Multi Factor Wage Incentive Program

Slides:



Advertisements
Similar presentations
Reporting and Interpreting Cost of Goods Sold and Inventory Chapter 7 McGraw-Hill/Irwin © 2009 The McGraw-Hill Companies, Inc.
Advertisements

Higher Business Management
Strategic Decisions (Part II)
John Wiley & Sons, Inc. Prepared by Karleen Nordquist.. The College of St. Benedict... and St. John’s University.... Managerial Accounting Weygandt, Kieso,
SECTION 2 WORK The reward for work GCSE ECONOMICS: UNIT 11 Part One.
The United States Federal Reserve By Dr. Paul Lockard Professor Black Hawk College.
Hilton Maher Selto. 2 Product Costing Systems Concepts and Design Issues McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Managing Finance and Budgets Lecture 5 Profit & Loss Accounts.
Question #1 Tex starts work at 1:40 PM and gets off work at 7:25 PM. If he has no breaks, how many hours does he work for? 5 hours (1:40 to 6:40) 45 minutes.
Material Handling. Materials Handling Materials handling is a non-value activity that your customer is unwilling to pay for. Constantly question material.
1 Lecture 6 The Systems Analyst (Role and activities) Systems Analysis & Design Academic Year 2008/9.
2.3 Real and nominal wages Actions of employers (buyers) and employees (sellers) determine wages (prices) These prices act as signals or incentives Part.
PRODUCTIVITY Dr. Ahmed Elyamany.
WELCOME TO Our Presentation. Topic Labor Cost The Workforce Behind This Presentation NameID Sunayan Kanti PaulBBA MD. Mehedi AliBBA
Copyright © 2002 by Harcourt, Inc. All rights reserved. Topic 17 : HR management: Financial Rewards Lecturer: Zhu Wenzhong.
Motivation in Practice Monetary Methods PEOPLE MOTIVATION AND LEADERSHIP.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Financial and non-Financial Rewards
Lecture 14 Testing a Hypothesis about Two Independent Means.
LABOUR COST Dr Kamlesh Khosla, M. Com., M.A. Economics, Ph.D.
SHOW ME The MONEY Just how much do you know about how people get paid?
Lecture 10 Human Resources Looking after the human side of the business. It is the set of activities that must be done to acquire.
MANAGEMENT OF OPERATIONS METHODS OF PRODUCTION. LEARNING INTENTIONS AND SUCCESS CRITERIA LEARNING INTENTIONS: I understand the different production methods.
Aggregate Planning.
2.10 Entrepreneurship I.  A category of expenditure that a business incurs as a result of performing its normal business operations.  Examples include:
Supply.  The concept of supply is based on voluntary decisions made by producers.  Supply; the amount of a product that would be offered for sale.
WHAT IS THE FUTURE FOR C&C?
Production and Productivity GDP is the market value of all goods and services produced in a nation’s economy during a given time. It is made up of consumer,
Specification section 3.1
PRODUCTION AND ESTIMATION CHAPTER # 4. Introduction  Production is the name given to that transformation of factors into goods.  Production refers to.
Welcome to ECON 2301 Principles of Macroeconomics Dr. Frank Jacobson Mr. Stuckey Week 2 Class 1.
1 Activity-Based Costing and Activity-Based Management
Business Costs and Revenues Reference 6.1 and 6.2.
Contract Negotiations/ Collective Bargaining (when unions represent workers in labor discussions with managers) Year-1890 Mrs. B Social Studies-8th.
CHAPTER © jsnyderdesign / iStockphoto 5 PLANNING AND FORECASTING.
Data Collection. The first state of the PSM is analysis where an organisation and its systems are examined to determine the nature of the problem to be.
Wages And Salaries What’s the difference?. Contents To answer the question “What’s the difference” the answer is simple… Wages are paid weekly, often.
Contingent pay- Incentives and rewards Individual Piece work: Uniform price per unit of production or pay is directly proportional to result Most piece.
Thirty-six years of experience in  Customer Service, Call Centers, Commercial, Manufacturing, Food & Distribution Environments  Serving Over 1,500 Demanding.
Unit 4 Determining Gross Earnings McGraw-Hill/Irwin Copyright © 2006 The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3 Economics in the United States 3.3. Profit Profit is the money a business or person makes after expenses have been paid. Profits are very important.
Paying Bills Warm Up: What are some bills your parents pay monthly? What must a producer consider when setting a price for the product being sold?
WAGES AND SALARIES lc/pm1. 2 WAGES AND SALARIES It is important that employees are properly rewarded for the work they do. Employers’ ObjectivesEmployees’
Do Now 1)What is the difference between supply and quantity supplied? 2)Are hotel rooms elastic or inelastic? Why? 3)What do producers have to consider.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin 11 th Edition Chapter 2.
The Islamic University –Gaza
Quality system With no system of quality control how do you distinguish between the good, the bad and the ugly? quality assurance is all the planned and.
Foundations and Evolutions
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
1 Chapter 16 Relevant Costs and Benefits for Decision Making.
Chapter 8 Beginning a New JobSucceeding in the World of Work What You Can Expect From Your Employer 8.2 SECTION OPENER / CLOSER INSERT BOOK COVER ART Section.
 How many work hours are in a week?  How many work weeks are in a year?  How many months are in a year? gross  What does gross mean in the business.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 16 Sales and Operations Planning.
SchedulingProducingControllingSchedulingProducingControlling.
Part Time Work Research Chris & Jack. Definition- A job where you don’t work 40hrs in a week. And you don’t get any sort of benefits.
Methods of Production GCSE Business Studies. Methods of Production Job Batch Flow Just in Time (JIT)
Kanban. What is Kanban Kanban means many things. Literally, Kanban is a Japanese word that means "visual card". At Toyota, Kanban is the term used for.
Unit 19.  Understand the impact on staff of various payment strategies, including time, piece rate, commission, full time versus part-time, freelance.
Workers Chapter 5 Pages When I grow up… 1.Complete the “My Work Learning Style” inventory. 2.Write about 2 jobs you might want to have when you.
Show Me the Money! Re-numeration and Pay Incentive Packages for Employees.
Pertemuan 23 Proses Bisnis SDM, Keuangan, dan Konversi Matakuliah: M0034 /Informasi dan Proses Bisnis Tahun: 2005 Versi: 01/05.
Activity-Based Costing
How Wages Are Set.
Activity-Based Costing and Activity-Based Management
Stakeholders The stakeholders of a business are those individuals or groups who are affected by the activities of the business and so have an interest.
How to calculate Commission.
Costs, Revenue and Profit
Implement expense-control strategies
Lecture 6: Time-Cost Trade-Offs
A look at Socialism and Communism
Presentation transcript:

