INDIAN VALLEY COMMUNITY SERVICES DISTRICT. It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition,

Slides:



Advertisements
Similar presentations
Power Plant Engineering
Advertisements

East Carolina University Compressed Gas Safety Training Program
Struck By/Caught Between 29 CFR 1926 Objectives In this course, we will:  Recognize potential struck by/caught between scenarios  Identify and recognize.
Introduction This module defines the differences
Chapter 8 Pricing General Expenses. Introduction The direct costs of a building project include the cost of labor, material, equipment, and subtrades.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Safety Update Kevin Murphy Manager, Gas Distribution Safety and Technical Training Page 1.
Presentation on Sustainable Fire Services.  The Problem:  Fire Department Operations are Unsustainable.  Two Things have changed:  Operations  Loss.
The City of North Bend Sanitary Sewer System
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Pavement Restoration on Main Replacement Projects Pipe Splitting and Keyhole Technology At Southwest Gas Corporation Southwest Gas Corporation Kenny Pollock.
Railroad Safety For the Fire Investigator and Firefighter.
Place a winter emergency kit in each car that includes: A shovel Windshield scraper and small broom Flashlight Battery powered radio Extra batteries Water.
WATER DEPARTMENT BUDGET WORKSHOP FY16 RECOMMENDED BUDGET March 12, 2015.
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
Loader/Backhoe Safety Training
Safety Meeting Protective Equipment EDM Services, Inc. March 2008.
LLANO COUNTY MUD #1 ROAD PROJECT REVIEW PURPOSE DISCUSS POSSIBILITY OF COMPLETING REMAINING ROAD UPGRADE PROVIDE FACTS TO INFORM COMMUNITY TO MAKE DECISION.
Public Meeting October 20,  Revenues  Expenses  Contract Services.
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
Material Handling & Lifting Resource
Transportation Services Budget February 4, 2010 Josh Davis, Director 1.
Part 3.3 Production Safety. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand safety.
Operations Railroad Communica- tions Hazmat & Safety Personnel.
Parking Business Unit Motivational Program Consolidating motivational initiatives for Bussing and Parking Operations Airport Ground Transportation Association.
1 Public Works Operations March 11, Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.
1. Maintenance Alignment with District ‘s Mission and Board and Superintendent’s Goal 2. Impacts of recent budget reductions 3. Review Energy Grant 4.
MODULE 6 Vehicle Parking, Servicing, and Security.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Environmental Awareness. –The primary goal of the well site owner, well owner/operator, and well service contractors is to provide a safe and clean work.
Director Rules and Field Support October 30, 2006.
Risk management and disaster preparedness
Chirstchurch: Pipelines. Earthquake Concerns on Underground Pipes Wave propagation Permanent ground deformation Liquefaction Can lead to pipe leakage.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
Office of Safety & Health Consultation presents
1 Public Hearing User Rate Adjustments April 8, 2008.
The City of Mesa EFV Program Anthony Cadorin Gas Planning Engineer City of Mesa Natural Gas Division Mesa, Arizona.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Excavation & Trench Safety
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
1 Emergency Preparedness for Utilities Presented by: Chris Saunders Team Manager, Annapolis Sewer Service Area Anne Arundel County Bureau of Utilities.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
1 Camden County Road & Bridge Department Larry E. Lampe Superintendent This presentation will probably involve audience discussion, which will create action.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
Workshop developed by RCAP/AWWA and funded by the USEPA
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Week 3, March 13, 2017.
Environmental Services
Objectives Upon completion of this module you should be able to:
2018 – 2020 Budget| Presented by: Terry Ostrom
NORTH TRUNK SEWER REPLACEMENT PROJECT
Public Meetings Resident Submissions Community Groups Social Media
Chemical Transfer.
CONSTRUCTION METHODS & TECHNOLOGY
Parkland/Brookdale Interceptor Replacement
City of Clarksville Fleet Maintenance Division City Garage
Compressed Natural Gas Supply Vehicles
WELCOME WELCOME.
Vehicle & Equipment Maintenance/Cleaning
Presentation transcript:

INDIAN VALLEY COMMUNITY SERVICES DISTRICT

It is my goal to present to the Board, and Community, not only clear justification for this proposed acquisition, but to demonstrate the fact that it would be mush less cost effective to go without. I will compare the cost of our current maintenance practices with the cost of our proposed practices. I will identify some benefits in the way of safety, and Emergency Response for both IVCSD crew and the Community. I have tried to identify all cons, undefined costs, and realize that there will always be unforeseen events.

