City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University.

Slides:



Advertisements
Similar presentations
Rigid Pavement Concrete. Transverse Cracking Rigid Pavement Transverse Cracking Causes:  Slab longer than 15’ Slab Curl Curing.
Advertisements

From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Street Conditions Part 1 – State of the Streets Part 2 – Repairs and Maintenance Costs Part 3 – Options for Funding.
Pavement Management Engineer
City of Bloomfield Hills Asset Management Plan. Outline Overview plan Challenges and community input Recommendations for others.
1 Preserving Municipality Roadways Federal = 3% State = 20% Local = 77% 94% of paved roads have an Asphalt surface FHWA Source: Stephen R. Mueller,
Selecting the Right Maintenance Treatment Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
The Dyer Partnership Engineers and Planners City of North Bend Pavement Management Plan & Street Utility Fee Analysis February 11, 2014.
1 Resurfacing and Curb Ramps. 2 FHWA’s Americans with Disabilities Act Program / Section 504 of the Rehabilitation Act of 1973 The primary purpose of.
Sect. 12A-2 – Accessible SW Requirements ADA Clarifications: – When are curb ramps required? – What constitutes an alteration? – Does the scope of resurfacing.
Howdy Folks Welcome To Golden Howdy Folks Welcome To Golden.
Pavement Management Program Overview February 10, 2015 Presented By: Christopher J. Ott, E.I.
The Rehabilitation Solution for Alabama’s Concrete Pavements
Why Pavement Maintenance and Preservation? Sponsored by: Minnesota T 2 Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
City of Somersworth Presentation to City Council on Pavement Management Presented by: Joe Ducharme, Jr., P.E. Contract City Engineer & Britt E. Audett,
City of Lake Elmo · New Village Workshop-Focus on Infrastructure· January 20, 2007 PAVEMENT MANAGEMENT REPORT PREPARED: NOVEMBER 16,
Pavement Management Keeping Good Roads Good, Making Poor Roads Better.
County of Orange Pavement Management System and Sustainable Treatment Program Clark Shen, Manager OC Construction Materials Lab Krishna Nadaraja, Senior.
Larry Galehouse, PE, PS, Director.  Established on July 11, 2003  Created to promote pavement preservation nationally and provide technical support.
Herriman City Engineering Department.  Herriman City has experienced tremendous growth over the last several years  Many new subdivisions and associated.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Surface Rehabilitation Treatments
HMA Construction Program
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
City of Manistee An Asset Management Journey. Manistee Factoids Incorporated in 1869 Population 6,586 $5,000,000 General Fund Budget 4.3 Sq. Miles – 3.2.
Pavement Maintenance II
Pavement Distresses Flexible Pavement
December 4, National Capital Heavy Construction Association Committee of the Whole 2009 Draft Operating and Capital Budgets Tax Supported Programs.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
N ORTHWEST GIS U SERS G ROUP C ONFERENCE – O CTOBER 20, 2011 Dynamic GIS-based Pavement Condition Tracking.
Pavement Preservation Preventive Maintenance
Chapter 3 Framework for Treatment Selection From… Maintenance Technical Advisory Guide (MTAG)
LTPP Lessons Learned: Kansas SPS-2 July 17, 2013 Abilene, KS Gabe Cimini Database Manager, LTPP NRSC.
Incorporating Pavement Management into the LRTP John Kiefer, P.E. Research Engineer Center For Technology and Training Michigan’s Local Technical Assistance.
Early Performance of Concrete Pavement Overlays in Minnesota Tom Burnham, P.E. Minnesota Department of Transportation 15 th Annual TERRA Pavement Conference.
MICHIGAN EXPERIENCE WITH WARRANTY WORK. Warranty Program History Why Warranties ? Warranty Specifications Experience & Lessons Learned.
ODOT. Taking Care of What We Have. Asset Management, Life Cycle Analysis : A Three-Pronged Approach September 9th, 2015 Andrew Williams, Ohio DOT.
PAVEMENT MAINTENANCE 1: Part 1: Pavement Preservation Idaho Roads Scholar Program.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
Gary Hicks and Rob Marsh Gary Hicks and Rob Marsh April 19, 2005 April 19, 2005 Pavement Preservation Sub-Group on Strategy Selection & Evaluation.
By Larry Galehouse, Director, National Center for Pavement Preservation and Jim Sorenson, Team Leader, FHWA Office of Asset Management by Larry Galehouse,
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
“resurfacing hotline” (512)
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
2016 Mill and Overlay Project
Transportation Development District Presentation
Pavement Preservation Techniques Used in Virginia
Village of Woodridge 2011 Pavement Analysis
Pothole Patching Alternatives
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Boulder Junction Town Road Improvement Project
Town of Clayton 2016 Pavement Condition Survey
Street Improvement Plan
Surface Preparation before laying Hot Mix
Determine Reinvestment
Pavement condition index calculation
Implementation of pavement preservation treatments
2018 Pavement Workshop May 23-24, 2018
Pavement Preservation
Pavement Preservation Philosophy utilizing Pavement Management Systems
Prime Factors for Successful Preservation Treatments
NRRA Pavement Workshop 2019
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

City of Auburn Hills Road Asset Management Program February 21, 2014 SEMCOG University

