European capacity building initiativeecbi The current status of AWG-LCA and KP negotiations Liberal Seburikoko european capacity building initiative initiative.

Slides:



Advertisements
Similar presentations
European capacity building initiativeecbi Equity and Legal form european capacity building initiative initiative européenne de renforcement des capacités.
Advertisements

European capacity building initiativeecbi The 2015 Paris Agreement General Architecture 2014 Oxford Fellowship european capacity building initiative initiative.
European capacity building initiativeecbi Post-2012 Scenarios Elements of the BASIC Sao Paoulo Proposal Benito Müller european capacity building initiative.
Barcelona 4 weeks before:. Headlines 1  Time is short, no guarantee for success: Fully- fledged treaty put in question  US looks for exceptional treatment.
Moving forward from Copenhagen: avenues for cooperation and action Yvo de Boer Executive Secretary UNFCCC.
The state of negotiations on the Kyoto Protocol’s Second Commitment Period Workshop of the Lead Coordinators of the African Group of Negotiators on Climate.
European capacity building initiativeecbi The 2015 Paris Agreement Adaptation 2014 Fellowship european capacity building initiative initiative européenne.
5/16/ Identifying Outcomes that Promote the Interests of Developing Countries at COP18 Vicente Paolo Yu III ACP House, Brussels 7 November 2012.
Kyoto Protocol and Beyond
ECBI Regional Workshop 2008 Prepared by FIELD, London
European capacity building initiativeecbi Title: Towards an African roadmap to Durban Sub-title: The African Position for the 17 th COP of the UNFCCC in.
European capacity building initiativeecbi PERSPECTIVES From ADP 2.2 priorities for warsaw priorities for warsaw Kishan Kumarsingh Head, Multilateral Environmental.
European capacity building initiativeecbi Loss and Damage Legal and Scientific aspects Raj Bavishi (Legal Response Initiative) Professor Myles Allen (University.
European capacity building initiativeecbi Legal options for addressing a gap between Kyoto Protocol commitment periods and implications of a gap Achala.
European capacity building initiativeecbi Durban Platform for Enhanced Action Options for Engagement Seth Osafo, Legal Adviser to African Group of Negotiators.
European capacity building initiativeecbi What is for LDCs in the Adaptation negotiations? By: Sumaya Ahmed Zakieldeen (CLACC Fellow, SECS Sudan & Assistant.
European capacity building initiativeecbi Title: LDC strategy in the UNFCCC negotiations Author: Pa Ousman Jarju european capacity building initiative.
UNECA Seventh African Development Forum October 2010 UNCC, Addis Ababa, Ethiopia Dan Bondi Ogolla Chief Legal Adviser UNFCCC secretariat Climate.
European capacity building initiativeecbi ADP WS2: Pre-2020 Ambition Overview of key issues, linkages to Adaptation and Finance SEYNI NAFO - AFRICA Group.
European capacity building initiativeecbi Plan C Switching track to the Kyoto Protocol Benito Müller, Oxford Institute for Energy Studies european capacity.
European capacity building initiativeecbi FELLOWS VIEWS ON TIMEFRAMES AND CYCLES european capacity building initiative initiative européenne de renforcement.
European capacity building initiativeecbi Climate Finance 2011 A Stocktaking Benito Müller Director ecbi european capacity building initiative initiative.
RECENT DEVELOPMENTS ON THE WORK OF SUBSIDIARY BODIES: ACHIEVEMENTS AND CHALLENGES NATIONAL CONSULTATIVE SEMINAR ON CLIMATE CHANGE NOVEMBER 2011.
European capacity building initiativeecbi Legal issues and options for COP 17 Dr. Achala Chandani Abeysinghe International Institute for Environment and.
1 International negotiations on post 2012 regime: general framework and the key questions Ruta Bubniene, Programme officer Reporting, Data and Analysis.
Margaret Mukahanana Sangarwe. SHARED VISION FOR LONG TERM COOPERATIVE ACTION There was a shared vision in paragraphs 1-7 of the Cancun Decision The Cancun.
DEVELOPMENTS IN THE UNFCCC NEGOTIATIONS 11 August 2011.
Paul Desanker Financial and Technical Support UNFCCC secretariat Framework for Capacity- building in Developing Countries Expert Workshop.
European capacity building initiativeecbi How do we? Finance in the 2015 Agreement european capacity building initiative initiative européenne de renforcement.
European capacity building initiativeecbi Reducing Emissions from Deforestation in Developing Countries Fellows´ Recommendations, Oxford Seminar 2007 european.
European capacity building initiativeecbi Current negotiations on mitigation commitments by developed countries and mitigation actions by developing countries.
Markets & Mechanisms Developments inside and outside the UNFCCC negotiations. Building and Urban Methodologies Workshop UNFCCC, Bonn, March 2014.
