Pavement Planning from a Life Cycle Perspective Life Cycle Assessment and Life-Cycle Cost Analysis.

Slides:



Advertisements
Similar presentations
Chapter 17 Completing the Audit Engagement McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Advertisements

MIT Research: LCA of Concrete Pavements. MIT Concrete Sustainability Hub $10 million investment over 5 years Funded equally by RMCREF & PCA NRMCA providing.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
Darren A. Craig COOPERATION, COLLABORATION, OR COLLUSION? ENHANCED ANTI-TRUST SCRUTINY January 9, 2014.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
Company Confidential Registration Management Committee (RMC) Confidentiality & Conflict of Interest Palm Beach, Florida January 16, 2013 R. Darrell Taylor.
1 Resurfacing and Curb Ramps. 2 FHWA’s Americans with Disabilities Act Program / Section 504 of the Rehabilitation Act of 1973 The primary purpose of.
Completing the Audit Engagement
ENVIRONMENTAL AND ECONOMIC BENEFITS OF CONCRETE May 2009.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
Slide 1-1 Chapter 2 Principles of Accounting Analyzing Business Transactions.
Antitrust Does Google have monopoly power? Microsoft? On what? Why? Why Not? Is that bad? Why? Can you name monopolies in other industries? Is Monopoly.
Sector/Industry Analysis
© 2007 by West Legal Studies in Business / A Division of Thomson Learning CHAPTER 20 Promoting Competition.
MIT Research: Effects of Inflation and Volatility on Construction Alternatives.
Planning the Audit; Linking Audit Procedures to Risk
18- 1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 18 Integrated Audits of Internal Control (For Public Companies Under Sarbanes-Oxley.
Thermally Insulated Concrete Pavements: Life-Cycle Cost Analysis Methods and Preliminary Results January 10, 2011 John Harvey Nick Santero Lev Khazanovich.
9- 1 Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall i t ’s good and good for you Chapter Nine New-Product Development and Product.
Senate Bill No. 863 Cost Monitoring – Current Update W o r k e r s’ C o m p e n s a t i o n I n s u r a n c e R a t i n g B u r e a u o f C a l i f o r.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
Concrete Sustainability Urban Living Laboratory & CSH 27 Oct 2010.
Ethics and professional Conducts for Civil engineers
Orphans in Actuarial Data DM-1: Data Cleansing for Predictive Modeling Jeremy Benson March 2012 – RPM Seminar.
Planning an Audit The Audit Process consists of the following phases:
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2010 Standard.
Considering Internal Control
Compensation events and claims Presented by Prof. Khem Dallakoti.
Copyright © 2006 by John Wiley & Sons, Inc. All rights reserved Ch. 10: Negotiating the Buy Price negotiation Types of discounts The services included.
Event - Date Event Address Line 1 To edit this information, click “View” and then click “Slide Master” under the Master Layout option. After changes are.
Procedural Safeguards. Purpose Guarantee parents both an opportunity for meaningful input into all decisions affecting their child’s education and the.
Copyright© 2010 WeComply, Inc. All rights reserved. 10/17/2015 Canadian Competition Law.
Antitrust. “Is there not a causal connection between the development of these huge, indomitable trusts and the horrible crimes now under investigation?
Ethics and the Audit Profession
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
Tapping Your Unseen Business Potential Fall 2009 Meeting October 1, 2009.
ABCD Case Studies Speaker Janet Fagan FCAS, MAAA Moderator: Wendy Germani FCAS, MAAA Casualty Loss Reserve Seminar Atlanta, Georgia September 9 – 11, 2015.
Chapter 20 Antitrust and Regulation of Competition Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without.
Doc.: IEEE b Submission November 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal.
What is a Resource? Any physical or virtual entity of limited availability A new or reserve supply that can be drawn upon when needed Something that one.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Insurance Company Operations.
Antitrust Law Compliance Policy and Guidelines November 19, 2004.
Business Law and the Regulation of Business Chapter 43: Antitrust By Richard A. Mann & Barry S. Roberts.
Chapter 23 Antitrust Law and Unfair Trade Practices.
FRCC Regional Entity Webinar NERC Reliability Standard Development Projects and Situational Awareness and Event Analysis October 30, 2013, 1:00 p.m. –
Standards Anti-Trust Compliance Briefing August 31, 2004.
Copyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall. Chapter
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
49-1 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
1 Patents / Intellectual Property Slides. 2 Membership & Affiliation SISO-ADM-002 requires PDG/PSG members to be SISO members Membership obtained through.
©2011 Ohio Rural Electric Cooperatives 2012 NESC Update Changes to Work Rules.
Audit Planning, Understanding the Client, Assessing Risks and Responding Chapter 6.

