Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD.

Slides:



Advertisements
Similar presentations
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Advertisements

B/C Ratio Engr. Faisal-ur-Rehman CED N-W.F.P UET P.
Executive Session Office of Asset Management
Institute for Road Construction and Maintenance - Vienna University of Technology ISTU O PTIMIZED P AVEMENT D ESIGN W ITH R ESPECT TO Q UALITY AND E CONOMY.
AD/AB - LCCA 2 nd Session Wednesday, January 29th.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions Presented by: Hank Bonstedt Executive Director Prestressed.
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
Design and Construction Guidelines for Thermally Insulated Concrete Pavements Lev Khazanovich, UM John Harvey, UCD Joe Mahoney, UW September 12, 2007.
Life-Cycle Cost Analysis
1 Luis Rodriguez, P.E. Federal Highway Administration Life Cycle Cost Analysis Virginia Concrete Conference March 6-7, 2014.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Pat Gardiner Bureau Of Maintenance And Operations 1.
MIT Concrete Sustainability Hub Bruce McIntosh, Portland Cement Association.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Pavement Type Selection: What is the Ideal Process (and what Role does Competition Play)? Leif G. Wathne P.E. ACPA.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
Life Cycle Cost Analysis in Pavement Design - In Search of Better Investment Decisions - Office of Asset Management Federal Highway Administration Executive.
Life Cycle Cost Analysis
Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Life Cycle Analysis The ODOT Way 2003 Transportation Estimators’ Association Burlington, Vermont September 4, 2003 Jennifer McAllister TEA 2003 – LCCA.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
Benefit Cost Analysis Nathaniel D. Coley Jr
Benjamin Krom, PE Michigan Department of Transportation.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Getting More Value from All Highway Data FHWA’s Current Initiatives and Future Plans Presented at Data System Requirements and Gaps to Support Restructuring.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
TAM ETG Webinar #3 Network Life Cycle Analysis Part 1: Introduction and Overview Wednesday, July 8,
Economic Analysis: Applications to Work Zones March 25, 2004.
CHAPTER 9 Capital Investment Decision Basics
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
Survey Responses Regarding Current Issues and Approaches for: Price/Supply Issues, Alternate Bidding Issues, Practices for Increasing Competition Prepared.
Concrete Pavements The Right Tool for The Right Job.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
Maintenance & Rehabilitation Strategies Lecture 5.
Quantifying the Concrete Advantage in Parking Lots.
Highway Costs Spring Highway Transportation Costs Type of CostExamples Highway investment costEngineering design, ROW, grading, drainage, pavement.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
Contractor Alternate Design Serving the Public’s Best Interest.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
What is a Resource? Any physical or virtual entity of limited availability A new or reserve supply that can be drawn upon when needed Something that one.
Life-Cycle Cost Analysis for Concrete Pavements January 30, 2012 Robert Rodden, P.E. Director of Technical Services and Product Development.
UPDATE ON PAVING PROJECTS “TIMES THEY ARE A CHANGING” VRMCA Fall Convention September 7-9, 2008 Hilton VA Beach Oceanfront Virginia Beach, Virginia Robert.
PAVEMENT TYPE SELECTION Hesham Mahgoub, PhD, PE. South Dakota State University South Dakota Department of Transportation, Office of Road Design.
It’s Competition! It’s Competition! 16 th Annual Concrete Conference for the Maryland Transportation Industry Timonium, MD March 15 th, 2016 Leif G. Wathne,
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
Road Investment Decision Framework
Life Cycle Cost Analysis
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Importance of Life Cycle Perspective
Historical Life Cycle Costs of Steel & Concrete Girder Bridges
Driving Indiana’s Economic Growth Bidding Alternate Pavement Designs
Presentation transcript:

Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD Presented by Bob Long American Concrete Pavement Association Mid-Atlantic Chapter

Pavement Type Selection Evolution of the Process  Good old days  More responsible  More structured  Let the market dictate