European capacity building initiativeecbi 1 Finance and Adaptation Finance Reflections from the Oxford Fellowship Colloquium Oxford Seminar, 3-5 September.
Regional perspectives under the Clean Development Mechanism Jose Domingos Gonzalez Miguez, Ministry of Science and Technology, Brazil.
European capacity building initiativeecbi Adaptation in the Paris Agreement Ambition and Permanence for the Cancun Adaptation Framework Juan P Hoffmaister.
AFRICAN CLIMATE PLATFORM TO COPENHAGEN KEY MESSAGES TO MINISTERS AND HEADS OF STATES AND GOVERNEMENTS (Africa’s Common Negotiation Position) Adopted in.
1 Marcela Main S. UNFCCC secretariat Bali Road Map: a new negotiation process.
European capacity building initiativeecbi Mitigation GHG emissions What is new in the UNFCCC negotiations? Sandra FREITAS european capacity building initiative.
European capacity building initiativeecbi ECBI fellows’ views and questions on legal issues european capacity building initiative initiative européenne.
European capacity building initiativeecbi Adaptation in the 2015 Agreement Operationalising the Global Goal for Adaptation Xolisa Ngwadla Council for Scientific.
Summary of COP 15 and Copenhagen Accord Zsuzsanna Ivanyi 10 March, 2010 Szentendre, Hungary.
European capacity building initiativeecbi ADAPTATION FUNDING Ambassador Enele Sopoaga european capacity building initiative initiative européenne de renforcement.
European capacity building initiativeecbi Some Thoughts on Process Benito Müller european capacity building initiative initiative européenne de renforcement.
European capacity building initiativeecbi Update on the work of the Transitional Committee for the Design of the Green Climate Fund Carol Mwape european.
ASSESSMENT OF THE OUTCOME OF THE UNFCCC COP15 & CMP5, HELD IN COPENHAGEN, DEC March 2010.
European capacity building initiativeecbi Technology transfer in the 2015 Agreement Spencer Thomas european capacity building initiative initiative européenne.
European capacity building initiativeecbi Reforming the Financial Mechanism A General Blueprint 2010 ecbi Fewllowship european capacity building initiative.
European capacity building initiativeecbi The 2015 Paris Agreement 4. Adaptation Dr. Achala Abeysinghe Head, ecbi Training and Support Programme Team Leader,
European capacity building initiativeecbi Key Issues of the Framework for Various Approaches Potential links with NAMAs, NAPAs and REDD+ Dr. Daniel V.
European capacity building initiativeecbi Climate Finance 2011 A Stocktaking Benito Müller Director ecbi european capacity building initiative initiative.
European capacity building initiativeecbi The Importance of Involving Stakeholders in the Green Climate Fund LDC/ecbi Reception for the Green Climate Fund.
European capacity building initiativeecbi POST-2012 AND FUTURE ACTION Discussions based on the Sao Paulo Proposal for the BASIC project Alejandra Lopez.
European capacity building initiativeecbi ADAPTATION FUNDING Ambassador Enele Sopoaga european capacity building initiative initiative européenne de renforcement.
European capacity building initiativeecbi ECBI fellows’ views and questions on Adaptation european capacity building initiative initiative européenne de.
European capacity building initiativeecbi VIEWS ON TIMEFRAMES AND CYCLES european capacity building initiative initiative européenne de renforcement des.
REDD+ negotiations and key milestones from Cancun to Durban Geneva, 9 May 2011 Clea Paz-Rivera, UN-REDD Secretariat.
European capacity building initiativeecbi What was expected from COP 15. An analysis of what the parties expected from the conference David Lesolle, Botswana.
European capacity building initiativeecbi Legal Issues: Facilitating Implementation and Compliance Dr. Achala Abeysinghe Principle Researcher/ Team Leader.
European capacity building initiativeecbi ADP WS2: Pre-2020 Ambition Overview of key issues, linkages to Adaptation and Finance SEYNI NAFO - european capacity.
ecbi Possible Post 2012 CDM Key Challenges
ecbi european capacity building initiative
ecbi Mitigation Subhi Barakat Legal Response Initiative (LRI)
ecbi european capacity building initiative Climate Change Finance
ecbi european capacity building initiative
Information on the work of the AWG-KP in accordance with decision 4/CMP.3 Claudio Forner UNFCCC secretariat 8 consultants.
2/16/2019   Identifying Outcomes that Promote the Interests of Developing Countries at COP18 Vicente Paolo Yu III ACP House, Brussels 7 November 2012  
ecbi Transparency and global stocktake Subhi Barakat
Implications of the Cancun Agreement: Solomon Islands Perspective
ecbi european capacity building initiative
ecbi Enhanced Transparency Framework
Presentation transcript:

