MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
MICE-SciFi team, 14 October 2003 SciFi: progress report Progress: All stations shipped to FNAL … … assembly in progress Measurements: Effect of radiated.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
Beam Position Monitors MICE CM Harbin January, 2009.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
February 8 th, 2001 Status Report: SciFi for MICE Edward McKigney Imperial College London.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Main Injector at Fermilab. Silicon Vertex Tracker Integrated system of barrels and disks ~ 800k total channels.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Cost of a Large Solid Scintillator Detector Jeff Nelson Fermilab.
MICE Berkeley, Oct 2002 MICE Spectrometer Design Proposed Tracker Implementations A. Bross Fermilab.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
Don Lincoln, Fermi National Accelerator Laboratory, Instr’99, November 1999 Characterization and Performance of Visible Light Photon Counters (VLPCs)
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
DØ Central Tracker Replaced with New Scintillating Fiber Tracker and Silicon Vertex Detector The DØ Central Detector Upgrade The DØ Detector is a 5000.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
UPDATE ON THE FORWARD PROTON DETECTOR Gilvan Alves Lafex/CBPF Introduction Accelerator Roman Pots Detector Future Plans April 1, 1998 (no kidding)
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
06 FEB th ACFA Development of fine strip scintillator with extrusion technique SungHyun Chang, DongHee Kim, Jun Suhk Suh, Youngdo Oh, Daejung Kong,
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Prototype Assemblying, SiPM Characterization and QC
The E835 SCI-FI Detector In Ferrara It has been built a scintillating fibers detector for the tracking system of exp. E835 (Charmonium spectroscopy) a.
Presentation transcript:

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE A. Bross Fermilab

MICE Collaboration MTG IIT – Feb 2002 Fiber Tracker Option for MICE  In its simplest implementation, a FT for MICE could consist of two upstream and two downstream x-y tracking planes (assumes no or low background!) u-v-t option gives more redundancy  With 500 micron round fiber and a fiber doublet structure (detail later) – 30 cm active width u 600 fibers/layer X 2 layers/doublet X 2/3 measurements (x&y or u-v-t) X 2 (stations) X 2 (up/downstream) yields s 9600 channels (x-y) s 14,400 channels (u-v-t)  Expect  m point-set resolution extrapolated from D0 results (90 mm) with 835  m fiber  This would require D0-type VLPC cassettes u Basically all D0 spares  However, IF BACKGROUNDS ARE LOW – 4:1 multiplexing possible with 1 mm D0 pixel  Tremendous Premium in lowering backgrounds

MICE Collaboration MTG IIT – Feb 2002 D0 Central Fiber Tracker  8 layers u Outer 6 s 2.52 m u Inner 2 s 1.66 m  r -.2 to.51 m  Axial readout to south  VLPC Readout u 77,000 channels  Waveguide system u m u “Pipes” light from detector to VLPCs

MICE Collaboration MTG IIT – Feb 2002 Central Fiber Tracker Channel Mirror Scintillating Fiber Optical connector Waveguide VLPC cassette Electronics Cryostat

MICE Collaboration MTG IIT – Feb 2002 Scintillating Fiber Ribbons  Interlocking doublet  835  m 3HF scintillating fiber u Fluorescence 525 nm (peak) to 610 nm  Grooved substrate - machined Delrin  Pitch between 915 and 990  m  Substrate put into curved backbone u Fibers glued together with polyurethane adhesive  Ribbons is then QC’ed using scanning X-ray source  Technique is very fast  All MICE planes require  4 MM effort + Tooling

MICE Collaboration MTG IIT – Feb 2002 CFT Tracker Mechanical Global precision » 33  m (Measured vs Desired)

MICE Collaboration MTG IIT – Feb 2002 Fiber Tracker Status

MICE Collaboration MTG IIT – Feb 2002  Waveguide bundles consist of 256 fibers in light-tight nylon sheath u Curved connector (256 ch.) at detector u ch. Connector at cassette end Waveguide Bundle Fabrication and Routing

MICE Collaboration MTG IIT – Feb 2002 CFT Waveguide Routing  Routing, strain relief, etc for CFT (+CPS)

MICE Collaboration MTG IIT – Feb 2002 Fiber Tracker Status  South (Axial) side complete

MICE Collaboration MTG IIT – Feb 2002 CFT - Readout System  VLPC (Visible Light Photon Counter) u Cryogenic APD 9K  Characterization/test/s ort Cassette Assignment u As shown

MICE Collaboration MTG IIT – Feb 2002 VLPCs  VLPC  HISTE VI  High QE  80%  Low noise <5X10 4 Hz  1.0 pe) u High Rate capability s >40 MHz u High production yield   70% (vs. 27% projected)

MICE Collaboration MTG IIT – Feb Channel VLPC Cassettes  Engineering Design u 8 – 128 channel modules u Cassette carries two 512 ch readout boards s Front-end amp/discriminator s Analog – SVX IIe 3’3’

MICE Collaboration MTG IIT – Feb 2002 CFT - Readout III  Cassette Performance u Noise low u Good uniformity

MICE Collaboration MTG IIT – Feb 2002 The VLPC Cryostats  The VLPC cryostats at DØ accommodate up to 102 cassettes.  The full complement of 99 cassettes necessary to instrument D0 are installed on the platform.

MICE Collaboration MTG IIT – Feb 2002 CFT: System Performance Read-out Platform: Waveguides and VLPCs Pulse Height ~14.5 pe Abid Patwa Como-Italy 2001

MICE Collaboration MTG IIT – Feb 2002 Lab 3 CRT (Singlet) Light Yield Lab 3 CRT Light Yield Summary Covers Waveguide lengths m

MICE Collaboration MTG IIT – Feb 2002 First Events of Run II  Tracking in the CFT is working although we still have a long way to go to fully optimize u Alignment u VLPC operating point optimization u Threshold setting u Etc….

MICE Collaboration MTG IIT – Feb 2002 MICE Fiber Tracker  Could envision a single VLPC cryostat reading out both up and downstream spectrometers u If multiplexing was an option s D0 test cryostat can hold required number of channels  Waveguide length about 5 m u Yield with VLPCs   [exp(-5/8)]/[exp(-11.4/8)]X7  pe  However u This assumes multiplexing s 0.5 mm scintillating fiber coupled to mm waveguide fiber –Could use 1 mm fiber also and get small improvement VLPC Cryostat

MICE Collaboration MTG IIT – Feb 2002 MICE Fiber Tracker  Conventional FT using MAPMT  With same length of readout fiber u If waveguides are used   430 nm = 1300 dB/km (1/e = 3.4m)   525  nm = 450 dB/km (1/e = 9.6m) –D0 measured f p = 525 nm u QE = 20% u Yield = s 16 X 20/80 X exp(-5/3.4)/exp(-5/8)   2 pe  Effective tracking can likely be 2 pe, but would be more difficult u Depends on backgrounds u Minimum acceptable waveguide length Attenuation vs. wavelength of Kuraray clear fiber 3 HF Conventional Blue

MICE Collaboration MTG IIT – Feb 2002 Conclusions  A Fiber tracker is an attractive option for MICE u Material presented to beam acceptable s As small as 0.15% RL per doublet (smaller if can multiplex – channel count)  Excellent resolution (<50  m)  High light yield  efficient tracking possible  VLPC (or other SS photodetector) has major advantage vz a vz light yield, but MAPMT can likely be made to work  If backgrounds can be kept low, multiplexing can reduce channel count