8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http//www.rbs.com.na ; 061-306058 ; 0812772546 Risk – Based Solutions cc.

Slides:



Advertisements
Similar presentations
Planning, Budgeting, Acquisition & Management of Capital Assets Capital programming is an integrated process within an agency for planning, budgeting,
Advertisements

Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Hazard Prevention Program
Contractor Safety Management
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
ENVIRONMENTAL MANAGEMENT PLAN
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Waste-related opportunities: Curricula at the North-West University, Potchefstroom Campus JOBURG WASTE SUMMIT, 25 March 2015 Dr. Claudine Roos Centre for.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Environmental Impact Assessment (EIA): Overview
CHAPTER 4 The strategic Planning function รศ. ดร. เสรี วงษ์มณฑา.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
IAEA International Atomic Energy Agency Overview of legal framework Regional Workshop - School for Drafting Regulations 3-14 November 2014 Abdelmadjid.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
People & Mining Continuously Balancing & Increasingly Challenging.
Hazards Risk Management Course Revision Project Update George Haddow June 2012.
Will Speller Economist, Investment Issues Section United Nations Conference on Trade and Development Investment Contracts for Agriculture: Practical Guidelines.
IAEA International Atomic Energy Agency LICENSING OF RADIOACTIVE WASTE MANAGEMENT FACILITIES Luc Baekelandt Safety of radioactive.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Decommissioning WGEI 2nd meeting, Oslo, September 2015.
Copyright © February 2003 Green Gain Consulting (Pty) Ltd. All rights reserved. Green Gain Consulting (Pty) Ltd Air Quality Legislation Workshop Thursday,
Review of the Operational Policies and Guidelines: key issues from a civil society perspective Sven Harmeling, Germanwatch Held.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
“ OVERALL DECISION MAKING IN PLANNING FOR REMEDIATION OF URANIUM MINES” Presentation to the Senior Regulator’s meeting at the 56 th IAEA General Conference.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Environmental Protection and Permitting Nurhan IZAIRI Minister of Environment and Physical Planning Republic of Macedonia CONSTRUCTION PERMITS FOR A COMPETITIVE.
A presentation on the stages of the mining cycle and how communities can be involved. Module No. 3 Life Cycle of Large-Scale Mining.
Overview of Environmental Impact Assessment. Overview of EIA The Basics Who Sets the standards? Why do an E(SH)IA? Where does it fit in development planning?
A presentation on the stages of the mining cycle and how communities can be involved. Module No. 1 Life Cycle of Large-Scale Mining.
Part 6 – Special Legal Rights and Relationships Chapter 34 – Environmental Law Prepared by Michael Bozzo, Mohawk College © 2015 McGraw-Hill Ryerson Limited.
NCOP PRESENTATION OF THE MINERAL RESOURCES 2010 / 11 BUDGET DATE 12 MAY 2010 DEPARTMENT OF MINERAL RESOURCES.
Legacy Report of Select Committee on Finance By: Zolani Rento Date: 09 July 2014.
1 Meeting of Portfolio Committee for Minerals and Energy 25 March 2008, Cape Town Mineral and Petroleum Resources Development Amendment Bill.
ENVIRONMENTAL PROCESSES. NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 PROCESS FOR SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT Applicant Activities Public.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
Implementation of FAO Environmental Impact Assessment Guidelines in the new FAO project cycle Alemneh Dejene Climate Impact, Adaptation and Environmental.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Institutional Controls in Pennsylvania’s Brownfields Program Presented by: Jill Gaito Director, Brownfields Action Team Office of Community Revitalization.
1 PORTFOLIO COMMITTEE ON MINERAL RESOURCES DISCUSSION ON THE MINERAL RESOURCES 2014 / 15 STRATEGIC PLAN 8-9 July 2014 Programme 3 – Mineral Regulation.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
Presentation to Environment Portfolio Committee
EIA approval process, Management plan and Monitoring
Minerals and Petroleum Resources Development Bill
PORTFOLIO COMMITTEE MEETING 14 FEBRUARY 2017 Financial Provisioning Regulations Environmental Advisory Services.
Nuclear and Treaty Law Section Office of Legal Affairs
Nuclear and Treaty Law Section Office of Legal Affairs
DEPARTMENT OF MINERAL RESOURCES
Module 5 The Climate Expert and your role as a consultant
Using green credit lines to foster climate investment
NEPAL ADMINISTRATIVE STAFF COLLEGE Project Appraisal: Group Works
Relationship between World Bank and Romanian EA requirements
Briefing TO THE PORTFOLIO COMMITTEE ON MINE LICENSING TURNAROUND TIMES
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Risk – Based Solutions cc Risk – Based Solutions cc Mining and the Environment in Namibia Dr. Sindila Mwiya PhD, PG Cert, BEng (Hons), FGS, CEng, Pr. Eng PhD, PG Cert, BEng (Hons), FGS, CEng, Pr. Eng Technical Consultant or the Consulting Arm of Foresight Group Namibia (PTY) LTD

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Overview Background to Exploration and Mining Stakeholders and Challenges Current Legal Provisions for Mine Closure Current Major Legal Gap Future Solutions Knowledge-Based Approach – Legal and Technical Alignment Successful Mine Closure Plan Conclusions

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Climatic Setting

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Vegetation Zone

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ;