european capacity building initiativeecbi The current status of AWG-LCA and KP negotiations Liberal Seburikoko european capacity building initiative initiative européenne de renforcement des capacités ecbi Nairobi, 1st March 2010 for sustained capacity building in support of international climate change negotiations pour un renforcement durable des capacités en appui aux négociations internationales sur les changements climatiques

european capacity building initiativeecbi Outline Introductory background Selected AWG-LCA texts Selected AWG-KP texts Conclusion

european capacity building initiativeecbi Introductory background Negotiations on AWG-LCA and AWG-KP stalled for months, with heavily bracketed texts at the beginning of Copenhagen Many outstanding issues had to be forwarded to ministers for consideration and resolution in the form of draft decisions Ministers sidelined these and focused on the Copenhagen Accord

european capacity building initiativeecbi Introductory background (2) COP and CMP decided to extend the mandates of both AWGs There are now 3 documents arising from Copenhagen: –Two reports of the AWGs –Work undertaken by COP15 This keeps alive the documents and the work coming out of the two tracks BUT it is not obvious that these draft decisions would form the basis of future negotiations

european capacity building initiativeecbi Introductory background (3) How to achieve a LBA based on the present work of both AWGs is a question of political will to ensure adoption happens at COP 16 and CMP 6 in Mexico KP amendments were only discussed in plenary – no decision taken by the COP/CMP President How these amendments will develop in 2010 will be important to consider as this may require amendments to the Kyoto Protocol

european capacity building initiativeecbi Focus on AWG-LCA: Different drafting groups set up by LCA Chair achieved different levels of progress ( e.g. adaptation, REDD and technology transfer were at an advanced state of maturity than shared vision and mitigation) Contact Group on LCA neither concluded its work nor reported back to the plenary meeting of the COP The draft decisions do not prejudge the legal form of the final agreed outcome Reference to a LBA outcome of further negotiations under the AWG-LCA by COP 16 was dropped at the very last moment of the high level segment

european capacity building initiativeecbi LCA (2): Shared Vision Temperature target- reference to 350/400ppm removed from draft text Long-term goal – no consensus on 85% and 50% reductions by The former leads to a 75% chance of staying below 2oC whilst the latter relates to a 50% chance only. Peaking – no consensus: “ASAP” and “2015”. Peaking by 2015 is necessary to keep the 1.5oC target feasible Review – language was weakened. It focuses on long-term global goal instead of the adequacy of emission targets. All references to LDCs and SIDS as benchmark were removed. Option for 2015 should be retained and start review in 2013