Leak Repair The average leak consists of a 2’x3’ excavation 3’ deep Required Materials $ yards shade material, $ yards base gravel, $ lbs cold patch asphalt, $10.00 Full sleeve repair clamp, $75.00

LABOR, 16 man-hours ($22/hr loaded rate) $ Cut Asphalt Excavate by hand Pump water from excavation Clean/Inspect area Install repair clamp Load shade/gravel/asphalt by hand Unload shade/gravel/asphalt by hand Compact to 95% by hand Re-Pave Load spoils by hand Unload spoils by hand Clean up Flagging considerations if required

Frequency of Repairs Average two repairs a week Number will continue to rise as existing infrastructure continues to deteriorate Currently spending $904.00/week Excavations usually expose multiple repair clamps from previous leaks

Spoils/Shade/Backfill/Asphalt Material is loaded/unloaded and placed by hand creating significant costs with multiple trips and labor intensive shoveling. Loads are limited by light duty pick-up volume capacities and weight limits.

Snow removal is currently contracted Approximately 6 hours are needed to clear the Civic Center parking lot, Greenville and Crescent Mills water treatment plant access roads, and Greenville waste water ponds access road. Clearing of fire hydrants, Taylorsville lift station, and Taylorsville leach field access road is also required.

Man handling heavy storage vessels creates a safety hazard for employees and a potential hazard to the community in the event of a ruptured Chorine Gas Cylinder or Polymer Drum Maintenance crew is currently unable to handle large castings, lengths of pipe, and heavy valves safely. ANY INJURY TO A IVCSD CREWMEMBER, OR ESPECIALLY A COMMUNITY MEMBER, IS BEYOND MEASURING IN DOLLARS. CHLORINE GAS CAN BE EXTREMLY HAZARDOUS.

15 Emergency call outs in the past three years have totaled nearly $10, in contracted backhoe service charges.

Estimates Are Based On 24,000 Linear Feet Of Water Main And 600 Service Connections (1 Service Every 40 Feet Of Main)

Materials $ yards shade $ yards gravel $ lbs hot patch asphalt delivered $ feet 4” C-900 PVC water main $ ” Romac coupling (2ea) $ ” saddle $ ” corporation stop $25.00 ¾” curb stop (meter valve) $ ’ SDR wall polyethylene 1” CTS tubing $4.00

Labor, 24 man-hours, $ Cut asphalt Excavate main Excavate service laterals Isolate zone (close valves) Remove existing installation Clean and inspect area Install new main Install new service laterals Test/Inspect/Flush/Return to Service Shade main/lateral Backfill, base/slurry Compact to 95% Re-Pave Remove spoils Clean-up Flagging considerations if required

Other Considerations Notifying affected consumers, temporary outages. Transporting large amounts of spoils If job cannot be completed in work day, costs of trench plate, backfilling/re-excavating, and overtime must be compared Replacing 20 feet of water main at a time will quickly reduce the number of failures per week.

Material will be handled entirely by the loader, significantly reducing the number of times the same material is handled and reducing wear on pick-up fleet

Snow removal will be accomplished by in house labor Fork equipped loader will enable safe loading and unloading of heavy or awkward items.

Much improved response time to line breaks, such as the raw water line failure last winter and any future sewer problems. In house labor will be used much more effectively Emergency contractor rates will be avoided

Currently we have a cost of $452.00/leak $904.00/week based on 2 repairs a week About $45,000/year to maintain. Will continue to rise with time. $3,000+/year in subcontracted backhoe services Heavy wear on light duty vehicles Questionable practices in regard to safety

$ /leak, while making positive gains on the distribution system The number of leaks will decline quickly as problem area are replaced Emergencies will be handled in a timelier, more cost effective manner Possible reduction in vehicle fleet Possible reduction in workforce For the same $48,000/year spent on treading water with the old system we could maintain the system, purchase the backhoe, AND replace 500+ feet of water main in the process.

Operator training costs, changes in insurance and fuel costs, equipment maintenance costs are undefined at this time. There will be unforeseen problems on this antiquated system, existing plans are unreliable.

COMPLETE DISTRIBUTION SYSTEM REPLACEMENT

Previous main replacement by Hat Creek Construction totaled 1.1 million dollars to replace 16,000 feet. Walters Engineering estimated 1.5 million dollars to replace the remaining 8000 feet. It is our goal that the distribution system could be replaced in under 10 years using the same dollars we are currently using to continually patch our existing system. After the first year larger gains on the remaining 7500 feet of remaining main replacement could be made per year because of the decline in the number of system failures (leaks).

It is in the districts best interest to be proactive in the maintenance and repair of the community’s degrading utility systems. Possession of the proper tools and equipment will provide for the most efficient, safe, and cost effective maintenance practices. Use of mechanized equipment will minimize damages from catastrophic failures by reducing the repair time. Repair of distribution system will minimize water usage allowing for increased water reserves. As repairs are completed less man power will be required to operate and maintain systems. A properly operated and maintained tractor will serve the community for decades to come.