Building a Title Plant Doug Bello D. Bello Associates, Inc. Pasadena, California 2004 halFILE User Group Austin, Texas.

Slides:



Advertisements
Similar presentations
An Indispensable Quality Assurance Tool for Dairy Processing Plants.
Advertisements

RFP Technical Assistance. Thank you for selecting Council on Agings RFP Technical Assistance! Hello! I m Nate, your narrator. I will guide you through.
Integrating halFILE with Your Closing Package Session VII.
Chapter 4 Quality Assurance in Context
“What do you want me to do now?”
How to Document A Business Management System
GCSE PROJECT GUIDELINES Use this presentation to make sure you have the correct content for you project - click on.
WHAT YOU ALWAYS WANTED TO KNOW ABOUT AUDITING BUT WERE AFRAID TO ASK PASPB Technical Session October 31, 2006.
CASH HANDLING Training Presentation
Constructing the Memories Creating a Digital Collection Linda J. White, Digital Project Coordinator.
1 presented by: Tim Haithcoat University of Missouri Columbia QA/QC and Risk Management.
Validation and Verification Today will look at: The difference between accuracy and validity Explaining sources of errors and how they could be overcome.
Database Design IST 7-10 Presented by Miss Egan and Miss Richards.
Copyright © 2015 Pearson Education, Inc. Processing Integrity and Availability Controls Chapter
Systems Analysis Chapter 8 P 94 to P 101
IT Assurance and Reliability Why Should You Care? Richard Oppenheim, CPA, CITP President, SysTrust Services Corporation Presented to ISACA Regional Meeting.
November 2009 Network Disaster Recovery October 2014.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Today’s Lecture application controls audit methodology.
Copyright 2010, The World Bank Group. All Rights Reserved. Agricultural Coding and Data Processing Section B 1.
QuickBooks: Year-End Procedures
Collecting, processing and using… The Importance of Data.
EaTIS Vendor Training - FY EaTIS Training for Vendors – Process Overview EaTIS Version 3.01 Last Modified on April 5, 2007.
INFO 637Lecture #81 Software Engineering Process II Integration and System Testing INFO 637 Glenn Booker.
IT Security for Users By Matthew Moody.
Software Quality Assurance Activities
ADOPTING OPEN SOURCE INTEGRATED LIBRARY SYSTEMS Best Practices Presented by Vandana Singh, PhD Assistant Professor, School of Information Sciences University.
Budgeting & Cash Control Maximizing Your Resources.
Recordkeeping for Good Governance Toolkit Digital Recordkeeping Guidance Funafuti, Tuvalu – June 2013.
Setting up an Internal Audit Program By
NCLA RTSS September 30, Cataloging  Completed In-house  Copy cataloging with editing for local needs  Original cataloging when necessary  Professional.
1 Maintain System Integrity Maintain Equipment and Consumables ICAS2017B_ICAU2007B Using Computer Operating system ICAU2231B Caring for Technology Backup.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
A Guide for Barber Professionals Liability and Risk Reduction Associated Hair Professionals ©2012.
Hal Systems Corporation. Mission Create products and services that Make your work day a little easier Reduce your production costs Improve your response.
I.Information Building & Retrieval Learning Objectives: the process of Information building the responsibilities and interaction of each data managing.
State and Local Records Management DISASTER PLANNING Presented By State and Local Records Management Division Texas State Library and Archives Commission.
Developing an In-House Air Quality Audit Program March 22, 2006 Judy B. Yorke Yorke Engineering, LLC x25
Writing requirements specifications. Why we need requirements specifications To give structure to your desires To avoid waste of resources To avoid slippage.
Developing a Relationship Step Four: Planning and Going on a Visit.
Mission Critical Application Architecture and Flash August MDCFUG Chafic Kazoun, Founder and CTO Atellis: | Weblog:
ACIS Introduction to Data Analytics & Business Intelligence Verifiabilit y.
CMSC 345 Fall 2000 Requirements Overview. Work with customers to elicit requirements by asking questions, demonstrating similar systems, developing prototypes,
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
HalFILE 2.1 Network Protection & Disaster Recovery.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Requirements / Specifications. 01/18/10CS-499G2 Requirements Determine what the customer needs (wants) the software to do  What are requirements?  An.
INTERNAL CONTROLS What are they? Why should I care?
HIPAA Training Workshop #1 Council of Community Clinics – San Diego February 7, 2003 by Kaye L. Rankin Rankin Healthcare Consultants, Inc.
Software Quality Assurance and Testing Fazal Rehman Shamil.
Data Coordinators Conference – 2014 Laura Marroquin CASEWORKER/JCMS Specialist Everything New Data Coordinators Should Know.
2015 Advanced Seminar Kim Horton, CAE – Durham County & John Burgiss, RES – Forsyth County.
Docket number CP16-21 Tennessee Gas Pipeline, LLC (the Northeast Energy Direct pipeline)
SMART Tip Sheets Maryland February 2008 IGSR Technical Support: Client Referral Consent Referral Accepting Referrals This tip sheet focuses.
Validation & Verification Today will look at: The difference between accuracy and validity Explaining sources of errors and how they could be overcome.
The ABC’s of Buying a House Compliments of Home Team Advantage Realtors: Joy Rochlitz & Matt Smith Direct: (586) Website: C. Looking.
Deriving Consistency from LEGOs What we have learned in 6 years of FLL by Austin and Travis Schuh © 2005 Austin and Travis Schuh, all rights reserved.
 Planning is the initial part of any of the construction project. It makes things a lot easier to handle and organize.  Construction.
Session 6: Data Flow, Data Management, and Data Quality.
14 May 2014 Information Security, Information Governance and the Law – Confidence in Compliance © Contact Leonardo for reuse
This tip sheet focuses on how to share client records and make client referrals using SMART. Total Pages: 6 Client Consent and Referral Consent Referral.
Math 1050 Project Part 3 Joshua Funderburk Sarah Hansen
Kate Fairweather CMCAust Marketing QAC Assessor & IQA
Web Appointments NMMU Perspective ITS UG 2015 Session 46 and 47
Processing Integrity and Availability Controls
Introduction to Internal Audits
Reasons why Chiropractic Claims get Delayed or Denied
LGC Website, Software updates, Documentation, and Videos
Lac Courte Oreilles Ojibwe Community College
Presentation transcript:

