Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E31 27.9 hrs 3125Sat 23:414.2E31.

Slides:



Advertisements
Similar presentations
Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)
Advertisements

Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon.
Arnd Meyer (RWTH Aachen) Jan 23, 2004Page 1 Data Taking Jan 16 – 23 Store # BeginLum [cm -2 s -1 ]Duration 3175Fri Jan 16 16:23 4.5E hrs 3177Sat.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Arnd Meyer (RWTH Aachen) Feb 25, 2004Page 1 Status of Data Taking Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting February 25 th, 2004.
Arnd Meyer (RWTH Aachen) Dec 4 th, 2003Page 1 Tevatron and DØ Status and Plans Arnd Meyer, RWTH Aachen DØ Germany Meeting December 4 th, 2003.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
A Monte Carlo Model of Tevatron Collider Operations Elliott McCrory, BD/(Linac & Integration) 4, 5 December 2003 A phenomenological model of Tevatron Collider.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E31.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Changes in delivered luminosity by varying the store length, using the luminosity projection model described in in Beams-doc-2022 Vaia Papadimitriou 30.
5 Day Forecast Mon Tues Wed Thu Fri.
Personal Success Tracker
GWG Wheels
GANTT CHARTS Example Example Example Example text Tasks Example 1
Mon – 2Tue – 3Wed – 4Thu - 5Fri - 6Sat - 7Sun - 8 Mon – 9Tue – 10Wed – 11Thu - 12Fri – 13Sat – 14Sun -15 Mon – 16Tue – 17Wed – 18Thu - 19Fri – 20Sat –
Time Revision.


MON TUE WED THU
GANTT CHARTS Example Text Text Here Text Here Text Here Text Here
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017 Jan Sun Mon Tue Wed Thu Fri Sat


January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN

Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.
Jan Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
June 2018 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
Sun Mon Tue Wed Thu Fri Sat
1 - January - Sun Mon The Wed Thu Fri Sat
2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
Sun Mon Tue Wed Thu Fri Sat
Name: ______________________________
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Fraction Jeopardy multiply Add/ subt. divide Frac. To dec
June 2017 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
Sun Mon Tue Wed Thu Fri Sat
WEB PAGES: Tables Welcome Back !.

June 2019 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
DEVELOPMENTAL SUMMER RUNNING
2008 Calendar.
Presentation transcript:

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E hrs 3125Sat 23:414.2E hrs 3127Mon 4:404.4E hrs 3130Tue11:284.6E hrs 3132Thu 1:59 4.7E hrs 7 of the 8 best stores (initial luminosity) in the last month Long stores, targeted studies and recycler shots 141 (!) hrs in store for the week

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 2 Integrated Luminosity

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 3 Data Taking Jan 2 – 8 Day∫L dt (del)∫L dt (rec)Efficiency FriJan nb nb % SatJan nb nb % SunJan nb nb % MonJan nb nb % TueJan nb nb % WedJan nb nb % ThuJan nb nb % This week 10947nb nb % Best week9786nb nb % (May ) Only category where we have not set records recently is efficiency... All-time best

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 4

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 5 Store 3123 (Jan2-3) Initial Lum. 4.3 ⋅ cm -2 s -1 SBC (0x53)Restart CFT (23min)temperature control program (15min)

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 6 Store 3125 (Jan3-5) Initial Lum. 4.2 ⋅ cm -2 s -1 SMT HDI, 2xL2 medium hammerM200 tripsEnd store confusion (50min)(18+15min) L1 Trigmon down for much of the store

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 7 Store 3127 (Jan5-6) Initial Lum. 4.4 ⋅ cm -2 s -1 STT outM200 trip, x24/x25 outfix CTTSTT (15min)(13min)(22min)(15min) (slow NFS) NFS overloaded evening/owl

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 8 Store 3132 (Jan8-9) Initial Lum. 4.7 ⋅ cm -2 s -1 First run ever with >500nb -1 recorded (507nb -1, run ) Inappropriate prescalesMuon PDT231hot tower chosen(32min)(30min)

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 9 Store 3130 (Jan6-7) Initial Lum. 4.6 ⋅ cm -2 s -1 SMT HDI B4-L6-05SBC 0x51 + farm resetEnd-of-store studies (22min)(28min)Special run (CTT)

Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 10 Agenda RussMechanical StuOnline Fritz / GeoffControls Michiel / ElliotGM Michael / SergeySMTStefan / BrigitteCTT Fred / Drew / AbidCFT / PSBill L. / LarsSTT RobertCALJeffL1Muon Al ItoCentral MuonMiroslavL2 DmitriForward MuonGordon / DougL3 BrendanLuminosity Andrew / Mike S.FPD