Genesee Road and more Genesee County Road Commission January 29, 2009.

Slides:



Advertisements
Similar presentations
Essex County Transportation Services Department Essex County Highways 2014 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Advertisements

From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.
January 24, 2007 Miller Road, Linden to I-75 Miller Road Project Linden Rd to I-75 INTRODUCTION John Daly, Manager-Director Genesee County Road Commission.
7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
Michigan’s Road Commissions January 25, 2006 Legacy And Mission Michigan Townships Association.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Public Works Greg Chock Operations Manager Harlan Hanson Road & Bridge Engineer
Columbia County Road Department Department Presentation June, 2013 By David Hill.
1 Resurfacing and Curb Ramps. 2 FHWA’s Americans with Disabilities Act Program / Section 504 of the Rehabilitation Act of 1973 The primary purpose of.
Essex County Transportation Services Department Essex County Highways 2013 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
MECOSTA COUNTY ROAD COMMISSION February 2, MECOSTA COUNTY ROAD COMMISSION ROAD COMMISSION BOARD  Consists of 3 elected officials  Elected term.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
“Practical Pavement Management with Micro PAVER”
City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.
February 2013 Quarterly Luncheon. Platte County Public Works Bridge replacements Improvements to current roadways New roadways to serve growing demand.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Maryland Transportation Authority (MDTA)
LAKE COUNTY DIVISION OF TRANSPORTATION PROPOSED HIGHWAY IMPROVEMENT PROGRAM OVERVIEW AND PROGRAM PRIORITIES Paula J. Trigg, County Engineer Public.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
The Corporation of the Town of Amherstburg Public Works Department 2013 CAPITAL BUDGET Presented to: The Heavy Construction Association March 20, 2013.
2014 SCAPA Summer Conference Christy A. Hall, P.E. Deputy Secretary for Engineering.
Paula J. Trigg, County Engineer Public Works and Transportation Committee May 1, 2013.
Westfield Public Works Department Jeremy Lollar, Director June 8, 2015.
Essex County Transportation Services Department Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
By Larry Galehouse, Director, National Center for Pavement Preservation and Jim Sorenson, Team Leader, FHWA Office of Asset Management by Larry Galehouse,
Madison Avenue Reconstruction Department of Planning and Development.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Treatments and Resets. PerformanceIndex CompositeIndex Triggers Treatments PerformanceModeling ExpressionsAndFilters Costs Resets Outputs GenerateStrategiesOptimize.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
Pavement Maintenance and Microsurfacing Board of Aldermen Discussion Session January 26, 2010.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Public Works Infrastructure Update Public Works Department April 5, 2016.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Quality Pavement Preservation Projects
PAVEMENT PRESERVATION
Genesee County Road Commission Use of Transportation Funding
DISTRICT 1 ADVERTISED PROJECTS
PA Damage Assessment Exercise
Highway 169 Bridge Replacement & Pavement Resurfacing
District Construction Season
Contract 60X10 Informational Meeting Weber I-55
Pavement Improvement Plan 2009
LONDON GROVE TOWNSHIP PUBLIC WORKS 2019 PAVEMENT CONDITION REPORT &
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

Genesee Road and more Genesee County Road Commission January 29, 2009

Genesee County Road Commission 2009 Road Improvements Federal Aid Projects Primary Road Projects Local Bridge Projects SAD projects Local Road Projects There are number of different funding categories for road improvement projects:

Genesee County Road Commission 2009 Road Improvements Federal Aid Projects (80-20) ProjectImprovement LengthCost Genesee Road- Burton CTL to Carpenter RdRepair & Resurface 2.5$2,400,000 Genesee Road – Coldwater Rd to StanleyRepair & Resurface 1.0$1,200,000 Saginaw Road – Clio Rd to Willard Rd. Repair, Mill & Resurface 1.3$900,000 Perry Road – At McGrath DrainGuardrail Removal & Culvert Ex$120,000 Hill Road – Fenton Rd To Dort HwyRamps, & Ped Signals$375,000 Baldwin Road – West of Saginaw Rd.Guardrail Installation$ 50,000 TOTALS$5,045,000

Primary Road Projects (100% GCRC Funding) Project Improvement Length Cost Lansing Highway – Sheridan Rd to Old Miller Rd 2’ Widening & Resurfacing 0.70 $400, P-1 and S-1 Contract- County Wide Pavement repair & Chip Seal $1,100,000 Other Misc Projects $200,000 TOTALS $1,700,000 Genesee County Road Commission 2009 Road Improvements

Bridge Replacement Location Cost Raubinger Rd Bridge over Swartz Creek (Gaines Twp.)$510,000 Bridge Rehabilitation Coldwater Road Bridge over CSX Railroad (Genesee Twp.)$300,000 TOTALS $810,000

Genesee County Road Commission 2009 Road Improvements SAD Projects Project LengthCost Ottawa Hills Subdivision (Grand Blanc TWP)5.2$4,900,000 Lin Hill Subdivision (Mundy TWP) 1.5$1,200,000 TOTAL S $6,100,000

Genesee County Road Commission 2009 Road Improvements LOCAL RD Projects Project LengthCost Dywood Subdivision (Flint TWP)1.7$1,100,000 Branch Road (Genesee TWP).1$50,000 Other Misc. Roads & Culvert Projects $250,000 TOTALS$1,400,000 There may be additional projects that are unknown at this time.

Genesee Road Rehabilitation Program Burton City Limit to Stanley Road

YEAR OFTYPE OF IMPROVEMENT Lanes Concrete 1974Widen to 4 Lanes Concrete YEAR OFTYPE OF IMPROVEMENT Lanes Concrete 1973Widen to 4 Lanes Concrete 1993Microsurface Center Lanes 1997Microsurface Center Lanes 2008 PASER ADT 10, PASER ADT 15, PASER ADT 11,213 Stage 1 Burton City Limit to Carpenter Road Remove Asphalt Surface, Concrete Repairs, New Asphalt Surface

2008 PASER ADT 12,099 YEAR OFTYPE OF IMPROVEMENT Lanes Concrete 1973Widen to 4 Lanes Concrete 1993Microsurface Center Lanes 1997Microsurface Center Lanes 2006Concrete Repairs/Asphalt Resurfacing Carpenter Road to Coldwater Road

Stage 2 Coldwater Road to Stanley Road 2008 PASER ADT 10,173 YEAR OFTYPE OF IMPROVEMENT Lanes Concrete 1973Widen to 4 Lanes Concrete 1993Microsurface Center Lanes 1997Microsurface Center Lanes Remove Asphalt Surface, Concrete Repairs, New Asphalt Surface

our website: Thanks for your attention! Genesee County Road Commission