Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.

Slides:



Advertisements
Similar presentations
Pavement Rehabilitation Method
Advertisements

Sub-Grade Preparation-Equipment Caterpillar Paving Products
Using CFB Ash As A Substitute For Portland Cement In Full Depth Reclamation Presented By Steve Dixon, Civil & Environmental Consultants, Inc. Jim Panaro,
Pavement Types.
Chelan County Stemilt Loop Full Depth Reclamation, Phase II: Stemilt Loop Road is a Rural Minor Collector located in the Wenatchee Heights. The road serves.
Pavement Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Highway Engineering Pavement Types
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Greening the Blacktop Going Green with Sustainable Asphalt RAP, Recycling, Energy and the Carbon Footprint.
Properties of Asphalt Important properties of asphalt include: Adhesion Consistency Specific Gravity Durability Rate of curing Ductility Aging and.
Recycling….the re-use of sealed roads Andrew Silvestri, Account Manager ResourceCo Roads & Works Conference – August 2012.
Michigan Department of Transportation Perpetual Pavement Rep. Rick Olson’s 2012 Best Practices Conference on Road and Bridge Maintenance Curtis Bleech.
Full-Depth Reclamation with Cement Metropolitan Government Pavement Engineers Council.
Chemical Stabilization of Subgrades Section Engineers ’ Meeting Lake Cumberland State Resort Park March 5-7, 2013.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
Intro to our RoadRedi Team Trevor Chisholm- General Manager Patrick Grey- Estimator Steve Flemming- General Superintendant Pat Benoit- Superintendant.
Long-Term Durability of Full-Depth Reclamation using Portland Cement
Full Depth Reclamation Current Practice Testing Variability Presented To: Canadian User Group for Asphalt Sunday, November 15, 2009 Delta Beausejour Hotel.
Pavement Design CE 453 Lecture 28.
The Rehabilitation Solution for Alabama’s Concrete Pavements
Pavement Design Terms and Concepts
Construction Method for Road-Pavement
IPWEA Meeting 3, 8 15 May 2012 Heath Curnow CEO: STABIL-LIME GROUP Vice President: AustStab.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Soil Stabilization By: Monica Acosta.
HMA Pavement Recycling and Reconstruction
Highway Maintenance & Rehabilitation
Flexible Pavement Thickness Design / AASHTO Method
Transportation Engineering II
Recycling and Reclamation of Airfield Pavements 35 th Airports Conference FAA Eastern Region, Hershey, PA April 4, 2012 Campbell & Paris Engineers, 35.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Chapter 9. Highway Design for Rideability
Pavement Maintenance II
October 9, 2008 Spokane, Washington Fundamentals of Design and Construction of Full-Depth Reclamation Pavements The Washington State County Road Administration.
Pavement Distresses Flexible Pavement
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Pavement Preservation Preventive Maintenance
Concrete Pavements The Right Tool for The Right Job.
Influence of Pavement Condition on Project Selection
PAVEMENT MAINTENANCE 1:
Equivalent Granular Thickness 6.04 Apply the concept of Equivalent Granular Thickness to convert a layered system of different materials into an equivalent.
April 19, 2005 PPTG Meeting Education Efforts for the PPTG How to share our knowledge and experience with others.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Pavement Types Dr. TALEB M. Al-ROUSAN.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
DESIGN FLEXIBLE AND RIGID PAVEMENTS Ms Ikmalzatul Abdullah.
DARWIN AC/AC Overlay Design. Course Materials Tables and Design Procedures for this manual.
PAVEMENT TYPE SELECTION Hesham Mahgoub, PhD, PE. South Dakota State University South Dakota Department of Transportation, Office of Road Design.
Soil cement   1 1.
RE-USE and RECYCLING of CONSTRUCTION WASTES in FRANCE By Jean Paul Michaut.
Full Depth Reclamation
Highway Network System
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
A Data-Driven Strategy to Improve the Quality
Design and Control of Concrete Mixtures CHAPTER 2
Supervised by Dr. Sami Hijjawi Prepared by Hamza Saifan
Presenters: Sumon Roy1 and Badrul Ahsan1
VIGNESH POLYTECHNIC COLLEGE
Barry Paye, PE Chief Materials & Pavement Engineer Wisconsin DOT
Chapter(16) AASHTO flexible pavement design method
Pavement Design  A pavement consists of a number of layers of different materials 4 Pavement Design Methods –AASHTO Method –The Asphalt Institute Method.
PAVEMENTS CEE 320 Steve Muench.
Introduction to Pavement Design
Pavement Preservation
Pavement Structural Analysis
Pavement Structural Analysis
NRRA Pavement Workshop 2019
Presentation transcript:

Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A. Hope, EIT, Graduate Research Assistant Department of Civil and Environmental Engineering, Brigham Young University

ASCE Infrastructure Report Card

Water Content Cement Content Cast Rolled No Wearing Course Required Wearing Course Required Roller-Compacted Concrete Conventional Concrete Soil-Cement Flowable Fill Cement-Modified Soil Full-Depth Reclamation Cement- Treated Base Cement-Based Pavement Materials Pervious Concrete

Definition of Full-Depth Reclamation (FDR) “…technique in which the full flexible pavement section and a predetermined portion of the underlying materials are uniformly crushed, pulverized, or blended, resulting in a stabilized base course; further stabilization may be obtained through the use of available additives.” - Asphalt Recycling and Reclaiming Association

FDR is most appropriate under the following conditions: ■ The pavement is seriously damaged and cannot be rehabilitated with simple resurfacing. ■ The existing pavement distress indicates that the problem likely exists in the base or subgrade. ■ The existing pavement distress requires full-depth patching over more than 15 to 20 percent of the surface area. ■ The pavement structure is inadequate for the current or future traffic.

Uses in-place materials Requires little or no material to be hauled off Maintains or improves existing grade Conserves virgin material Saves cost by using in-place “investment” Saves energy by reducing mining and hauls Is a very sustainable process Advantages of the FDR Process

Benefits of FDR Using Cement Increased rigidity for distributing loads Elimination of rutting below surface Reduced moisture and frost susceptibility Reduced fatigue cracking Thinner pavement sections

Rehabilitation Strategies Attribute Rehabilitation Strategy Reclamation with Cement Structural Overlay Removal and Replacement New pavement structure  Fast construction  X Minimal traffic disruption  XX Minimal material in/out  XX Conservation of resources  XX Maintenance of existing elevation  X  Low cost  XX

Pulverize, Shape, Add Cement, Mix In Place, Compact, and Surface Granular Base Subgrade Existing road Bituminous Surfacing Subgrade Pulverized Pulverization to desired depth Subgrade Pulverized Removal of excess material (if necessary) and shaping Subgrade Stabilized Addition of cement, mixing, reshaping, and compacting Subgrade Stabilized New Surfacing Application of final surface course FDR Construction Process

Pulverization

Reshaping

Cement Spreading

Cement Uniformity

Material Blending

Compaction

Grading

Curing

Minimal Disruption

Microcracking

Microcracking

Surfacing

Service Life = 20 years Design Equivalent Single Axle Loads = 15,000 Overall Standard Deviation = 0.45 Initial Serviceability = 4.5 Terminal Serviceability = 2.0 Asphalt Structural Layer Coefficient = 0.40 Cement-Treated Base Structural Layer Coefficient = 0.18 Drainage Coefficient = 1.0 Subgrade Resilient Modulus = 15 ksi New Surfacing Subgrade 8 in. CTB 3 in. HMA Final Pavement Structure Pavement Analysis Cost = 20% Less than Traditional Reconstruction Reliability = 99.99%

Summary FDR with cement stabilization provides a durable structural layer with many engineering, environmental, and economic benefits Cement can be applied on urban projects with a slurry spreader attachment to ensure uniformity and eliminate all fugitive dust

Thank You!