DØ FPD Overview Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot 233359 33230 57 P 2 OUT Q2 P 1 DN P 2 IN D2 Q4Q3Q2 FPD.

Slides:



Advertisements
Similar presentations
FPD FPD STATUS JORGE MOLINA CBPF February FPD Current FPD Group UTA –Andrew Brandt –Andrew Brandt (faculty) –Mike Strang (grad student) –Pierrick.
Advertisements

June 2003 M.Mulders - Fermilab 1 Diffractive results from DØ and prospects for Run II Martijn Mulders Fermilab for the DØ collaboration (with special thanks.
M.Gallinaro, ``Innovative Particle and Radiation Detectors’’, Siena, October slide 1 The CDF MiniPlug Calorimeter Forward Physics Conceptual.
Elastic Scattering at s=1.96 TeV Using the DØ Forward Proton Detector
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate students investigate.
U.T. Arlington High Energy Physics Research Summary of Activities August 1, 2001.
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate students investigate.
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
Jorge Barreto Low_x Prague1 Status of Diffractive Physics at DØ Run II Jorge Barreto Instituto de Física - UFRJ Rio de Janeiro – RJ - Brazil Outline.
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
FPD FPD STATUS JORGE MOLINA CBPF February FPD  10 detector cartridges have been installed: 8 in the vertical plane, 2 at Dipole locations  We.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Forward Proton Detector Update  9 momentum spectrometers comprised of 18 Roman Pots  Scintillating fiber detectors can be brought close (~6 mm) to the.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Diffractive Triggers E   Andrew Brandt, U. Texas at Arlington Trigger Integration November 18, 2003 A1UA2U P2DP1D P Pbar LM VC.
Lishep06 Gilvan Alves1 Overview of Diffraction from DØ Gilvan Alves Lafex/Brazil  Introduction  DØ RunI x RunII  Special Runs  Outlook.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
1 PID & FPD Software Gilvan Alves (Lafex/CBPF) Q4Q4 D S Q2Q2 Q2Q2 Q3Q3 Q3Q3 Q4Q4 S A 1Q A1SA1S A 2Q A 2S P 1Q P 2S P 1S P 2Q p p Z(m) A D1 Detector Roman.
Elastic Scattering and Diffraction at DØ Tamsin Edwards for the DØ collaboration 14 th - 18 th April, 2004 XII International Workshop on Deep Inelastic.
Small_X / 09/17 – 09/20Jorge Barreto – UFRJ The D0 Forward Proton Detector (FPD) Status Jorge Barreto IF – UFRJ/CBPF D1 TDC D2 TDC pbar p.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Diffraction at DØ: Past, Present, and Future E   Andrew Brandt, University of Texas at Arlington Future QCD Workshop May 20, 2004 Fermilab A1UA2U P2DP1D.
Small_X / 09/17 – 09/20Jorge Barreto – UFRJ The D0 Forward Proton Detector (FPD) Status Jorge Barreto UFRJ/CBPF - Brazil D1 TDC D2 TDC pbar p.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
DØ Forward Proton Detector Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
Why study Diffractive W Boson?. Data Samples Z boson sample: Start with Run1b Z ee candidate sample Central and forward electron W boson sample: Start.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Diffractive Physics E   Andrew Brandt, U. Texas at Arlington DØ Physics Workshop July 30, 2004 Fermilab A1UA2U P2DP1D P Pbar LM VC Focus on mature analyses:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Low Luminosity Opportunities Andrew Brandt, U. Texas at Arlington DØ ADM November 18, 2005 “easy” “really hard”
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Diffractive W/Z Bosons Andrew Brandt UTA Run I Diffractive W/Z Boson Production Recap Run II Preliminary Search for Diffractive Z Bosons (Courtesy of Tamsin.
Agenda FPD Overview Andrew 30 mins Tunnel Status: 1) Castle Status Christophe 2) Detector Status Mike S. 3) Elec. rewiring+safety Pierrick 4) Amplifier.
Andrew Brandt FPD Rio Workshop Mar Forward Proton Detector Overview Andrew Brandt University of Texas at Arlington.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
__________________________________ C. Avila, small x workshop, Sep ELASTIC SCATTERING IN D0 EXPERIMENT Carlos Avila Universidad de Los Andes Bogota,
DIS 2001 Bologna Hard Diffraction at DØ Run I and Run II Christophe Royon DØ Collaboration / DAPNIA-SPP Saclay, UT Arlington, Brookhaven.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Michael Strang Physics 5391, 22/July/02 Diffraction and the Forward Proton Detector at DØ Michael Strang Physics 5391.
UPDATE ON THE FORWARD PROTON DETECTOR Gilvan Alves Lafex/CBPF Introduction Accelerator Roman Pots Detector Future Plans April 1, 1998 (no kidding)
FPD Status and Plans Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2 Q4Q3Q2.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
SEQUENCER DELAY PLD By ANTON H.C. SMITH ELECTRICAL ENGINEERING UNIVERSITY OF SOUTH CAROLINA.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
FPD Status and Data Quality Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Diffraction at DØ Andrew Brandt University of Texas at Arlington E   Run IRun II Low-x Workshop June 6, 2003 Nafplion, Greece.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
V13/V14 QCD Andrew Brandt, UTA Collab TB 9/23/2004 V13: New dijet mass triggers (Hong Luo, Don Lincoln) JT_95 New L2, prescaled at high lum (>55E30) JT_125.
Roman Pots and Microstations based on talk by Jaak Lippmaa Helsinki CERN 2005.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Diffraction at DØ E   Andrew Brandt, U. Texas at Arlington Future QCD Workshop May 20, 2004 Fermilab A1UA2U P2DP1D P Pbar LM VC.
FORWARD ATLAS {major contributions from Per Grafstrom (CERN), Michael Rijssenbeek (Stonybrook), Brian Cox (Manchester} Andrew Brandt Luminosity measurement.
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
An FPD quadrupole castle Elastic Scattering and High Mass Exclusive Dijets at DØ (  s=1.96 TeV) Andrew Brandt University of Texas, Arlington on behalf.
ELENA installation progress F. Butin / ELENA collaboration.
DØ Hard Diffraction in Run I and Prospects for Run II Andrew Brandt DØ / University of Texas, Arlington Intro and Run I Hard Diffraction Results Forward.
Project definition and organization milestones & work-plan
Andrew Brandt University of Texas at Arlington
First data from TOTEM experiment at LHC
FPD Status and Data Quality Andrew Brandt
FPD Motivation Andrew Brandt UTA
Dzero Collaboration Meeting Sep. 22, 2004
The D0 Forward Proton Detector (FPD) Status
Presentation transcript:

DØ FPD Overview Andrew Brandt UTA Q4 D S Q3S A1A2 P 1 UP p p Z(m) D1 Detector Bellows Roman Pot P 2 OUT Q2 P 1 DN P 2 IN D2 Q4Q3Q2 FPD Workshop February 20, 2003 Fermilaab

Workshop Goals Bring FPD detector group, proton-ID, and physics group together (if video allows), generate discussion Evaluate current status, problem areas, and issues Identify manpower shortages and attempt to address them Identify obstacles to producing physics results Develop plan for next six months

Diffraction Thesis Topics Soft Diffraction and Elastic Scattering: Inclusive Single Diffraction Elastic scattering (t dependence) Jorge Molina Total Cross Section Centauro Search Inclusive double pomeron Search for glueballs/exotics Hard Diffraction: Diffractive jet Michael Strang Diffractive b,c Diffractive W/Z Diffractive photon Diffractive top Diffractive Higgs Other hard diffractive topics Double Pomeron + jets Tamsin Edwards Other Hard Double Pomeron topics Rapidity Gaps: Central gaps+jets Topics in RED were studied Gap tags vs. proton tags with gaps only in Run I Double pomeron with gaps   E 1000 tagged events in Run II

All 6 castles with 18 Roman pots comprising the FPD were constructed in Brazil, installed in the Tevatron in fall of 2000, and have been functioning as designed. A2U pot had vacuum leak and was disabled for 6 months and fixed during Jan shutdown. A2 Quadrupole castle installed in the beam line. Castle Status

Detector Setup 0.8 mm 3.2 mm 1 mm mm U U’ X X’ V V’ Trigger 6 planes per detector in 3 frames plus a trigger scintillator U and V at 45 degrees to X, 90 degrees to each other Planes in a frame offset by ~2/3 fiber (4 fibers/bin) 2 detectors per spectrometer, 7 MAPMT per detector

At the University of Texas, Arlington, scintillating and optical fibers were spliced and inserted into the detector frames. Detector Assembly 20 detectors (includes 2 spares) built at UTA, sent to Fermilab, 10 installed, others in preparation at Fermi (see Mike S. talk).

