1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Great Western Corridor Feasibility Study
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
Titusville to Edgewater Bike Loop PD&E Study
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Golden Triangle Blvd. Progress Report March 27, 2007.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
I-65 Added Travel Lanes Project in Tippecanoe County
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
From Island Estates Parkway to St. Johns County Line.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Project Location Map Contents of Presentation Welcome Project Location Map Contents of Presentation Agency Involvement & Responsibilities Project Purpose.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Metro Highway Program Presentation to CMAA Abdollah Ansari
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
WELCOME! February 26, 2013 ODOT District 1. ion.ohio.gov 2 February 26, 2013 PURPOSE OF TONIGHT’S MEETING Provide a project overview Provide.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
I-80 San Pablo Dam Road Interchange Project – Phase 1.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
TRANSPORTATION PROGRAMS Re-Allocation of Unobligated ARRA Funds – Policy Options Eileen Yazzie Transportation Policy Committee September 23, 2009.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
11 Ina Road Traffic Interchange Project Update Marana Chamber of Commerce Business Connection Luncheon May 18, 2016 Greg Byres, PE, Senior Urban Project.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Hazel Avenue Widening Project Presentation To CGSA April 25, 2017
Project Management Team Meeting #3
Public Workshop #1 August 18, 2010.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
1200 West Widening and Reconstruction Project
Contract 60X10 Informational Meeting Weber I-55
Meadow Lake Boulevard Street Extension Project
Presentation transcript:

1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014

2 Agenda Introductions Background Loop 303/US 60 traffic interchange Loop 303 widening El Mirage Road traffic interchange Project features Timeline Q&A

3 Loop 303 improvement projects Background 1984 – Maricopa Association of Governments (MAG) identifies a need for a West Valley regional connector freeway 1985 –Proposition 300 approved to fund the MAG Regional Transportation Plan (RTP) 2001 – First Environmental Assessment (EA) completed by Maricopa County, public meetings held 2004 – Voters approve Proposition 400 to extend the half-cent sales tax for 20 years 2006 – ADOT reassumed operation and maintenance of Loop 303 from MCDOT 2007 – EAs are done for Loop 303 from I-10 to I – ADOT published its draft EA for Loop 303 from I-10 to US 60 and held public hearings – The federal government approved the EA and construction began between I-17 and Happy Valley Pkwy. and at Bell, Waddell and Cactus roads – In March, construction of Bell, Waddell and Cactus roads complete, and then in May Loop 303 opened between I-17 and HVP. Construction began on Mountain View Blvd. to Peoria Ave. section in August and the traffic interchange at I-10 in December – Construction begins on additional segments of Loop 303 between Thomas Road and Peoria Ave – All Loop 303 segments between I-10 and Bell Road will be constructed, including the I-10/ Loop 303 interchange.

4 Loop 303/US 60 traffic interchange Current conditions

5 Partial cloverleaf $48.4 million programmed Reconstruction of existing interchange Ramps connecting US 60 and Loop 303 Widening Loop 303 over US 60 and railroad New sheilded lighting Noise mitigation Rubberized asphalt Traffic signals Loop 303/US 60 traffic interchange Design

6 Proposed walls Along Loop 303 southeast of US 60 Both sides of roadway Along Loop 303 northwest of US 60 South side of freeway Proposed earth berm Loop 303/US 60 traffic interchange Sound walls

7 Loop 303 US 60 to Happy Valley Pkwy Design Roadway widening project From US 60 to Happy Valley Parkway $52.1 million programmed Expands Loop 303 to three lanes in each direction Rubberized asphalt Sound walls along south side of freeway Native landscaping

8 Loop 303 US 60 to Happy Valley Pkwy Roadway Section – closed median Three travel lanes in each direction Median barrier wall US 60 to El Mirage Road

9 Loop 303 US 60 to Happy Valley Pkwy Roadway Section – open median Three travel lanes in each direction Open median and cable barrier El Mirage Road to Happy Valley Parkway

10 Loop 303 US 60 to Happy Valley Pkwy Sound walls Sound walls on south side of freeway 8’ to 18’ high

11 Loop 303 US 60 to Happy Valley Pkwy Sound wall appearance

12 El Mirage Road/Loop 303 Current conditions N

13 El Mirage Road/Loop 303 Design Full diamond interchange Loop 303 over El Mirage Road $31 million programmed El Mirage Road Three through lanes, bikes lane, dual left turn lanes, sidewalks on both sides Ability for future expansion north of Loop 303 Sound wall on bridge to mitigate noise

14 El Mirage Road/Loop 303 Traffic Interchange

15 El Mirage Road and Loop 303 Sound mitigation Sound wall on El Mirage Road overpass 8’ high Sound walls along south side of Loop 303 8’ to 18’ high

16 Loop 303 projects Other features Freeway lighting Median and shoulder lighting along Loop 303 Lighting at traffic interchanges Aesthetics Drainage improvements

17 Loop 303 projects Overall timeline TODAY All projects in design SUMMER 2014 Loop 303 widening project anticipated to begin construction WINTER Construction on interchanges at Grand Avenue and El Mirage Road begins 2016 All three projects will be completed

18 ADOT sound policy Overview ADOT mitigates noise at 64 decibels. Three decibels lower than the federal standard An increase of 10 decibels sounds twice as loud to the average listener. Doubling highway traffic volume increases noise by 3 decibels. ADOT uses a variety of methods to reduce noise for residents. Sound walls Earth berms Rubberized asphalt

19 Stay updated! Sign up for updates at azdot.gov Project website: azdot.gov/Loop303 Project hotline:

20 Question and Answer Please use a microphone Members of the project team will remain after the meeting to answer questions and comments one-on- one