Background to Exploration and Mining Project Identification Apply for an Exclusive prospecting License (EPL) Scoping and Pre-Feasibility Studies Feasibility Studies: Economic resources modeling ongoing - EIA, EMP and Other Specialist Studies Apply for Mining License and if Granted Start with Construction and Development Operation: Mining, Ongoing Exploration, Ongoing Rehabilitation and Monitoring Closure, Final Rehabilitation and Monitoring Aftercare and Ongoing Monitoring Mining License (ML) Ongoing and Future Mining and Further Exploration [Open Pit Mining and Possible Underground, Blasting, Crushing, Screening and Processing with Further Mapping, Sampling and Drilling For Additional Resources Delineations – Ongoing Exploration, Rehabilitation, Monitoring and Mine Closure with Aftercare Plan] Reconnaissance License of Exclusive Prospecting License (EPL) Reconnaissance and Exploration [Review of Historical Data Sets, Ongoing, Field Mapping, Sampling, Initial Resources Evaluation, Further Drilling, Final Resources Evaluation

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Stakeholders and Challenges Stakeholders have different objectives: STATE: minimize exposure to long term risk MINES: minimize expenditure and walk away LABOUR: prevent /delay closure, no job losses COMMUNITIES & NGOs etc: preserve viable society Major technical stumbling blocks: Dealing with historical issues dues to old mines Confidence in predictions of long term impacts (Real and Perceived Impacts) Legal and Financing for post-closure management Often starting preparation for closure too late

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Current Legal Provisions for Mine Closure In accordance with provisions of the Minerals Act, Act No. 33 of 1992, operator informs MME the intention to cease operation in accordance with the provisions of the Minerals Act, Section 99 (Notice of cessation of mining operations). Undertake EA to review / adapt the existing EMP with respect to rehabilitation: Set closure objectives through consultative process Predict long term impacts using acceptable techniques Develop and implement rehabilitation process in accordance with the provisions of Sections 128 (Removal of Property) and 130 (Environmental liability during the course of the operation), finish the rehabilitation if money is still there and leave after inspection and approval by MME

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Current Major Legal Gap Operator may NOT be held liable for managing long term impacts during aftercare and after the completion of rehabilitation and approval by the State (THIS MUST BE PREVENTED AT ALL COSTS) In some cases a company may go into insolvency even before proper rehabilitation can be undertaken such that the STATE on behalf of the tax payers only takes-over both short and long term environmental liabilities which in some instances and overtime may negate all the positive economic and social gains made during the mine operations. (THIS MUST BE PREVENTED AT ALL COSTS)

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Future Solutions Through the development of effective regulations in consultations with all the stakeholders and within the provisions of the Environmental Management Act, (Act No. 7 of 2007) as well as amendments to the Minerals Act, the legal gap is likely to be closed through environmental certification of not more than 3 years as well as the requirements for financial guarantee in case of bankruptcies / lack of funding during rehabilitation and aftercare stages

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Knowledge-Based Approach – Legal and Technical Alignment Project Concept / Identification (Greenfield Project) ScopingPre-FeasibilityFeasibilityDesign Construction/ Operation/ Maintenance Closure / Decommissioning and Aftercare 1. Project Concept / Identification 2. Appoint an Environmental Practitioner 3. Develop Proposal through consultation 4. Determination of proposal / Renewal (Baseline Report Prepared) 5. Application with Baseline Report and Draft Environmental Management Plan for no Formal EIA Process 6. Notification with Baseline Report and Terms of Reference for full EIA 7. Review of Applications / Registrations 8. Full investigation, EIA Repot and Draft Environmental Management Plan (Mitigation Plan) 9. Application with Full EIA and Draft Environmental Management Plan 10. Record of Decisions 11. Conditions of Approval (May include financial Guarantee) 12. Appeal 13. Implementation of proposal 14. Monitoring, auditing and ongoing mitigations 15. Renewal every less than three (3) years with final revaluation at closure / Decommissioning 16. Define an Aftercare Timeframe (Some Sort of Guarantee to Engineering Systems done during Rehabilitation) with Certification at the end of the Aftercare Period The Environmental Impact Assessment (EIA) Procedure – The Gateway to Environmental Sustainability Exclusive Prospecting License (EPL) Mining License (ML)

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Successful Mine Closure Plan Undertaken according to a predefined schedule over life of mine Effective begetting and financial provisions through regular Environmental Assessment and adjustment of the budgeting process Adapted a Risk-Based Approach (Source - Pathway - Target Chain) Mine closure not considered a site greening but long-term Environmental Management Proactively identified and implemented pollution prevention measures through effective monitoring

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; Conclusions Mine closure and aftercare should be a logical, scheduled process incorporating all stakeholders with the State giving a clear guidance. Its important to adopt appropriate methodologies such as Risk and Knowledge-Based Approaches in Environmental Assessment for Mine Closure and Aftercare Management. The focus must be for the management of long-term environmental liabilities of which upon closure of the operating company must be transferrable to a technically sound entity together with the accumulated financial resources for the aftercare stage. Need to resolve outstanding issues such as financial provisions / guarantee beyond the life of a mine and the closure of the company that operated the mine

8 th Floor Capital Centre Building Levinson Arcade WINDHOEK CBD; Global Office http// ; ; End and Thank You Risk – Based Solutions (RBS) cc Risk – Based Solutions (RBS) cc The Consulting Arm of Foresight Group Namibia (PTY) LTD