ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.

Slides:



Advertisements
Similar presentations
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Advertisements

State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Wisconsin Transportation Finance and Policy Commission Freight Rail Day 2012 October 26, 2012.
BRIEF HISTORY OF BENTON HARBOR PROPERTY TAXES 1954 – Present10 mills authorized by City Charter, reduced annually for Headlee Rollback 2001 –
County Transportation Systems Association of MN Counties, MN County Engineers Association, MN Inter-County Association Presentation to MN Senate Transportation.
Counties and Transportation 101 Abbey Bryduck Association of MN Counties Transportation & Infrastructure Policy Analyst March 2015.
Michigan’s Road Commissions January 25, 2006 Legacy And Mission Michigan Townships Association.
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
Genesee Road and more Genesee County Road Commission January 29, 2009.
NDACo Conference County Needs for Long Term Highway and Bridge Funding Jason Benson Cass County Engineer.
MECOSTA COUNTY ROAD COMMISSION February 2, MECOSTA COUNTY ROAD COMMISSION ROAD COMMISSION BOARD  Consists of 3 elected officials  Elected term.
Town of Southbury Department of Public Works 2014.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
2013 Budgets Lower Paxton Township
Street Maintenance Funding Issues City Council Workshop April 1, 2013.
To Pave or Not to Pave? Making Informed Decisions on When to Upgrade a Gravel Road.
Basics of County Offices Highway Department County Officials Academy.
Highway 46 in BeresfordHighway 19 North of Humboldt Highway 73 South of Lemmon Interstate 90 East of Wyoming Line.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues Uncertain federal revenue + Increasing construction.
Future of Ringgold County Sealcoat Road System Open Forum Meetings 2011 Credit for assistance in this presentation to Brad Skinner, Page County Engineer,
2010 C ITY OF E LMIRA B UDGET P ROPOSAL November 2009 John J. Burin, City Manager David Vandermark, City Chamberlain C ITY OF E LMIRA 2010 BUDGET PROPOSAL.
mydocs-presentations-2011PAPAMWF-EricaRevisions
Iowa State Association of Counties 2013 Fall School of Instruction November 14, 2013 Stu Anderson Iowa Department of Transportation.
Local Highway Technical Assistance Council Joint Senate and House Transportation Committees January
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
The Cost of Status Quo Governor’s Task Force on Modernizing Transportation Funding in Idaho December 2, 2009 Presented by Idaho’s Metropolitan Planning.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Roads & Jobs For Riley County. The county’s roads and bridges are deteriorating and there are extremely limited funds available for replacement The county’s.
2012 City Budget ~ Manhattan ~ Kansas Work Session Four.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 3, 2013.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
NDACo Legislative Wrap-up Funding for Non-Oil Producing County Highways and Bridges Jason Benson Cass County Engineer.
Metro Cities Transportation Policy Committee August 10, 2015 Overview of Minnesota Highway and Transit Finance.
MML Capital Conference MML Capital Conference Director Kirk T. Steudle, P.E. Michigan Department of Transportation March 4, 2009.
Construction Conference Construction Conference NDDOT’s: NDDOT’s: Future Federal Funding Future Federal Funding State Legislative & Budget issues.
Enacted in 1990, CAPP is funded with 0.45 cent of the fuel tax which generates approximately $28 million per biennium. The CAPP is a direct allocation.
Public Hearing August 11, :00 pm. On May 3, 2011, the West Bountiful City Council adopted a balanced tentative budget maintaining current service.
Department of Transportation Report on Condition of County Maintained Road System Agenda Item 53 Board of Supervisor’s Meeting April 26, 2005.
Grant Levi, NDDOT Director 1. SB Early funding passed in February  Western North Dakota  State Highways $450 million  Counties $240 million 
Douglas County Road Maintenance Funding June 27, 2011.
Local Funding Options What is, or could be, within the power of the County. WISCONSIN COUNTY ASSOCIATION 77 TH ANNUAL CONFERENCE LA CROSSE
Road & Street Maintenance Ballot Measure September 9, 2015 Corey Farkas, Streets Division Manager Travis Easton, Director of Public Works.
Colbert County Budget Solutions John Bedford, P.E. County Engineer 2012 ACEA Convention.
MEC’S BLUEPRINT MISSISSIPPI LONG-TERM TRANSPORTATION/ INFRASTRUCTURE PLAN.
Presents. Tough Times For Transportation Funding Declining gas tax revenues Declining state revenues for aviation, highways and transit Uncertain.
Proposed Final Budget Presentation (May 11, 2015) Selinsgrove Area School District.
PROPOSAL 1: WHAT DOES IT MEAN FOR YOU? ___________ County Road Commission March 2015.
Presentation to the Washington Transportation Commission March 16, 2010 Washington State Association of County Engineers.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
1 WAKULLA COUNTY TOWN HALL MEETING One Cent Sales Tax Extension May 3, 2016 at 6:00p.m. St. Marks City Hall.
We maintain streets with half the materials budget that we in had Due to inflation, today's dollar buys only half the materials it did in Therefore,
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Information for Public Hearing July 22, TAX DIGEST AND MILLAGE RATE 2015 What is a Digest?  The total Net Assessed Value of Real, Personal Property,
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
Village of Woodridge 2011 Pavement Analysis
CITY OF NEW SMYRNA BEACH
Genesee County Road Commission Use of Transportation Funding
Fennville Public Schools
Street Improvement Plan
State Highway Jurisdictional Transfer (Turnback) Program
County State Aid Needs.
Roads & Bridges.
Monterey County Project Report for Measure X Expenditures
State Highway Jurisdictional Transfer (Turnback) Program
Presentation transcript:

ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014

PRESENTATION TOPICS ALLEGAN COUNTY ROAD COMMISSION INFORMATION MILLAGE HISTORY & GUIDELINES FEDERAL AID PROJECTS 2013 PROJECTS & FINANCIAL INFORMATION 2014 PROPOSED PROJECTS DISCUSSION

ALLEGAN COUNTY ROADS & BRIDGES The Allegan County Road Commission is responsible for 1,797 miles of roadway and 148 bridges –512 Primary Miles 478 miles paved (3 new miles in 2014) 34 miles gravel –1285 Local Miles 634 miles paved (4.25 new miles in 2013) 651 miles gravel (67 miles seasonal, not snow plowed) –148 Bridges 49 Primary System 99 Local System To be classified as a bridge the structure must have a minimum span of 20’ and can be a combination of culverts.

ROAD COMMISSION / LOCAL REVENUES The Road Commission receives revenue through the Michigan Transportation Fund (MTF) from fuel tax and vehicle registrations. This revenue is used to pay for operating and maintenance costs of the roads in Allegan County including payroll, utility costs, equipment and materials, etc.. MTF rates average $2, per mile of local road and $9, per mile of primary road. In 2012 the Road Commission’s MTF revenue was $8,233,772. Federal and State funding acquired for roads and bridges totaled $2,639,616. The Primary Millage raised $3,104,628 and township contributions added an additional $6,164,277 for primary roads (paved shoulders) and for preventative maintenance and improvements to the local road system. In 2012, locally raised revenues in Allegan County totaled $9,268,905 and were higher than any other road commission in the state.

2012 revenues were 0.23% over the 10 year average

HOT MIX ASPHALT COST CHANGES

ALLEGAN COUNTY MILLAGE HISTORY A one mill tax was first collected for bridge and culvert replacement on primary roads in From there were 111 bridges and culverts replaced with the millage. In 1982 the millage language changed from bridge and culvert replacement to primary road resurfacing. In 2008 the language was revised again to include “preservation and preparation” along with resurfacing is the 2 nd year in the current six year millage. The millage renewal was approved in 2012 with a change from a five year period to a six year period to allow for renewal dates to coincide with regular elections.

FINANCIAL GUIDELINES The millage revenue is split equally between six areas, each area containing four townships. About 30% of the tax collected is distributed to the cities and villages in Allegan County. The expenses and revenues for each area are carried through from year to year. This allows for larger projects resulting in lower costs through efficiency of scale. If the township agrees to pave existing gravel shoulders on the project, they are responsible for the cost of 2” of the asphalt times the width of the shoulder at the contracted unit price. The Road Commission develops a proposed plan for projects and meets with each area annually to discuss the proposal and review the previous year’s projects.

SIX MILLAGE AREAS

BRIDGES & CULVERTS REPLACED WITH MILLAGE

RESURFACING MILLAGE PROJECT TOTALS From the millage has raised $54,241,725 which has funded: miles of paving (12.75 in 2013). *Some roads have been resurfaced multiple times miles of chip seal & fog coat (6.45 in 2013) miles of crack sealing (2013) - 11 large culvert replacements (0 in 2013) In 2013, four projects used millage funds to provide the local match for State and Federal funding.

ALL SEASON ROUTES

FEDERAL & STATE AID PROJECTS

PASER RATING GUIDLINES

LATEST SURFACE RATINGS

2013 PROJECTS

2014 PROPOSED PROJECTS

AREA PROPOSED PROJECTS

AREA FUND BALANCES