Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Spring 2008, King Saud University Cash Flow Analysis Dr. Khalid Al-Gahtani 1 Payment schedule Materials Mobilization Monthly payments Final Payment Contract.
Chapter 7 Schedule Control
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Construction Engineering 221 Cost Estimating and Bidding II.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Chapter 10 Resource Management. Objectives Human Resource Management Capital Resource Management Managing the Resource Profile.
Spring 2008, King Saud University PERT Dr. Khalid Al-Gahtani 1 Activity Duration 1.“Guess” the activity duration, especially smaller activities. 2.Use.
Spring 2008, King Saud University Bar Chart Dr. Khalid Al-Gahtani 1 What is Activity An activity or task is a given kind and amount of work which: –Consumes.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Supplement Advanced Methods for Project Scheduling McGraw-Hill/Irwin.
Chapter 9: Reducing Project Duration
Reducing Project Duration
SCHEDULE COMPRESSION In real practice – how would you compress your Schedule?
Reducing Project Duration: Project Crashing
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Reducing Project Duration
Scheduling & Resource Planning CTC-415. Schedule Compression Used to decrease schedule time –At what price? Does cost of compression outweigh liquidated.
Accelerating the project Edina Nagy Lajos Kiss Szabolcs Hornyák.
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 1 Updating Construction Schedules Procedure: –Change the duration of all.
Spring 2008, King Saud University Resources Leveling & Allocation Dr. Khalid Al-Gahtani 1 How Limited Resources Affect Schedule Float.
OPER 576 Project Management Reducing Project Duration or Project Crashing Greg Magnan, Ph.D. May 20, 2004.
Quiz#1 Chapter 5: Estimating Project Times and Cost
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Analyzing Cost-Time Trade-Offs There are always cost-time trade-offs in project management. – You can completing a project early by hiring more workers.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
ECCS5209 Project Planning & Control Faculty of Applied Engineering and Urban Planning Civil Engineering Department Example 2 nd Semester 2010/2011 Eng:
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Module 7 Session 7.2 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.2 Scheduling and allocating resources with CPM.
Time/Cost Trade-off Analysis
Chapter 9: Reducing Project Duration
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
1 Project Planning, Scheduling and Control Project – a set of partially ordered, interrelated activities that must be completed to achieve a goal.
Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening) Time-Cost Trade-Off (Time Reduction = Time Compression) (Time Shortening)
Presented by: Meysam rahimi
9-1 Chapter 9 Project Scheduling Chapter 9 Project Scheduling McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Reducing Project Duration CHAPTER NINE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Operations Fall 2015 Bruce Duggan Providence University College.
CPM – Critical Path Method Can normal task times be reduced? Is there an increase in direct costs? Additional manpower Additional machines Overtime, etc…
Strategic Project Management1SPM PERT/CPM Technical Issues - Part 2 PERT/CPM Technical Issues zPERT & CPM Technical Issues: yResource Loading & Leveling.
1 6. T IME -C OST O PTIMIZATION Objective: The optimization of project duration and cost by an appropriate crashing of activities. Summary: 6.1 Finding.
 Delay in project implementation invariably results in cost- overrun.  Delayed project implementation means delay in getting return on investments made.
TOPIC-6- TIME-COST TRADE OFF
Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
CONSTRUCTION MANAGEMENT AND ADMINISTRATION UNIT - III.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management What are businesses trying to achieve by using Operations Management? (done on AS) EFFICIENCY.
Time-Cost Trade-off Models
Project Management 6e..
Reducing Project Duration
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
TOPIC-8B- PROJECT COST CONTROL
The Law of Supply What is Supply?.
Project Planning & Scheduling
Reducing Project Duration
Project Planning & Scheduling
Lecture 6: Time-Cost Trade-Offs
CONSTRUCTION MANAGEMENT AND ADMINISTRATION
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Where We Are Now. Where We Are Now Rationale for Reducing Project Duration Time Is Money: Cost-Time Tradeoffs Reducing the time of a critical activity.
Presentation transcript:

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit within the contractually required time (influences Bid price). 3.To avoid paying Liquated Damages/Damage for delay causes (or avoid damaging the company’s relationship). 4.To complete a project early & move on to another project (Although the Job-specify profit may reduce, company profile may increase). 5.To complete a project when weather conditions make it less expensive (Avoid temporary Heating, avoid completing site work during raining season).

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 2 Methods to reduce durations: 1.Have the existing crew work overtime. This increase the labor costs due to increase pay rate and decrease productivity. 2.Bring in additional workers to enlarge crew size. This increases labor costs due to overcrowding and poor learning curve. 3.Use better/more advanced equipment. This will usually increase costs due to rental and transport fees. If labor costs (per unit) are reduced, this could reduce costs. 4.Add subcontracted labor to the activity. This almost always increases the cost of an activity unless the subcontracted labor is for more efficient.

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 3 Project Costs Definitions

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 4 Practices to Estimate the Project cost Some company assigns Overhead office as % of direct cost. Most companies don’t consider profit as a cost of the job. Instead, analysis are completed by using Direct costs + Indirect costs + Company overhead vs. Budgeted (estimated costs). Similar to each activity, the project as a whole has an ideal (Lease expensive) Duration.

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 5

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 6 Accelerating the Critical and Noncritical path

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 7 Determine Normal project duration, and cost. Identify Normal duration Critical Path. For large network, using CRITICALITY THEORM to eliminate the noncritical paths that do not need to be crashed. Compute the cost slop : Network Compression Algorithm

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 8 shortening the CRITICAL ACTIVITIES beginning with the activity having the lowest cost-slope Determine the compression limit (Nil) Network Compression Algorithm

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 9 Organize the data as in the following table: Update the project network Network Compression Algorithm

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 10 When a new Critical path is formed: –Shorten the combination of activity which Falls on Both Critical Paths, OR –Shorten one activity from each of the critical paths. Use the combined cost of shortening both activities when determining if it is cost effective to shorten the project. At each shortening cycle, compute the new project duration and project cost Network Compression Algorithm

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 11 Continue until no further shortening is possible Tabulate and Plot the Indirect project Cost on the same time-cost graph Network Compression Algorithm

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 12 Add direct and indirect cost to find the project cost at each duration. Use the total project cost-time curve to find the optimum time. Network Compression Algorithm

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 13

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 14

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 15

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 16

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 17

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 18

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 19

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 20 Project Optimal Duration

Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 21