February 2013 Quarterly Luncheon. Platte County Public Works Bridge replacements Improvements to current roadways New roadways to serve growing demand.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
ALLEGAN COUNTY PRIMARY ROAD MILLAGE AREA 2 JANUARY 21, 2014.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
Annexation Presentation 06/10/20141 Planning for our Future.
Highway 46 in BeresfordHighway 19 North of Humboldt Highway 73 South of Lemmon Interstate 90 East of Wyoming Line.
Senate Committee on Transportation, Technology and Legislative Affairs House Committee on Public Transportation Thursday, July 18, 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
City Transportation Funding Overview House Transportation Committee January 13, 2004 Ashley Probart AWC Transportation Coordinator.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Todd Long, GDOT. Transportation in Georgia 10 th Largest Road System in Nation – 17,967 Centerline Miles of State Routes/Interstates – 85,738 Centerline.
Longmeadow Parkway Fox River Bridge Corridor
Roads & Jobs For Riley County. The county’s roads and bridges are deteriorating and there are extremely limited funds available for replacement The county’s.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
TRANSPORTATION ALTERNATIVES PROGRAM FY 2016 Project Priorities.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
California’s Infrastructure Crisis. Statewide Transportation System Needs Assessment “California’s transportation system is in jeopardy. Underfunding.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
KEEP PALM COAST March 27, 2012 City Council Workshop.
Michigan’s Roads Crisis: Study Findings, Conclusions and Where Do We Go From Here? Best Practices Conference Rick Olson, State Representative, 55 th District.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Tab 9 Case Studies. Minor Accident Single Vehicle Accident.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
PROPOSED BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 23, 2011.
Action 2020 Training Local Context August 15, 2012.
Julie Skallman State Aid Division Director & State Aid Engineer.
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
Transportation Finance Advisory Committee May 18, 2012.
DRAFT BUDGET PRESENTATION CITY COUNCIL WORKSHOP AUGUST 10, 2010.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
1 Planning Andrea Stevenson. 2 What’s the Big Deal About Ohio’s Transportation System? Ohio is within a single day’s drive (600 miles) of 60% of the United.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Sand Mining Road Impacts Committee of the Board February 7, 2012 This presentation is available at the Winona County website under.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
1% Sales Tax Commission Board Meeting June 3, 2015.
2009 CUMULATIVE BRIDGE PROGRAM Monroe County Highway Department April 14, 2009.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
NORTH & SOUTH FULTON TRANSPORTATION VOTE November 8, 2016.
PUBLIC WORKS DEPARTMENT
Platte County Economic Development Council
Infrastructure Investment Needs
SE 12th Street Roadway Improvements February 8, 2005.
Background Incorporated as a city September 12, 1960, the City of Manvel was first settled in 1857 twenty miles southwest of Houston. During the 1960’s.
Town Council Strategic Planning Session
Monterey County Project Report for Measure X Expenditures
Presentation transcript:

February 2013 Quarterly Luncheon

Platte County Public Works Bridge replacements Improvements to current roadways New roadways to serve growing demand City funding assistance 2002 Transportation Improvement Plan February 2013

Platte County Public Works February 2013 Project Funding 3/8 cent retail sales tax $51,500,

Roads Brink Myer & K Hwy Jones-Meyer Fox 136 th Street Humphrey’s Baker Farley-Hampton Hillsboro Sharp Station Elm Grove East Ridgely Martin North Farley Woodruff Dye Store Bridges Bee Creek Brandt Cogan Duncan Hillsboro Holland Branch Interurban – Dearborn Jowler Creek Lamar Lanter Lane Macadow Middle Dye Store Moore North Dye Store Pleasant Grove Bridges River Road Ross Road Schaback South Dye Store South Ridgely Stanton Sharp Station Thomas Street West Pleasant Grove Williams Woolston Humphrey’s Total Cost of County Projects $15,374,870

August 2, 2010 Platte County Public Works Farley-Hampton East Ridgley Road Over 1 mile of added improvements 4.8 miles improved, in budget Partnered to complete entire roadway

