Pat Gardiner Bureau Of Maintenance And Operations 1.

Slides:



Advertisements
Similar presentations
A Look to the Future By: Pat Hughes, Dave Holt, and Ron Bumann.
Advertisements

AD/AB - LCCA 2 nd Session Wednesday, January 29th.
5-1 CASE 7 - Cash Flow Hedge of Forecasted Treasury Note Purchase On 1/1/X1, XYZ forecasts a 12/31/X1 purchase of $100 million 5-year 6% Treasury notes.
Life-Cycle Cost Analysis
Agenda Cost Management Capital Budgeting Payback Period
Copyright © 2008 Prentice Hall All rights reserved 9-1 Capital Investment Decisions and the Time Value of Money Chapter 9.
Implementing Mobile A/C Refrigerant Service Environmental Enhancements Jim Resutek OTB Consultants June 2008.
Simple and Compound Interest
Understanding Interest Rates Fundamentals of Finance – Lecture 3.
Perpetual Pavements Concept and History Iowa Open House
Pavement Type Selection (Designs, Costs & Bidding) 9 th Annual Concrete Conference for the Maryland Transportation Industry March 24, 2009 Timonium, MD.
Investment Strategies Career & Financial Management Mrs. Wilson.
Investing Bond Proceeds and Capital Funds Presented by Julio F. Morales April 24, 2006.
Concrete Paving: Opportunities for Virginia Robert R. Long, Jr. Executive Director American Concrete Pavement Association Mid-Atlantic Chapter October.
A Urban Highway Infrastructure: Design For Long, Long Life Michael I. Darter, Ph.D, PE Principle Engineer, ARA, Inc. Director, Pavement Research Institute,
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
Steve Krebs, Bob Arndorfer, and Jed Peters – DTSD-Bureau of Technical Services April 29, 2013.
Steve Krebs and Jed Peters– DTSD-Bureau of Technical Services July 29, 2013.
P.V. VISWANATH FOR A FIRST COURSE IN INVESTMENTS.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 26 Leasing.
ADJUSTABLE RATE AND VARIABLE PAYMENT MORTGAGES OBJECTIVES Calculate loan payments, loan balance, and interest charges on adjustable rate mortgages Effective.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
Life Cycle Analysis The ODOT Way 2003 Transportation Estimators’ Association Burlington, Vermont September 4, 2003 Jennifer McAllister TEA 2003 – LCCA.
Lesson 5-2 Savings Accounts
Patrick DeCorla-Souza, P3 Program Manager, FHWA
Introduction to. Sep. 4, 1997 r Engineering economy relates or applies many concepts from economics, mathematics, finance, accounting, statistics, and.
Financial Concepts Present Value and Stocks (corresponds with Chapter 21: Equity Markets)
Economic Analysis: Applications to Work Zones March 25, 2004.
Interest Rates Chapter 4 1 Options, Futures, and Other Derivatives 7th Edition, Copyright © John C. Hull 2008.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
Long-Term (Capital Investment) Decisions
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
SIMPLE INTEREST Simple interest is the amount paid for the use of money.
© 2003 McGraw-Hill Ryerson Limited 9 9 Chapter The Time Value of Money-Part 1 McGraw-Hill Ryerson©2003 McGraw-Hill Ryerson Limited Based on: Terry Fegarty.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Effects of Inflation Inflation – the increase in the amount of money necessary to obtain the same amount of product or service before the inflated prices.
Phoenix Convention Center Phoenix, Arizona Introduction to Life-Cycle Cost Analysis Agency Energy ManagerLife-Cycle Cost Methodology Mike Mills, CPA, BEP.
Thinking Mathematically
Lesson3: Mortgage Payments Amortization = How long it takes you to pay off the house, ex: 10, 20 years or more. Down Payment = 1 st cash payment of at.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
Facilities Steering Committee Meeting 6 Welcome!
Session 2 Introduction to Pavement Preventive Maintenance Concepts.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Effects of Inflation Inflation – the increase in the amount of money necessary to obtain the same amount of product or service before the inflated prices.
Business management is frequently faced with making decisions about price. How will I set prices? What should pricing accomplish? What about “loss-leaders”?
PennDOT’s 2010 Program Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials 11 th Annual Pennsylvania Concrete.
Agribusiness Library LESSON L060013: THE TIME VALUE OF MONEY.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
Investing Chapter 9. Essentials Of Investing Investing Means going beyond savings, and planning for the future. Making Money with Money.
Contractor Alternate Design Serving the Public’s Best Interest.
LESSON 7.4 & 7.5 OBJECTIVES BONDS. AFTER STUDYING THIS LESSON YOU WILL BE ABLE TO DO THE FOLLOWING: CALCULATE MARKET PRICE OF BONDS CALCULATE THE TOTAL.
BLOCK 4 SELECTION OF THE PREFERRED ALTERNATIVE Pavement Data Collection Project evaluation Select feasible alternatives Reconstruction Restoration Recycling.
What is a Resource? Any physical or virtual entity of limited availability A new or reserve supply that can be drawn upon when needed Something that one.
CHAPTER 4 BOND PRICES, BOND YIELDS, AND INTEREST RATE RISK.
Simple and Compound Interest Simple Interest I = Prt Compound Interest A = P(1 + r)
Copyright 2014 © W. Seth Hunter ConsumerMath.org L12.3 Home Loans BUYING A HOUSE A home can be a castle, a refuge from outside influences. Prepare for.
The Amount of an Annuity So far, all of our calculations have been based on the following concept: You deposit a certain amount of money, and leave it.
Budgets and Businesses Workshop. Budget: is a plan that shows income, spending and saving. Income: Spending: Saving:
Copyright © Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Interpreting Stock Data on the Internet Stock Market Game.
Capital Budgeting 2 Dr. Clive Vlieland-Boddy. Investment Appraisal.
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
INTEREST. Simple Interest Compound Interest SIMPLE INTEREST VS. COMPOUND INTEREST Interest earned on the principal investment Earning interest on interest.
Simple and Compound Interest
Derivative Financial Instruments
Derivative Financial Instruments
Presentation transcript:

Pat Gardiner Bureau Of Maintenance And Operations 1

Why 2

Concept Market Conditions Control Concrete Vs Asphalt Fostered By The Concrete Industry LCCA Process No Longer Determines Pavement Type WIN - WIN For PennDOT And Industry Lower Prices Thru Competition 3

Criteria Sol Applies To Structural Improvements Interstates Over $3 Million Other Facilities Over $15 Million 4

The “C” Factor Includes Future Maintenance Costs User Delay Costs Residual Life Discount AC Lifecycle = 50 Yrs Concrete Lifecycle = 55 Yrs 5

Design Options PennDOT Embraced Alternate Bidding To Save Money Plans Can Show: 1 Alternate Pavement Design 0 Alternate Pavement Designs Both Alternate Pavement Design Not Recommending Designing Both Alternates Based On Cost 6

The List 3R & 4R Projects Columbia Co SR 80 Sec 078 Allegheny Co SR 28 Sec A09 Allegheny Co SR 28 Sec A10 Washington Co SR 70 Sec Y20 Bucks Co SR 95 Sec TPK Somerset Co SR 6219 Sec 020 Monroe Co SR 209 Sec 007 7

Future Focus Is On Preservation Limited Dollars Bridge Priority Open Plan Schedules To Include Pavement Design 8

Asphalt Price Adjustment Who Cares Adjustments Made Based On Monthly Index When Material Is Placed vs The Index In The Proposal 9

LCCA AC Adjustment Factor Previously Calculated Based On Amount Paid For Projects Closed Out In Last 6 Months This Yields Untimely Factors 10

LCCA New Process AC Adjustments EARNED In Last 12 Months New Factor Calculated On 6 Month Basis Data Is Used In Calculation Of “C” Factor 11

Questions 12