Pavement Type Selection Typical Basic Components  Equivalent designs  Cost estimates  Life Cycle Cost Analysis (LCCA)  Innovative Contracting (e.g., alternate bids)

What are equivalent sections? Traffic Reliability Subgrade Terminal Condition Traffic Reliability Subgrade Terminal Condition = Provide reasonably similar level of service Designed with the same procedure Same structural capacity Similar traffic-carrying capacity over the analysis period Equivalent Designs

Different Pavement Types Subbase Subgrade Subbase Subgrade Base Asphalt Layer Concrete SectionAsphalt Section

How Pavements Carry Loads 3000 kg. pressure < 0.2 MPa pressure  2.0 MPa Concrete’s Rigidness spreads the load over a large area and keeps pressures on the subgrade low.

Costs  Accurate estimates are essential  Take into account volume, production, and availability of materials  Update regularly

Costs  Liquid AC index jumped from $340 to $842 per ton in just over 4 months (April—August 2009) – that’s a $25 per ton increase for in-place asphalt pavement  Availability of liquid AC was becoming a concern  Over the last 2 years, the price of asphalt pavement has jumped from about $55 to over $75 and as high as $130 per ton  Although cement prices did rise for a while before the big AC increases, prices are lower and stable

Materials Costs

 Economic procedure –That uses Engineering inputs  Compares competing alternates over their life –by considering all significant costs (and benefits)  Construction, Maintenance, Rehabilitation  User  Performance  Expressed in equivalent dollars What is it ? Life-Cycle Cost Analysis

 A Magical Black Box –There is no concrete LCCA or asphalt LCCA  Complicated –Does not need a computer program What it is Not Life-Cycle Cost Analysis

 Present Worth Analysis (PW)  Equivalent Uniform Annual Cost Analysis (EUAC) How it is done: Life-Cycle Cost Analysis

Present Worth Analysis: Discounts all future costs (benefits) to the present Costs Initial Cost Rehabilitation Cost Maintenance Cost Salvage Value Years Costs Present Worth Years Life-Cycle Cost Analysis

 Economic Factors –Discount rate –Analysis Period  Engineering Factors –Comparable sections –Rehabilitation selection –Agency Costs –User costs Basic Factors: Life-Cycle Cost Analysis

 Normally equal for each alternative –Highway: years –Street: years –Airport: 30 years  Include at least one rehabilitation –Needed to capture the true economic benefit of each alternate Analysis Period: Life-Cycle Cost Analysis

 Initial cost of pavement  Maintenance and operation cost  Anticipated future rehabilitation costs –Engineering –Construction  Salvage (recycling value) Agency Costs: Life-Cycle Cost Analysis

 Delay-of-use –Time delays - New construction & Rehabilitation –Fuel consumption –Driver discomfort  Roadway deterioration –Cargo damage –Vehicle wear  Accidents User Costs: Life-Cycle Cost Analysis

Cons –Cannot recoup costs –Not in budget (not “real” money) –Drives the results  Pros –User fees collected pay for public transportation investments –Drives the results User Costs: Life-Cycle Cost Analysis

Some basic insights:  Initial Costs –Account for about 65-90% of Life Cycle Cost. –Selection of features plays an important role –Need to account for added features on the pavement performance.  Timing of Activities. –After initial costs and discount rate, the next most important factor. –The longer an activity is delayed, the greater it is discounted and the less impact it has on present worth. Life-Cycle Cost Analysis

LCCA Process  Design equivalent pavement sections  Establish strategies for analysis period –Estimate agency costs –Establish activity timing –Develop expenditure streams  Estimate user costs  Compute NPV  Analyze results  Re-evaluate strategies

Pavement Type Selection Overview of Maryland Process  Policy on application of process  Three tiered approach –Life cycle cost comparison –Component analysis –Innovative contracting  Probabilistic approach to LCC  Weighting of component factors based on project priorities  Project team formed to make final decision

Application Policy  All projects developed through the Project Planning Division ready for design, and  Any projects with a construction estimate > $15 million (with at least $5 million dedicated to pavement/MOT items)  Estimated to be 6 to 8 projects per year. (Staff resource levels were a limiting factor in the number of projects that could be identified.)

