45 th Ave S Shared Street Design Commission September 17 th, 2009 Megan Hoyt SDOT Traffic Operations.

Slides:



Advertisements
Similar presentations
Pedestrian Issues: Business and Commute Travel in South Park Existing Facilities, Gaps and Recommended Improvements.
Advertisements

Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
No Fault Asphalt has been providing asphalt services throughout Northern California for over 25 strong years. Certified by CALTRANS, and by several institutions,
Titusville to Edgewater Bike Loop PD&E Study
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
In March 2015, Mayor Murray announced a proposal for a new 9-year, $900 million transportation levy to replace the Bridging the Gap levy that expires at.
Southern Corridor Study Recommendations March 16, 2011.
West Plumb Lane Project Preliminary Design Public Information Meeting June 4, 2012.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding  Fall Presented ‘gaps’ and possible project solutions to WHCA in.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.
Mission Statement To develop a vision of how we, the citizens of Folly, want Center Street to be transformed into the “Gateway to our city.” Then deliver.
Safety Audit Components Safety assessment for risk Management.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Grand Canalscape Phase I: Phoenix Uptown and Gateway North Update Kerry Wilcoxon City of Phoenix Street Transportation Department Safety and Neighborhood.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
What does PWD do for our City?. Administrative Services Engineering Operations.
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
Portside Logistics Boundary Rainier Pointe Access Library Local Improvement District Formation Hearing LID 14-1 for Construction of 66 th Avenue East March.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Grand Canalscape Phase I and II General Update October 30, 2015.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Complete Streets Plan Philadelphia Vision Zero Presented by Raj Mohabeer PLA, ASLA, AICP, LEED®AP December 3, 2015 Detroit’s.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Twin Peaks – Mt. SutroTwin Peaks – Mt. Sutro Connector Trail Community MeetingConnector Trail Community Meeting February 2, 2016February 2, 2016.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Belmont Pavement Reconstruction Project October 15, 2014.
City of Cambridge Department of Public Works October 19, 2010 Schedule: Construction Beginning: October 2010 Construction Duration: 18 months Contractor:
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
MANDATORY REFERRAL REVIEW PRINCE GEORGE’S COUNTY MEMORIAL LIBRARY SYSTEM (PGCMLS) NEW CARROLLTON BRANCH LIBRARY PROPOSED RENOVATIONS PRINCE GEORGE’S COUNTY.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
Basis of recommendation (cont.) 3.Insufficient green/open space (pgs. 3-4)  Green/open space within the site inadequate to serve estimated population.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
8 th Ave S 2016 Pedestrian Improvements South Park Neighborhood Association David Allen, Sue Byers, Alisa Arment April 12, 2016.
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Neighborhood Project Funds
Marina Vista Streetscape Project
Interdisciplinary teams Existing or new roadway
1. Neighborhood Safety Program 2. ICS traffic and security 3
OLD TOWN COMMUNITY WORKSHOP
ELM AVENUE STREETSCAPE & SAFETY IMPROVEMENTS (University Parks Dr
STREETS & STORMWATER DEPARTMENT
Site Analysis ID 240 Spring
Early Voting Starts Oct. 20 | Election Day Nov
Meadow Lake Boulevard Street Extension Project
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

45 th Ave S Shared Street Design Commission September 17 th, 2009 Megan Hoyt SDOT Traffic Operations

2009 Sidewalk Development Program 25 blocks constructed in 2009 under Bridging the Gap Standard sidewalk construction (6’ sidewalk, planting strip, curb and gutter) Prioritization criteria highlights LRT and proximity to services

Project Background Ranks high in both original and revised (Pedestrian Master Plan) criteria Rainier Beach H.S. Link Light Rail Station Mapes Creek Dunlap Elementary South Shore K-8 45 th Ave S S Cloverdale St S HendersonSt Rainier Ave S MLK Jr. Way S

45 th Ave S details Zoning is Single Family Right-of-Way is only 40’ No existing drainage facilities RPZ parking zones installed summer 2009

Original Options

Public Outreach Residents of 45 th Ave S –Meeting in late May –Significant outreach throughout summer Seattle Fire Department Seattle Public Utilities SDOT Neighborhood Traffic Program

Shared Street Details 13’ of access maintained Asphalt paving, established parking stalls, landscaping

Parking space and crosswalk delineation Stamped asphalt delineates 7’ x 20’ parking space Stamped colored asphalt crosswalks at entries

Curbless Street – Edge Treatment Asphalt edge ends at landscaping Need spot treatment to discourage illegal parking. Options include: –Short concrete curbs –Thickened asphalt edge –Wheelstops

Landscaping Eight new trees planted Approx SF of new landscaped area Planting scheme: –Kelsey Dogwood (groundcover) –Geranium (groundcover) –English Lavender –Red flowering Currant –Sword Fern –Orchid Rockrose –Lipstick Strawberry (groundcover)

Timeline Construction scheduled to begin Sept 28 th Expected completion end of October.