APEX Loadout and Batch.
Apex Quote to Cash Overview
Payments in the Digital age
2017 SOA Annual Meeting & Exhibit
Antitrust Notice The Casualty Actuarial Society is committed to adhering strictly to the letter and spirit of the antitrust laws. Seminars conducted under.
2017 Life & Annuity Symposium
Completing the Audit Engagement
Completing the Audit Engagement
Presenter Name Title of Presentation DATE.
2018 SOA Life & Annuity Symposium
MIT Research: Life Cycle Assessment of Concrete Pavements
Proportion of total R&D expenditure on alliances or joint ventures by stage of R&D in 2005 APRIL 2007 SOURCE: CMR INTERNATIONAL PERFORMANCE METRICS PROGRAM.
Motivation for 36OU Open Rack
ALASKA CONCRETE SUMMIT
STATEMENT OF ANTITRUST POLICY
WELCOME TO THE ICAE 2019 CONFERENCE Boulder, Colorado SEPTEMBER 22 – 25, 2019.
Presentation transcript:

Pavement Planning from a Life Cycle Perspective Life Cycle Assessment and Life-Cycle Cost Analysis

This presentation has been prepared solely for information purposes. It is intended solely for the use of professional personnel, competent to evaluate the significance and limitations of its content, and who will accept full responsibility for the application of the material it contains. The National Ready Mixed Concrete Association and any other organizations cooperating in the preparation of this presentation strive for accuracy but disclaim any and all responsibility for application of the stated principles or for the accuracy of the content or sources and shall not be liable for any loss or damage arising from reliance on or use of any content or principles contained in this presentation. Unless otherwise indicated, all materials in this presentation are copyrighted to the National Ready Mixed Concrete Association. All rights reserved. Reproduction, modification or retransmission in any form is prohibited without the prior written permission of the National Ready Mixed Concrete Association. © 2009 National Ready Mixed Concrete Association.

Antitrust Policy Statement The National Ready Mixed Concrete Association assigns the highest priority to full compliance with both the letter and the spirit of the antitrust laws. Agreements among competitors that unreasonably limit competition are unlawful under federal and state antitrust laws, and violators are subject to criminal fines and incarceration, civil fines and private treble-damage actions. Even the successful defense of antitrust litigation or an investigation can be very costly and disruptive. It is thus vital that all meetings and activities of the Association be conducted in a manner consistent with the Association’s antitrust policy. Examples of illegal competitor agreements are those that attempt to fix or stabilize prices, to allocate territories or customers, to limit production or sales, or to limit product quality and service competition. Accordingly, it is inherently risky and potentially illegal for competitors to discuss under Association auspices, or elsewhere, the subjects of prices, pricing policies, other terms and conditions of sale, individual company costs (including planned employee compensation), the commercial suitability of individual suppliers or customers, or other factors that might adversely affect competition. It is important to bear in mind that those in attendance at Association meetings and activities may include competitors, as well as potential competitors. Any discussion of sensitive antitrust subjects with one’s competitors should be avoided at all times before, during, and after any Association meeting or other activity. This is particularly important because a future adversary may assert that such discussions were circumstantial evidence of an illegal agreement, when viewed in light of subsequent marketplace developments, even though there was, in fact, no agreement at all. If at any time during the course of a meeting or other activity, Association staff believes that a sensitive topic under the antitrust laws is being discussed, or is about to be discussed, they will so advise and halt further discussion for the protection of all participants. Member attendees at any meeting or activity should likewise not hesitate to voice any concerns or questions that they may have in this regard. Adopted by the NRMCA Board of Directors September 18, 2006.

Life Cycle Assessment

Life-Cycle Cost Analysis

Goal: Make pavements more sustainable Find the largest opportunities to reduce emissions in the pavement life cycle?

