Corridor-Wide Construction Presentation to FDOT Materials Lab

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Capital Beltway HOT Lanes Project Project Update March 2009.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
I-65 Added Travel Lanes Project in Tippecanoe County
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
From Island Estates Parkway to St. Johns County Line.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
The Miami Intermodal Center September 23, 2009 Is Becoming a Reality!
75 Express Lanes Project From NW 170 Street to I-595 Corridor Advisory Committee Meeting Wednesday, July 15.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
FULL FREEWAY CLOSURES RECENT SUCCESS STORIES IN KENTUCKY.
Community Development Department Construction Phase.
I-495 NORTHERN SECTION SHOULDER USE PROJECT State Project No , P101, C501 CITIZEN’S INFORMATION MEETING UPC NOVEMBER 19, 2013.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
Program Manager Administrator
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Four Winds Condominium Association August 2, 2017
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
District 3 Complete Streets Projects
The Oakton Condominium Association September 12, 2017
From North of River Road to North of State Road 681
US26: Cornelius Pass Rd -185th Ave
Citrus Park Drive Extension
Florida Transportation Commission FY 2009
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Contract 60X10 Informational Meeting Weber I-55
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
Jaime Jordan, PE Project Manager Eric Germundson, EI Roadway Designer
Presentation transcript:

Corridor-Wide Construction Presentation to FDOT Materials Lab 75 Express Lanes Corridor-Wide Construction From NW 170 Street to I-595 Presentation to FDOT Materials Lab Tuesday, August 19, 2014

Project Team Paul Lampley, P.E. – FDOT Construction Program Manager Antonio Castro, P.E. – FDOT Construction Project Manager Robert Bostian, P.E. – FDOT Design Program Manager Vanita Saini, P.E. – FDOT Design Project Manager Raj Rangaswamy, P.E. – CEI Senior Project Engineer, Target Engineering Group Aurelio Matos, P.E. – CEI Senior Project Engineer, CH Perez & Associates Scott Gombar, P.E. – CEI Senior Project Engineer, Eisman Russo Jeremy Grady, P.E. – CEI Bridge Project Administrator, Corradino Group Amanda Carballo – Construction Public Information Officer Christopher Lewis, P.E. – Corridor-wide Geo-technical Engineer (FGE) I-75 Express – Corridor-wide

Project Limits State Road (SR) 826 from W. Flagler Street to I-75 and I-75 from SR 826 to I-595 (Total 28 miles) D4 Segment : I-75 from NW 170 Street to I-595 (15 miles) D6 Segment: SR 826 from W Flagler Street to NW 154 Street and I-75 from SR 826 to NW 170 Street (13 miles)

Regional Managed Lanes Network I-75 Express – Corridor-wide

Project Overview Project Location Segment E – North of Griffin Road to I-595 (4.7 miles) Segment D - South of Sheridan Street to North of Griffin Road (3.7 miles) Segment C - South of Miramar Parkway to South of Sheridan Street (3.6 miles) Segments A & B – NW 170 Street to South of Miramar Parkway (3 miles) I-75 Express – Corridor-wide

Scope of Work Constructing Express Lanes in the existing I-75 median Constructing ingress and egress points throughout the corridor Constructing direct connections to 595 Express, Palmetto Express and Florida’s Turnpike (HEFT) Reconstructing the interchanges at Sheridan Street, Miramar Parkway, Miami Gardens Drive and the HEFT Constructing sound barrier walls at various locations Installing additional traffic cameras, dynamic message signs and toll gantries Adding new signals, signage, lighting and landscaping I-75 Express – Corridor-wide

Construction Schedule Projected Express Lane Openings Partial Corridor Opening in Spring 2017 Full Corridor Opening in Summer 2017 Construction Completion in Late 2018 ITS Integration Completion in Summer 2019 I-75 Express – Corridor-wide