Interurban Rd Bridge

Sharp Station Road Bridge Awards and Recognition Platte County Public Works Practical Design Award of Excellence February 2013

Partnerships Platte County Public Works February 2013

Completed Road District Projects Platte County Public Works February 2013

Completed City Projects  Village of Ferrelview  Overlay & street improvements  City of Parkville  Asphalt Overlay to 5 subdivisions  City of Riverside  West Platte Road Bridge  Weatherby Lake  Culvert upgrade, storm water work, ditch & shoulder repairs and street repairs along 7 different streets  City of Weston  Thomas Street Bridge and street improvements Platte County Public Works February 2013

Completed City Projects  Village of Farley  Overlay improvements  Village of Ridgely  ½ mile asphalt pavement improvement  City of Camden Point  Street preservation  Village of Iatan  Main Street paving  Platte City  Dearborn  Edgerton  Ferrelview  Houston Lake  Northmoor  Platte Woods  Tracy Platte County Public Works February 2013

Kansas City Projects  Green Hills Road  Congress Avenue  Congress & Tiffany  Barry Road Platte County Public Works January 2013

Cost of Kansas City Projects Platte County Public Works  Green Hills Road  $791,007  Congress Avenue  $3,400,301  Congress & Tiffany  $4,915,624  Barry Road & I-29  $2,679,328  Barry Road West  $4,109,508  Program Administration  $927,644 TOTAL: $16,895,768 Supplemented with other funds: PIAC, TIF, FHWA, Impact Fees, PHSD * January 2013

Retail Sales Tax Funding Sunset

Platte County Public Works Vehicle Weights & Capacities continue to increase Additional Traffic Additional growth & development Missouri and Platte River Flooding February 2013 Transportation Planning Air Quality Congestion Management Financial Planning and Programming Freight Movement Land Use Public Involvement Safety Security System Operations and Management (O&M) Technology Applications: Models, GIS, and Visualization Transportation Asset Management

Planned County Projects  15 Bridge Replacements  4 Major Road Projects  City & Road District O&M assistance Platte County Public Works February 2013  Major Capital Projects  45 Highway K-435 completion  Other State Projects  Flooding  Safety  Leveraged Funds

February 2013 Retail Sales Tax Renewal Unincorporated Funding$30,000,000 Incorporated City Funding$30,000,000 $60,000,000

DISTRIBUTION ESTIMATES Unincorporated County Platte County Public Works January 2013 City / Village 2010 Population Fraction of Population Gross Distribution Camden Point ,106 Dearborn ,322 Edgerton ,540 Farley ,913 Ferrelview ,426 Houston Lake ,124 Iatan ,896 Kansas City ,281,345 Lake Waukomis ,992 Northmoor ,917 Parkville ,579,050 Platte City ,178,308 Platte Woods ,778 Ridgely ,293 Riverside ,363,823 Tracy ,587 Weatherby Lake ,091 Weston ,013 TOTAL ESTIMATE: $30 MILLION Bridges, Stormwater Structures and O&M: 15 bridge replacements and stormwater structures Road Districts operation & maintenance assistance TOTAL PROJECTS = $15,000,000 Major Road Construction: Various Capital Projects i.e., (State Hwys - 45, B, E, etc) 24 miles of major construction throughout Platte County Potential Projects Interurban Road N. Farley Road River Road/Waldron Dye Store Road TOTAL PROJECTS = $15,000,000 TOTAL ESTIMATE: $30 MILLION Bridges, Stormwater Structures and O&M: 15 bridge replacements and stormwater structures Road Districts operation & maintenance assistance TOTAL PROJECTS = $15,000,000 Major Road Construction: Various Capital Projects i.e., (State Hwys - 45, B, E, etc) 24 miles of major construction throughout Platte County Potential Projects Interurban Road N. Farley Road River Road/Waldron Dye Store Road TOTAL PROJECTS = $15,000,000 TOTAL ESTIMATE: $30 MILLION

THANK YOU February 2013 Platte County Public Works