High volume road: Route 101 in Oxnard, CA (at Route 232 junction) 65 mph highway 3 lanes each direction + 4 shoulders Daily traffic: 139,000 (Of which trucks: 6,672) Moderate volume road: Route 67 in Ramona, CA (at Route 78 junction) 35 mph urban road 2 lanes in each direction + 4 shoulders Daily traffic: 23,400 (Of which trucks: 1,357) Low volume road: Route 178 in Sequoia National Forest 35 mph rural road 1 lane in each direction Daily traffic: 5,200 (Of which trucks: 468) Model Scenarios

Deflection

Roughness

Concrete’s LCCA

Return on Investment – Historically

Return on Investment – Today

Initial Cost Comparison FDOT Asphalt Design Subgrade 5.5” Asphalt Ty-SP 12” Limerock Base Course (LBR = 100) ” Frict. Course 12” Type-B Stabilized Subgrade (LBR=40) FDOT Concrete Design MEDPG Optimized Concrete 23% 3% 1” Asph. Structural Layer 12.0” PCC Jointed w/ Dowels 4” ATPB non-structural 12” Type-B Stabilized Subgrade (LBR=40) Subgrade 1.5” Asph. Structural Layer 10.0” PCC Jointed w/ Dowels 12” Limerock Stabilized Base (LBR=70) Subgrade Initial costs for 10 miles, 2 lanes & Shoulders. Costs include Pavement, base, and subgrade stabilization materials and labor Asphalt = $85.00 / ton, Concrete CY Price = $ ($94.62/CY + $10/CY for delivery) M $ The Florida DOT Example Mechanistic Empirical Design Pavement Guide (MEDPG) provides optimized pavement design Slide Courtesy of Cemex, Inc.

“Perpetual Pavement” “Perpetual Payment”

Concrete Rehab: Patch & diamond grind at years 30 and 45 Asphalt Rehab: 4” AC Overlay in years 14 & 28 2” Mill / 4” AC Overlay in year 42 Design – Asphalt: 6.5” AC (inc 1.5” PFC) / 12” Limerock (LBR=100) / 12” Limerock (LBR=40); Concrete: 10” JPCP / 1.5” AC / 12” Limerock (LBR=70) Initial costs - Pavement, base, and subgrade stabilization materials and labor (Asphalt = $85.00 / ton, Concrete = $94.62 / CY) Rehabilitation - Concrete activities based on MEPDG, Asphalt Activities based on standard FDOT Standards Current year costs for asphalt are inflated at 5.9% and concrete at 4% Rehab costs also include other Incidental Costs (striping, mob, etc) - Assumed to be 40% of Material Costs and Traffic Control - 5% of material cost, Engineering & Inspection - 5% of material cost Nominal Expenditures by Pavement Type for 10 MilesTotal Cost Net Present Value Concrete Asphalt ASPHALT’S HISTORICAL 5.9% INFLATION GREATLY INCREASES THE ASPHALT COST OF OWNERSHIP M $ Asphalt is 84% more expensive when using historical inflation rates year 84%

Concrete Rehab: Patch &diamond grind at years 30 and 45 Asphalt Rehab: 4” AC Overlay in years 10 & 20 2” Mill / 4” AC Overlay in years 30, 40, and 50 Design – Asphalt: 6.5” AC (inc 1.5” PFC) / 12” Limerock (LBR=100) / 12” Limerock (LBR=40); Concrete: 10” JPCP / 1.5” AC / 12” Limerock (LBR=70) Initial costs - Pavement, base, and subgrade stabilization materials and labor (Asphalt = $85.00 / ton, Concrete = $94.62 / CY) Rehabilitation - Concrete activities based on MEPDG, Asphalt Activities based on 2003 FDOT Pavement management records for interstates. Current year costs are inflated at 4% Rehab costs also include other Incidental Costs (striping, mob, etc) - Assumed to be 40% of Material Costs and Traffic Control - 5% of material cost, Engineering & Inspection - 5% of material cost Nominal Expenditures by Pavement Type for 10 MilesTotal Cost Net Present Value Concrete Asphalt ACTUAL 10 YEAR ASPHALT REHABILITATION SCHEDULES AND HISTORICAL 5.9% INFLATION ARE COMBINED M $ Using FDOT history and historical inflation, asphalt’s is 152% more than concrete year 152%

Miles of Roadway End Lane Miles = 8,316Trad. Concrete = 5,849 Asphalt = 9,425MEPDG Concrete Lane Miles

Miles of Roadway Lane Miles End Lane Miles = 8,316Trad. Concrete = 5,849 Asphalt = 9,425MEPDG Concrete

web.mit.edu/cshub