75 Express Lanes Typical Section Centered in existing I-75 median Separated from the General Purpose Lanes Two northbound and two southbound lanes Separated by concrete barrier wall Full width paved shoulders I-75 Express – Corridor-wide

Ingress & Egress Ramps I-75 Express – Corridor-wide I-75 Mainline NOT TO SCALE I-75 Mainline Express Lanes I-75 Mainline Visit the Access Points page to view all of the Ingress and Egress ramps I-75 Express – Corridor-wide

From North of Griffin Road to I-595 Segment E Overview From North of Griffin Road to I-595 Construction start date: March 2014 Estimated construction completion date: Summer 2017 Construction cost: $75 million CEI: Target Engineering Group, Inc. Design-Build Team: Dragados USA/Parsons Brinckerhoff I-75 Express – Corridor-wide

650,000 Cubic Yards of Embankment 29,000 Length of Drainage Major Work Elements 2 Bridges 2,300 Bridge Length 650,000 Cubic Yards of Embankment 29,000 Length of Drainage 31,000 Tons of Asphalt Contractors Quality Control Firm: Terracon I-75 Express – Corridor-wide

Proposed Plan View of R3 Ramp I-75 Express – Corridor-wide

Proposed Connection Bridge to 595 Express Lanes Direct connect from 75 Express Lanes to 595 Express Lanes Temporary ramp closures and detours will be scheduled I-75 Express – Corridor-wide

From of South of Sheridan Street to North of Griffin Road Segment D Overview From of South of Sheridan Street to North of Griffin Road Construction start date: September 2014 Estimated construction completion date: Summer 2018 Construction cost: $80 million CEI: Target Engineering Group, Inc. Design-Build Team: Ranger Construction/Wantman Group I-75 Express – Corridor-wide

982,600 Cubic Yards of Embankment 25,000 Length of Drainage Major Work Elements 2 Bridges 540 Bridge Length 982,600 Cubic Yards of Embankment 25,000 Length of Drainage 55,400 Tons of Asphalt Contractors Quality Control Firm: Tierra South Florida I-75 Express – Corridor-wide

New Improvement Features C-11 Canal Bridge New Improvement Features Scope of Work: New Express Lane bridge I-75 Express – Corridor-wide

Sheridan Street Interchange I-75 Express – Corridor-wide

Sheridan Street Interchange New Improvement Features Scope of Work: Constructing ponds at the interchange Widening the Sheridan Street bridge to the north and replacing the existing bridge deck Installing additional signalized turn lanes Installing new sidewalk on the bridge Upgrading signage, lighting, landscaping and signals I-75 Express – Corridor-wide

From South of Miramar Parkway to South of Sheridan Street Segment C Overview From South of Miramar Parkway to South of Sheridan Street Construction start date: June 2014 Estimated construction completion date: Summer 2018 Construction cost: $85 million CEI: A&P Consulting Transportation Engineers Design-Build Team: Ranger Construction/Wantman Group I-75 Express – Corridor-wide

858,900 Cubic Yards of Embankment 39,000 Length of Drainage Major Work Elements 2 Bridges 910 Bridge Length 858,900 Cubic Yards of Embankment 39,000 Length of Drainage 55,000 Tons of Asphalt Contractors Quality Control Firm: Tierra South Florida I-75 Express – Corridor-wide

Miramar Parkway Interchange I-75 Express – Corridor-wide

Miramar Parkway Interchange New Improvement Features Scope of Work: Reconstructing a new bridge to accommodate the new I-75 Express Lanes (60 feet longer and 36 feet wider) Reconstructing the interchange ramps at Miramar Parkway Installing additional signalized turn lanes Installing new sidewalk on the south side of the bridge Signage, lighting and signal upgrades I-75 Express – Corridor-wide