Three Tiered Approach 1st Tier – LCC Analysis within 20% Initial Cost Future Rehab Costs over 40 Years User Delay Costs 2nd Tier – Component Analysis Cost Factors Construction Factors Design & Environment Factors Form Team and Consider Industry Input 3rd Tier – Innovative Contracting Alternate Bidding Warranty Contract Design/Build Contact

Life Cycle Cost Factors  Based on historical data and expert opinion –Material unit costs –Pavement service life –Construction sequencing –Construction duration –General analysis inputs  Variability represented by average and standard deviation

Example Input – Service Life

Component Analysis  Cost Factors –Present worth Agency Costs – Initial & Future –Present worth User Delay Costs  Construction Factors –Duration of Construction –Maintenance of Traffic –Maintenance of Access –(utilities & future maint, material sources, reliability of construction)  Design and Environment Factors –Traffic and Geometry –Adjacent Pavement and Structures –Environmental Impact –(community concerns, future planning)

Project Level PTST  Chief Engineer for MDSHA Operations.  District Engineer of MDSHA District that project resides.  Director of Highway Development (OHD) for MDSHA.  Director of Materials & Technology (OMT) for MDSHA.  Pavement Division Chief of OMT for MDSHA.

Example Component Score

Component Matrix

Alternate Pavement Bidding Alternate pavement bidding involves the bidding of two equivalent pavement designs in order to determine the most economical solution to the owner.

Use of Alternate Bidding  FHWA traditionally discouraged use of alternate bids for pavements  FHWA approved a Special Experimental Project for use of alternate bids in Missouri  AASHTO recognizes Alternate Bids as a contracting technique that will be utilized in the 21 st century  Recommended when more than one alternate is judged “equal” by an agency and that the least costly design approach will result from a competitive bid.  Alternate bidding should be used when there is no clear cut choice between two alternates and have similar life cycle costs

Use of Alternate Bidding  Federal Aid policy suggests that alternative designs are considered for large projects  A life cycle cost economic analysis should be conducted to compare the total cost of each alternate.  If the alternates do not provide equivalent designs then an adjustment must be made to the bid to equate the alternates.  Pavements should be bid in the same units and materials costs escalators should not be used.

Use of Alternate Bidding  The following States/Provinces have experience with alternative bidding: –Alabama –Kansas –Kentucky –Louisiana –Maryland –Michigan –Missouri –Ohio –Pennsylvania –West Virginia

Alternate Pavement Bidding Key Steps and Issues for an Alternate Pavement Bid (APB) Process:  Establish Pavement Type Selection Team  Determine Suitability of Project for APB  Establish Performance Standards  Determine Type of Work  Establish Equivalent Pavement Designs  Define LCCA Requirements  Account for Bid Adjustment Method

Alternate Pavement Bidding Account for Bid Adjustment Method  A + B  A + B + C  C is usually a product of the following example: C = User Delay Cost + (periodic) Rehab Cost + Annual Maintenance Cost C is added to the actual bid amount

West Virginia’s Alternate Bids  Three projects so far with 3 more coming this year  No C factor so far  First project went asphalt  Next two went concrete with the concrete bid 10% less than asphalt  WV is getting the lowest unit prices for asphalt they seen in years

Available Software  AASHTO DARWIN design  WinPAS (ACPA’s Windows version of DARWIN)  Mechanistic Empirical Pavement Design Guide (MEPGD – coming soon)  RealCosts (LCCA)  Concrete Pavement Analyst (NRMCA parking lot design and cost analysis program)

THANK YOU!