All 18 cartridges have been assembled, 16 are installed in tunnel (10 with full detectors 2 with trigger scint). The 10 instrumented pots (Phase I) are ups, downs, and dipoles. Cables and tunnel electronics (low voltage, amp/shapers, etc.) installed and completely operational for Phase I, mostly operational for Phase II 18 pots setup (more later). 10 more detectors (includes 2 spares) are complete except for final polishing, which is in progress at Fermilab. Tunnel and Detector Status P2 Quadrupole castle with up and down detectors installed.

In the October 2001 shutdown four veto counters (designed at UTA, built at Fermilab) each of which cover 5.2 < |  | < 5.9 were installed between DØ and the first low beta quadrupole (Q4), about 6 m from the interaction point. The counters, two each on the outgoing proton and anti-proton arms, can be used in Diffractive triggering (veto proton remnant). Veto Counters

Pot Motion Pot motion is controlled by an FPD shifter in the DØ Control Room via a Python program that uses the DØ online system to send commands to the step motors in the tunnel.

Pot Motion Safeguards The software is reliable and has been tested extensively. It has many safeguards to protect against accidental insertion of the pots into the beam. The drivers are disabled with a switch in the Control Room when the pots are not being moved. The pots are hooked to an emergency line which bypasses the software to send the pots back to the home position in case of emergency.

Pot Insertion Monitor Effect of the pot motion on the proton and antiproton losses at DØ and CDF is monitored using ACNET. Current agreement with Beams Division and CDF requires that the effect on halo rates is less than 10%.

Recent FPD Milestones

FPD Contributors Brazil (LAFEX, UERJ, UFRJ, UNESP) UTA Los Andes (people) Fermilab($) Manchester(people) MSU ($) Nebraska ($) Thanks Greg! NIKHEF ($) NIU (Machine shop) Northwestern($) Notre Dame ($) Prague (people) Saclay (people) Manchester(people) Fermilab($) Can we generate more interest/support?

People+Jobs at Fermilab Leaving: Luiz, Jorge B. THANKS Jorge Leaving FPD: Victor THANKS Victor New people: Tamsin Edwards (grad student) Mary Elena Pol (UERJ faculty 2 mos) Continuing Full-time people: Mike S., Wanda, Carley, Ricardo Continuing Part-time people: Mike M., Vladimir FPD Experts: Carley, Wanda, Ricardo, Mike, Victor Trainees: Tamsin +? Jobs 1) Trigger integration and commissioning (all) 2) Expert shifts 3) Access coordination (?+AB) +accesses (all+?) 4) Run plan+shift schedule (MS+AB) 5) Friday 2 pm meeting (MS) 6) Examine (MS) 7) Database + Pot motion (WP+VS) 8) SCR triggering (MS?) 9) Data analysis (MS+TE) 10) Halo studies (MS+AB+WP+CM) *NEED MORE PEOPLE!

FPD January Shutdown Access Coordinator: Victor Bodyagin TUNNEL: 1)A2 vacuum repairs, requires coordination with BD and survey  (completed without bakeout) 2)Cable repairs  (only a few dead channels remain in phase I: note should produce list) 3)Detector installation (12 detectors and 6 pseudodetectors) ~  (10+6) 4)LVDT debugging  (bad LVDT found) 5)Pot motion upgrades ~ some done (see W.P talk) 6)Replacement of extension cables+ORC (not done) 7)Add some sandbags? (soon) COLLISION HALL: 1)PW08 preparation: installation of 3 TPP’s and AFE’s ~ 3 TPP’s installed, but only 2 AFE’s due to contact or noise problems (see V.B talk)

Access List TUNNEL: 1)Detector installation A1I+P1O to SCR (needs rearrangement of A/S to only use 11 boards) 2)Add sandbags at P2 and in front of electronics 3)Open air flow on P side 4)A2I LVDT replacement 5)A1O pot motion debugging 6)LMB pin/diode adapters 7)Phase II work (July shutdown) COLLISION HALL: 1)Debug AFE/TPP noise

FPD Operations FPD Operations Continue with expert shifters to insert pots and calorimeter shifters to monitor system and remove pots Re-establish operating positions, since may have changed due to access and A2 vacuum repairs Begin commisioning integrated FPD -Take calibration runs, understand noise -Finalize AFE timing -Take data recording FPD for all events Add new AND/OR terms and FPD triggers Work towards automated pot insertion Combine shifts with CFT (more in Mike S. talk)