Miramar Parkway Interchange Existing Interchange Features Sidewalk on north side only Dual-left turn lanes (WB to SB) Dual-left turn lanes (EB to NB) Existing left turn lanes New Improvement Features New signalized ramps Dual-left turn lanes (EB to NB) Extended left turn lanes for maximum capacity New sidewalk on both sides Triple-left turn lanes (WB to SB) New sidewalk on both sides Option for future triple-left turn lanes I-75 Express – Corridor-wide

Pembroke Road Bridge I-75 Express – Corridor-wide

Scope of Work & Schedule Pembroke Road Bridge Scope of Work & Schedule Collaborative effort between Broward County & FDOT Broward County will construct bridge approaches FDOT will construct the bridge over I-75 Broward County began bridge approaches – June 2014 FDOT to start bridge construction – September 2014 Broward County to complete overpass Final paving, signing, striping, and lighting Anticipated opening by Broward County – late 2016 I-75 Express – Corridor-wide

Pembroke Road Bridge Bridge Features Four-lane divided bridge with inside and outside shoulders Bike lanes and sidewalks on both sides Lighting on the south side of the bridge I-75 Express – Corridor-wide

From NW 170 Street (Miami-Dade County) to South of Miramar Parkway Segments A & B Overview From NW 170 Street (Miami-Dade County) to South of Miramar Parkway Estimated construction start date: Late 2014 Estimated construction completion date: Spring 2019 Construction cost: $234 million CEI: The Corradino Group Design-Build Team: Community Asphalt/Wantman Group I-75 Express – Corridor-wide

2.0million Cubic Yards of Embankment 60,000 Tons of Asphalt Major Work Elements 14 Bridges 6,880 Bridge Length 2.0million Cubic Yards of Embankment 60,000 Tons of Asphalt Contractors Quality Control Firm: Construction Testing Inspection (CTI) I-75 Express – Corridor-wide

Proposed I-75/HEFT Interchange I-75 Express – Corridor-wide

Proposed I-75/HEFT Interchange Miami Gardens Drive Ramp H-10 and H-11 Ramp H-12 Ramp H-7 HEFT Ramp H-13 Ramp H-5 I-75 Express – Corridor-wide

Proposed I-75/HEFT Interchange Ramp H-4 Snake Creek Road Bass Creek Road I-75 Express – Corridor-wide

Miami Gardens Drive Interchange New Improvement Features Scope of Work: Modifying the existing bridges to accommodate the new I-75 Express Lanes and the new ramps Reconstructing the interchange ramps Signage, lighting and signal upgrades I-75 Express – Corridor-wide

Sound Barrier Walls Ground Mounted Sound Barrier Walls To be completed within the first half of the Segment contract Direct coordination with affected communities Hours of operation Daytime work only No weekend work I-75 Express – Corridor-wide

Sound Barrier Wall Location Segment E Benefited communities Highland Ranch Estates New River Estates Woodgate Condos Vista Filare Royal Palm Forest Oak I-75 Express – Corridor-wide

Sound Barrier Wall Location Segment D Benefited communities Sheridan Glen The Crossbow Waverly Hundred Falcon’s Lea Waterford Hawkes Bluff Ivanhoe Estates Chelsea I-75 Express – Corridor-wide

Sound Barrier Wall Location Segment C Benefited communities Windsor at Miramar Villas at Nautica Cobblestone Townhomes Towngate I-75 Express – Corridor-wide

Sound Barrier Wall Location Segments A & B Benefited communities Royal Landings West Lakes Estates Century Gardens Lakes on the Green Marbella Park West Riviera Isles Huntington Courtyards at Nautica I-75 Express – Corridor-wide

Project Public Information Officer Amanda Carballo Stay Informed Sign up for Construction Updates and Lane Closure Information: Project Public Information Officer Amanda Carballo (954) 548-2754 amanda@iscprgroup.com For more information on lane closures and other project details, log onto the FDOT Construction website at www.75-express.com I-75 Express – Corridor-wide

We welcome your comments and questions. I-75 Express – Corridor-wide