BACKGROUND Auburn Hills Road Network –Approx. 180 lane miles of roadway –128 lane miles of asphalt or sealcoat –50 lane mile of concrete –2 lane miles of gravel Began road maintenance program in 1996 Annually prepare a rolling 5-year road maintenance plan Combination of asphalt & concrete rehabilitation Heavy rehab/recon when necessary – leverage funding Annual investment of $750k to $3.5M Complete some maintenance “in-house” PASER road ratings done every 3 years Continually evaluate & update plan to adjust as needed

DETERIORATION CURVE

$2.65/syd/year over life of pavement – 36 years Average condition rating = 7

$3.30/syd/year over life of pavement – 36 years Average condition rating = 6

Road Asset Management Plan Review and/or Collect PASER data (3 year cycle) Update RoadSoft Database Review performance of recent maintenance work Coordinate with other AMP’s (water, sewer, etc.) Confirm road selection priorities & adjust as needed Select maintenance techniques for target roads Determine costs for selected maintenance fixes Refine plan based on budget considerations Prepare yearly plan worksheets, maps, etc. Finalize report and recommendations

Road Asset Management Plan

CHIP SEAL

CHIP SEAL CONSIDERATIONS Seals pavement surface Improves surface friction Loose aggregate chips & dust after application “Rough” surface may not be desirable in certain locations Aesthetics – color is same as aggregate chips 2 nd course can be applied for added structure – “double chip” Approx. cost - $2.50/syd

SLURRY SEAL

SLURRY SEAL CONSIDERATIONS Seals pavement surface Fills small cracks Improves surface friction “Rough” surface may not be desirable in certain locations Aesthetics – mottled appearance after weathering Traffic control and set time Heavy traffic (especially turning) can scuff surface Approx. cost - $3.00/syd

CAPESEAL

CAPESEAL CONSIDERATIONS Combination of chip & slurry Provides additional structure, not as much as HMA overlay Final surface is “rougher” than traditional HMA, may not be desirable in certain locations Aesthetics – mottled appearance after weathering Traffic control and set time Can apply “double chip” to increase structure & fill areas Performs well to seal cracks and provide “new” road surface Approx. cost - $5.50/syd

MICROSURFACING

MICROSURFACING CONSIDERATIONS Seals pavement surface Improves surface friction Fills small cracks No aesthetic issues – looks like HMA Not good for hand work – best on mainline Quick set time reduces traffic control Need to do a large quantity to be cost effective Approx. cost - $4.00-$7.00/syd

THIN HMA OVERLAY

THIN OVERLAY CONSIDERATIONS ¾” to 1 ½” HMA overlay Provides additional structure Existing pavement can be milled or left as is Provides smooth new pavement surface Reflective cracking is an issue Surface preparation (crack seal/repairs) critical Approx. cost - $6.00-$7.00/syd

CONCRETE PATCHING/JOINT REPAIR

CONC PATCHING CONSIDERATIONS Address deteriorated joints Address cracked, broken, vaulted slabs Improves ride quality Underlying base issues can & need to be addressed 30” joint repairs – transverse & longitudinal Can do full depth or partial depth repairs Smaller repair areas cost more/syd than larger areas Significant traffic control for removal, placement, & cure Approx. cost - $60.00/syd of repair area

CRACK/SEAT & OVERLAY

CRACK/SEAT/OVERLAY CONSIDERATIONS Existing concrete is fractured in preparation for HMA overlay Provides new pavement surface Can do base repairs to address underlying issues Joint/crack prep needed before overlay Should be used when concrete is deteriorated beyond where patching is cost-effective Reflective cracking can be an issue Can do “edge milling” – otherwise raises pavement grade Can maintain traffic throughout construction Approx. cost - $35.00/syd for 3” overlay

CONCRETE OVERLAY

CONCRETE OVERLAY CONSIDERATIONS New 4” to 6” concrete surface placed over existing pavement Provides new pavement surface Can do base repairs to address underlying issues Joint/crack prep done before overlay HMA or geosynthetic “bond breaker” Roadway grade is raised, impacts to driveways, side streets, sidewalks, drainage structures, etc. Significant traffic control needed Approx. cost - $50.00/syd for 4.5” overlay

“In-House” Maintenance Utilize DPW crews for maintenance activities –Overband Crack Seal –HMA Patching Saves costs on design, bidding, contract administration Complete prep work the year ahead of contractor planned work Saves costs on subcontracting Improved responsiveness to address complaints Training

Contracted Road Programs Annual Asphalt Maintenance Project Annual Concrete Maintenance Project Road Reconstruction Projects Funded projects let through MDOT Maintenance projects are done “Log” style

Asset Management Education Public Education Information Meetings Educate/Inform Elected Officials Public Notices Prior to Construction Updates During Construction Feedback on Performance After Completion

Asset Management Education

Lessons Learned Match the right maintenance treatment to the right roadway. There is no “Silver Bullet” Determine if there are underlying base issues before using surface treatments. Don’t put lipstick on a pig. Don’t be afraid to try new things. It’s good to have a lot of tools in the toolbox. “In-house” maintenance can be combined with contract work to reduce costs. Education with elected officials & the public is essential to a successful asset management program.

Lessons Learned Know where the elected officials live. That way you can understand the complaints & help with PR. Consider the uses of the roadway and aesthetic desires of the area when selecting maintenance treatments. Leverage funding opportunities whenever possible, but continue to invest in the road network. Coordinate roadway asset management plan with other utilities as much as possible. Continually monitor the roadways, including those that were just maintained to track performance.