blackstone Description: Complete interior gut, interior reconstruction (office), exterior renovation. 40,000 sq ft in three buildings (1890s). Structural brick, concrete, wood beams. Size/Duration: $10M, 9 months Location: Cambridge (urban, tight) Contractor: Consigli Architect: Bruner-Cott

Challenges Tight site; Site work during construction Two projects on same site Hazardous materials (working around abatement) Identifying reuse options

Materials Recycled Furnishings (Reuse)9Brick15 Fixed Assets (Reuse)10Concrete395 HVAC Equipt7Asphalt461 Metal73Gypsum Wallboard25 Wood61Mixed C&D (Net at 70%)6 Total Reuse and Recycling1,061 Total Disposed4 Project Recycling Rate99.6%

Keys To Success Early involvement Recycling requirements inserted into each section of specifications Good waste management spec Use selection process to identify committed contractor Committed owner Lots of concrete and asphalt

VT Law School Debevoise Hall Description: Demolition, interior gut, renovation, new construction of historic 28,000 sq ft class/admin building. Wood frame (old), steel frame (new). Size/Duration: $6.5M, 15 months Location: S. Royalton, VT (rural) Contractor: H.P. Cummings Architect: Truex Cullins

Challenges Historic building (National Register) Commitment to reuse (casework, wainscoting, etc.) Distance to markets Complex project Difficult climate (mud, snow, site conditions)

Materials Recycled Furnishings (Reuse)100%Wood111 Building Mat’ls (Reuse)12Gypsum Wallboard35 Metals45Asphalt Paving13 Concrete356Mixed Debris (Net)15 Total Reuse and Recycling577 Total Disposed141 Project Recycling Rate80.3%

Keys to Success Local Reuse (workers, friends) for many materials (wood, concrete, fixtures, etc.) Committed owner, involved students Won the super

Summary: Making Recycling Work Don’t believe naysayers Early planning, good spec Committed contractor Committed superintendent Recycling integrated into project Flexibility, imagination Training, communications, reporting

The IRN… Mark Lennon or Dana Draper Member Services Matt McKinney, John Gundling Construction Waste Management