AFE+DFE Integration Most of these items will be discussed in other talks— would like to end up with detailed work list + schedule Key:DONE ISSUES Know how to do I) AFE 1) Adding AFE, Sequencer, and VRB to database (VB+WP) 2) Pile-up tests for TPP (CA+JA) 3) Update FPD_AFE unpacking code (GA) 4) FPD_AFE examine (CA,VB,MS with Abid) 5) AFE+Seq Installation (GG, AFE’s temporarily) 5a) FIX SEQUENCER!! (RR with JA+FB 6) Method for installing 2 nd +3rd TPP's +installation (CA+RR+VB+Russ) 7) Update of AFE firmware for 3rd time (RR with JA,approval) 8) Start commissioning AFE (VB,MS,WP,CM II) DFE 1) Purchase of xilinx chips for first two boards (AB) 2) Construction of 2 DFE board (Jamieson) 3) Testing of DFE boards (RR+MV) 4) DFE firmware1 st draft (RR,MV,WC) 5) fixing DFE speed problem (RR+MV) 6) Testing of DFE boards+firmware in CTS (RR+MV) 7) Installation of 1 st DFE+LVDS cables (RR+MV) 8) DFE Examine/DFEware (RR) 9) Signals through to TM

Trigger Integration III) Luminosity Monitor/Trigger scintillator 1) LM TDC boards 2) LM Virtex boards 3) FPD_LM TDC boards (CM) 4) FPD_LM Virtex boards (CM) 5) LM Firmware (RR+MV?) 6) LM rates in EPICS (VB+V.Sirotenko) 7) FPD trigger from SCR until LM ready (VB) IV) Trigger Managaer 1) Installation of TM components Rob Mccrosky+CM 2) Cables connecting TM+3rd floor VB+Tom Diehl 3) First FPD multiplicity triggers 4) TM Firmware V) Phase II 1) 3 more TPP boards (4 th +5 th ) +spasre cut+stuffed (RR with Bob Jones) 2) Test new TPP boards (RR) 3) Install 4 th +5th TPP boards+AFE boards 4) Purchase 3 rd DFE board chips+install 5) Update TM firmware

Goals for 2003 Data taking with integrated Phase I Add FPD triggers to global list Complete funding and implementation of Phase II Preliminary results on several physics topics Would like to produce a detailed list in all areas: detector, software, PID, physics

Steps Needed for Physics Partial list of steps needed to get to physics quality data: Commission AFE’s Include trigger scintillator information/ basic and/or terms Alignment of FPD FPD database Activate FPD_Reco Halo understanding, reduction, and rejection FPD info in DST’s and Thumbnails Propose some reorganization to address some of these issues. 1)Alignment Task Force to address alignment, calibration, folding in accelerator information 2)Halo Task Force to propose studies for reducing halo and maximizing acceptance

How to apply accelerator information to improve beam position measurement A/S pedestal fluctuations, need to evaluate level of problem, develop hot and dead channel list Decoupling LMB from calorimeter …what is on your list? Random FPD Issues

Vacuum Leak Pilot Error Controlled Lines On Controlled Lines Bypassed Controlled Access Smoke Alarms Helium Limit Switches Sequencer TPP Discussion of Items from FPD-Probs Folder

Preparation forPhase II Requirements: About $90,000 primarily for MAPMT for 6 more detectors, test MAPMT, install new detectors Upgraded 12V power supplies to accommodate 14 A/S boards per quadrupole castle (A/S boards are in place) 2 more AFE/TPP boards (TPP boards and components exist but not yet stuffed), solve mechanical installation issues One more DFE board (need to purchase chips, stuff board) Some short cables from detector to A/S need to be repaired and tested Replace A2I LVDT Debug A1O IIB Purchase spares for critical systems Any cable issues?

MRI for Phase II ItemCost Graduate Student$49,000 Equipment$92,000 Indirect Cost$36,000 Miscellaneous$2,000 Total$179,000 NSF$125,000 Match$54,000 EquipmentCost MAPMT (56)$73,000 PMT (10)$6,400 LVDT (3)$2,200 Drivers/motors(3)$2,800 Xilinx chips$2,500 LV power$4,600 Total$92,000 Submitted with NIU, should hear about mid-summer (50%?)

Elastic Data t distribution Before alignment After alignment Gaussian fit

Timing is Everything We identify bunch structure of both proton and antiproton beam We can reject proton halo at dipoles using TDC timing CDF does not have this capability D1 TDC D2 TDC pbar p

Lots of progress Lots still to do Lets get to the physics Conclusions