CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
SUNY Canton Facilities Project Update Miscellaneous.
Bartholomew Consolidated School Corporation Additions and Renovations to Columbus East and North High Schools Additions and Renovations to Columbus East.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Bond Election Presentation 2014 Webb Consolidated ISD.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
SCHEMATIC DESIGN PRESENTATION
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Building Services Department Summer Building Services Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Finishing the Building
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Klein High School Original building built in 1963 Move KHS to HS #5 in 2011 Move back to renovated KHS in 2013.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Sinking Fund Millage Renewal Election- May 7, 2013.
Design Development Code analysis Partition types.
Capital Improvement Program for September 9, 2014.
Ashland School District Facility and Capacity Assessment Report 2005 Dull Olson Weekes Architects Inc.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
Learning, Health, and Safety Capital Project Alternates and Change Order
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
South Greenville Recreation Center and Park Master Plan.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Building Services Summer 2016 Update
OABCIG General Obligation Bond Referendum Presentation
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Strategic Planning & Operations
Capital Improvements Presentation
May 8, 2018 Bond Program.
2911 AW Grimes Blvd., Pflugerville TX 78660
UNION GROVE ELEMENTARY REFERENDUM
Troy School District Bond Program – Series 1 Construction Update
2018 Bond Review and Proposal
2007 Bond Issue Capital Improvement Program
Capital Outlay Workshop
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
Master Facilities Committee Evaluation and Identification
Chimacum District Facility & Program Plan
Stoughton Public Library
EAST PENNSBORO AREA SCHOOL DISTRICT
Zumbrota-Mazeppa School District Community Survey Results
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Finance and Facilities

DuPage County, IL

EAV Growth History (Five Year Average: -2.15%)

CCSD 66 Tax Rate Trend

School Year 600 Other (green) 500 Capital Outlay (red) 400 Supplies and Materials (purple) 300 Purchased Service (brown) 200 Employee Benefits (pink) 100 Salaries (yellow)

CCSD 66 is BLUE in this slide

School Year

CCSD 66 is 15th out of 28 elementary districts in DuPage. $6.35 per mile (ave. is $6.37)

Lakeview J.H. School 1.Provide new door from Corridor 187 into Band Storage Renovate Resource Rooms 123 & 124 (both were demolished during the 2003 renovations).

Elizabeth Ide School 1. Provide tempered glazing in all exterior and interior windows and doors including display cases near Main Office. 2. Refinish wood door to Sound Room 110A. 3. Refinish drywall walls in Sound Room 110A. 4. Provide self-closing device on door to Faculty Lounge 127, Kitchen Storage 5. Provide fire-stopping between walls and roof deck in Storage Room Provide ventilation improvements in Kitchen 160. Lakeview J.H. School 7. Provide intumescent coating on exposed wood framing in Mechanical Room 144, Storage Room 174, Sound Room 177A, Industrial Arts (Music) 8. Provide tempered glazing in all exterior and interior windows and doors. 9. Provide self-closing device on door to Faculty Lounge Provide gypsum board

Lakeview Jr. High School 1.New science classroom 2.Gymnasium addition Prairieview Elementary School 1.New intermediate building

Elizabeth Ide School 1. Provide ADA compliant classroom entrances on Classrooms 105, 106, 143, and Enclose and renovate Computer Room 112 and Open Unit Enclose and renovate Open Activity Unit 151, Early Childhood Room 150, and Large Motor Room 149A including new SAT ceiling system and lights. 4. Provide door to Faculty Lounge Remove Vault Room and create Conference Room Remove and replace SAT ceiling system and lights in Faculty Lounge 128 and Main Office 130. Lakeview J.H. School 7. Enclose and renovate open unit Classroom 136 including new ADA compliant classroom entrance, flooring, new display boards, and new countertops. 8. Renovate Classrooms 137 and Computer Lab 141 including new ADA compliant classroom entrances, flooring, new display boards, and new countertops. 9. Renovate Storage Room 192 into Music Classroom 192 including new ADA compliant classroom entrance, flooring, new SAT ceiling system, new display boards, new lavatory, and new electric water cooler.

