Cost Estimation System Tool

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

July Training Outline Part 1 Cost-per –SF and Detailed Estimate Pay Item Detailed Estimate Segments Bridge Level Data Segment Level Data Supports.
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
MAJORS COST ESTIMATING TOOL WORKSHOP January 19, 2012 Cost Estimating Tool Overview.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
WESTERN LOUDOUN SCHOOLS: ALTERNATE SITES May 26, 2009 Schoene/Engle McDonough Assemblage.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
Section 106 Clearance Application Missouri Local Programs How to Complete the Application for Section 106 Clearance.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Historic Digimap Historical maps and data from the Ordnance Survey maps from the 1840s to the 1990s.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 2 5/24/20151 This portion.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
2005 Logistics Summit Using GIS Technologies for Oversize/Overweight Permitting Joel Bump, Senior GIS Software Developer.
Overview of FDOT’s Long Range Estimating System 2005 TEA Conference November 4, 2005 Daytona Beach, Florida.
Safety Audit Components Safety assessment for risk Management.
LADOTD CONSTRUCTION COST ESTIMATING Charles Nickel, P.E. Cost Estimate & Value Engineering Director Office: (225)
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Indianapolis/Marion County GIS & DigSmart Ryan R. Johnson March 8, 2006.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Enhancements in Estimation and Bid Analysis Randy Lawton Info Tech, Inc.
1 Leah Walker California Department of Health Services Division of Drinking Water and Environmental Management October 2001 DHS TurboSWAP Welcome to TurboSWAP,
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
In association with: 73 rd Street to Indian Bend Wash Bridge THOMAS ROAD STREETSCAPE 73 RD STREET TO INDIAN BEND WASH BRIDGE PROJECT NO. T0606 City of.
Community Development Department Construction Phase.
Jason Chapman Data Collection & Management Systems.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Community Development Department Construction Phase BULLDOG DRIVE.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
FDOT TRANSIT PLANNING 2015 ACTIVITIES AND ACCOMPLISHMENTS Diane Quigley, Transit Planning Administrator FHWA/FTA Statewide Assessment Meeting July 20,
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
General Tab Project, Cost Schedule, and Work Limits Roadway Character
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
2nd Street Drainage and Paving Improvements
Segment Crash Analysis
Interdisciplinary teams Existing or new roadway
Sample Eastern Sustainable Development Project
Public Information Meeting NW 100th Street Reconstruction Project
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Safety Audit Components
1200 West Widening and Reconstruction Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Walker Street Reconstruction Project 25% Design Public Hearing
WHERE TO FIND IT – Accessing the Inventory
Presentation transcript:

Cost Estimation System Tool MPO Conference GDOT Office of Planning Dave Cox July 10, 2009

Planning Level Cost Estimates Issues The current funding environment has created a critical need to ensure accurate and current planning level cost estimates Federal / State / Local funding requires accurate estimates to assist with spending prioritization and balancing

Planning Level Cost Estimates Answers Develop Software to better standardize planning level cost estimation. Cost Estimation System (CES) AASHTO software product Estimates Construction & PE phases Right of Way and Utility Relocation Cost Estimate Tool (RUCEST) Created by GDOT

Improving Planning level Estimates Items previously not included in planning level estimating Software cost groups calculate items (asphalt, concrete, earthwork, etc.) known to be in the majority of projects constructed by GDOT. Software calculates item cost based project location (geographic region of State). Added contingency captures unknown variables (i.e. concrete walls, culverts, landscaping, lighting, etc.) - User friendly interface allows user to add secondary project items (traffic signals, turn lanes, etc.)

What does CES do for you? Generates planning level estimates for Construction costs using pre-made project “templates” Template uses predetermined Cost Groups info to calculate planning level cost estimate based on the project length and the typical section Uses GDOT historical data (3 year window) and updated each quarter Provides contingency percentages for unknowns Documents all planning level assumptions in an attached text file

The way CES works Research project description (logical termini, typical section needed) Use aerial imagery (Google Maps) to confirm Project Length Existing section Urban/rural Proposed improvements Primary work type (i.e. widening, new road) Secondary work types (i.e. bridges, turn lanes, signals, etc.)

The way CES works (cont.) Select appropriate template in CES Primary Project template (required) Secondary template (add as needed) Enter project length and width Enter optional items as appropriate. Traffic Signals, Turn Lanes, Major Intersections. Document all assumptions for planners and designers to review your cost assumptions.

Project Type CES Templates Auxiliary lanes Bridges Frontage roads HOV lanes Median work Multi-use Trail Park and Ride Lots Passing lanes Ramps Roadway (new alignment) Roundabouts Sidewalks Turn lanes Widening Projects

CES Templates Select the appropriate template – save as new project file

CES Main Estimating Screen Enter Project Description Location: County Urban/Rural GDOT District Length & Width

CES Optional Items Enter quantity # of various items along project corridor Left Turn Lanes Right Turn Lanes Major Intersections Traffic Signals

RUCEST- ROW & Utility Estimating Tool AASHTO’s CES only calculates CST & PE via % RUCEST created to generate and document planning level cost estimate for Right of Way (ROW) and Utility Relocation Uses database of cost items organized by counties (ROW) and DOT District (Utility) Creates cost sheet that can be exported to PDF or print for archival purposes Catalogs different cost scenarios as snapshots

How RUCEST works Use aerial imagery (GIS or Google Maps) to estimate project length, ROW land type, takes, and utility For smaller parcels (i.e. gas stations) found within the corridor, estimate length and subtract from primary land use type. Fill in the worksheet to compile and document the information before adding a new Snapshot in RUCEST Add attachment files (PDF maps of corridor) as appropriate Finalize “snapshots” to save record in RUCEST Revisit estimates on regular basis as appropriate

Items to enter into RUCEST Terrain (flat, rolling, mountainous) Typical Section (Urban or Rural) Tool provides default ROW width County & Land Type Enter length of each land type Tool provides default land value $ cost per acre Enter known displacements (takings) Add known and assumed Utilities Add attachments (PDFs, Study, N&P, maps, etc.)

Cost Estimation resources: Google Church Bridge Utility Corridor Use Distance Measurement Tool to measure Length and Width

Google Street View

Potential items to look for Power Poles signage Traffic Signal Storm Drain (sewer) Fire Hydrant (water line)

Sample Documentation Text File Attachment Input: Date / Estimator Input project name & description Input: Date / Estimator Project length Project width # of lanes

Sample Documentation Text File Attachment Based on typical section selected

Text File Attachment Create separate project for bridges using bridge widening templates (secondary project) Cost from CES template based on length and total width of new bridge less existing width

Summary Use these Planning level cost estimating tools to develop initial project cost during LRTP development, for projects which have not had preliminary engineering (PE) initiated Save all documentation in software tools so estimates can be reviewed in the future Review the available training materials and documentation Provide future suggestions

GDOT - Office of Planning Questions? Contact info: Dave Cox GDOT - Office of Planning 404-631-1807 dcox@dot.ga.gov