Multi Factor Wage Incentive Program Plastic Part Trimming Process By Bill Caver

Process Definition The process that I wish to create a multi factor wage incentive program is the part trimming process. This is the process of taking a raw plastic part strait from the mold and trimming the excess plastic, commonly knows as flash, off the part to create a smooth surface. This process creates the finished plastic product in tooling.

Performance Factors The wage incentive plan should be based on the time in which the part is trimmed and also the quality in which it is trimmed. The program should be based upon these factors, because they are critical to the performance of the facility

Unit of Measurement The job should be based on a per part measurement. The per part method would give the worker incentive to keep a constant flow of work throughout the whole day. This would also reward the workers who are working hard, and give the person a way to gage the amount of work there doing based on the amount of output they are producing.

Weighted Factors The two factors would be weighted equal due to the fact that if the part is trimmed badly the part is no good to the customer, so it is no good for company. This would mean that the company would just lose money due to the fact that the part cannot be sold or salvaged due to the error.

Method of Implementation Conduct a time study of existing process. With the data compose an average number of parts created during a normal shift. Set a per unit price on each individual piece. Provide a two week test period to gather results and compare data to the existing program.

Benefits Production will be increased due to the per price incentive, and with the production increase parts will be delivered faster helping customer receive products on time. This will also prevent people from working slower to obtain more hours, resulting in less overtime