Building a Title Plant Doug Bello D. Bello Associates, Inc. Pasadena, California 2004 halFILE User Group Austin, Texas

Introduction There’s no “road map” to follow There’s no “right way” to do this You will only do this once, no second chances! Building a Title Plant

What to expect This is a big time commitment Don’t think this will be easy Building a Title Plant

Before you begin Talk to other title companies: they are a great resource for do’s and don'ts Talk to someone at hal Systems: they’ve been through a few of these over the years Appoint a project manager, give someone this responsibility. Building a Title Plant

Set-up Checklist Obtain all source documents Plat edits Establish all keying/posting rules and put them in writing Locating/arbing procedures Building a Title Plant

Establishing Keying Rules Understand necessities vs. luxuries; Everything you key costs $$ Understand the purpose of what you are keying: Will you be searching from the title chain or looking at each document? Don’t ‘go crazy’ in the portion of legal or the remarks field Building a Title Plant

County Name Indexes Can you obtain an outside source of grantor/grantee names? Do you agree with the parties that are picked up from the documents? Is it consistent and reliable? Always have a back-up plan Building a Title Plant

Dealing with Locates What is a locate? Count on 10-12% of all recorded documents to be located How do deal with locates in a backplant vs. daily keying Building a Title Plant

Testing & Quality Assurance Always complete a sample keying test Continue testing until you get satisfactory results Quality check work on a regular basis Never assume that a good sample will continue forever – things change What is an acceptable error rate? Building a Title Plant

Ensuring Quality Single pass vs. double pass Sight verification vs. key verification How does key verification work Plat edits: verifying lots and blocks as well as valid Sections, Townships and Ranges Building a Title Plant

Outsourcing: Is it for me? No in-house staff training, no hiring, no firing No overtime when recordings soar Lower plant maintenance costs Start-up is a lot of work Less ‘control’ over personnel Continued QA will be your responsibility Pros Cons Building a Title Plant

Outsourcing: Selecting a Vendor Obtain and contact multiple references Ask specific questions: “How would you..?” If they don’t know what sectional property is, you are probably talking to the wrong vendor Do they understand title? Do they have other capabilities such as to search or arb? Building a Title Plant

Protecting your Data Back up your plant and images Use at least one off-site source of data storage Be sure to back up plat edits, PIN lists, and any other tables or data Hard copy data should be filmed or scanned directly into halFILE Building a Title Plant

Success and Failure stories…

Famous Last Words “I wish I had talked to someone who had done this before.” “I didn’t know how hard this was going to be.” “I didn’t budget enough time.” “I didn’t understand how the title searching software worked with what I had keyed.” “I wish I had understood this from the start.” Building a Title Plant

Questions & Discussion