Lakeview Jr. High School 1.Remove and replace roofing system over entire existing roof area. 2.Remove and replace fire alarm system and public address system throughout building. Elizabeth Ide School 1. Remove and replace fire alarm system and public address system throughout building.

Lakeview Jr. High School 1. Provide new door and frame at Corridor 125A. 2. Remove and replace doors & frames at Boys' Locker Room Storage, Girls' Locker Room Storage, and Storage Room Remove and replace exterior egress doors from Multi- Purpose Room 168 and Cooking Lab Provide additional mechanical exhaust in Art Classroom Remove and replace various sections of concrete walk at the Main Entrance. 6. Remove and replace concrete walk separating parking lot from building.

Lakeview Jr. High School 1. Renovate Home Ec. Classroom Remove and replace casework in Faculty Lounge Provide pass-through window from Vestibule 156 to Main Office 135.

Elizabeth Ide School 1. Renovate four student toilet rooms (118, 122, 123, & 156). 2. Provide fire rated door on Water Heater Room in Art Supply Provide full height partition around Open Unit Remove and replace ceiling in Open Unit Remove and replace electric water coolers and provide ceramic wall tile in Open Unit 113, Open Unit 151, and across from Library Remove and replace vinyl composite tile (VCT) flooring throughout the building. 7. Provide carpet tile flooring throughout the Main Office suite, Library 120, and Corridors 119, 121, 137, & Remove and replace casework in the Faculty Lounge Provide maintenance service on main electrical switchgear and provide protective wire mesh partition. 10. Provide keyed switching of lights in Gymnasium162.

Lakeview Jr. High School 11. Renovate four student toilet rooms (129A, 129B, 152,& 153) in original building. 12. Remove and replace doors at six locations: Staff Toilet Rooms 125B &125C, Custodial 129C, Custodial 153A, Entrance to Girls' Locker Room 158, and Entrance to Boys' Locker Room Remove and replace doors & frames at two locations: At entrance to Multi-Purpose Room 168 (including brick wing walls) and at Storage Room Provide three-way switching of lights in Storage Room Remove and replace vinyl composite tile (VCT) flooring in Stage 131, Multi-Purpose Room 168, Kitchen 169, Kitchen Storage 170, Art Classroom 178, and Storage Room Remove VCT flooring and provide poured epoxy flooring in Girls' Locker Room 158 and Boys' Locker Room Provide ADA compliant handrails at stairs to Stage Remove and replace casework in Art Classroom 178.

Elizabeth Ide School 1. Mill and overlay 2.0" of asphalt at entrance drive, drop-off lane, exit drive, service drive and service parking lot. 2. Asphalt patching and sealcoating of main parking lot. Prairieview & Lakeview Jr. High School Campus 3. Mill and overlay 2.5" of asphalt at entrance drive and bus drop-off lane. 4. Asphalt patching and sealcoating of Prairieview parking lot. 5. Asphalt patching and sealcoating of Lakeview JH parking lot. 6. Provide concrete bus storage lot including 12-foot high cedar fence, detention basin, and site storm drainage improvements south of Prairieview School.

Currently Conducting a Facility Needs Assessment » Visioning / Educational Adequacy » Facility Assessment » School Safety Assessment » Space Utilization & Capacity Study

Fiscal Year Debt Service Schedule

CCSD 66 New Growth – Residential (Updated Oct. 2013) Smote Development – potential 110 single family homes (built in phases)

CCSD 66 New Growth – Residential (Updated Oct. 2013) Pulte Development – potential 152 single family homes (built in phases)

CCSD 66 New Growth – Residential (Updated Oct. 2013) Dunham St. Development – potential single family homes