european capacity building initiativeecbi LCA (3): Mitigation All options remain on the table (including unhelpful ones) but practically no consensus on any significant mitigation issues. A text of bunker fuels is reintroduced but wholly bracketed 3 areas where consensus was reached: –LDC may prepare Low-emission dev plans, and submit NCs and GHG inventories at their discretion –Principles of establishing a mechanism to record mitigation actions and facilitate matching support –The need to prepare GHG inventory and submit to the COP annually w.e.f 2011 in accordance with existing guidelines

european capacity building initiativeecbi LCA (4): REDD Target for REDD: controversial as many DCs did not want to be bound by the EU proposed target and some linked it to the level of financing for REDD. Scale of REDD and whether it should take place at national or sub-national level divided negotiators. Issues around baseline uncertainties, leakage and scientific uncertainties would arise if REDD was allowed to undertaken sub-national activities Financing: whether REDD should be funded through a carbon market or a fund. MRV: establishing reference emission levels (REDD)or reference levels (REDD+) were not agreed and related to the scope of REDD+ activities. This will continue to be challenging

european capacity building initiativeecbi LCA (5): Adaptation Adaptation is PRIORITY for LDCs and SIDS – BUT Confusion between adaptation to impacts of CC and adaptation impacts of response measures remains. BAP separates the latter from adaptation and places it under mitigation building block (1bvi). There is a huge risk of LDCs and SIDS loosing out with adaptation funds being diverted to rich oil producing countries. Need to support mechanism to address loss and damages (not for response measures) Need to establish priority, simplified, expeditious and direct access to adaptation funding for vulnerable countries Building upon NAPAs is paramount to speed up implementation Adaptation financing must be grant-based, from public sources and must support full project cycle – from design of strategies to implementation

european capacity building initiativeecbi LCA (6): Finance Discussions were inconclusive – as a result the whole text is bracketed. Some of the major issues include: –Establishment of a Finance Board within a transparent system of governance under the guidance of and accountable to the COP –Establishment of a Climate Fund (CF), governed by a Board with equitable and balanced representation and serviced by a Trustee and a Secretariat. The CF to provide simplified, improved and effective (direct) access to financial resources in a timely manner. GEF to be reformed to ensure that it responds more effectively to the needs of developing countries. –Provision of scaled up, predictable, new and additional and adequate funding to developing country Parties for enhanced implementation of the Convention. Private sector financing and other innovative sources of funding would supplement the provision of public financial resources –The question of who will contribute how much remains unresolved

european capacity building initiativeecbi Focus on AWG-KP Developing countries felt that amending Annex B numbers for Annex I was top priority - other issues were not as important. For developed countries, other issues such as LULUCF, mechanisms, methodologies etc were also important. For LDCs - Extending the share of the proceeds to the other flex mechanisms (JI and Emissions trading) were important and required an amendment of the KP. These were not discussed

european capacity building initiativeecbi KP (2): Scale of emission reductions Targets: range of targets for Annex I remains 25-45% by No consensus on level of ambition for aggregate AI reductions Length of commitment period: parties disagreed on 5years ( ) or 8 years ( ) period. An 8-year period would mean much longer time to consider AR5 and consequently delay in responding to the latest science Base year: general agreement on 1990 as base year but some parties preferred having reference years and multiple base years. Surplus AAUs: whether to cap carry-overs or discounting? QELROs: no consensus on translating pledges from AI into QELROs?

european capacity building initiativeecbi KP (3): LULUCF Forest management: no decision on how to account for this in the 2 nd commitment period. Land based approach: i.e. whether or not parties should account for all activities on their lands. This could affect the KP environmental integrity. Most developed countries wanted this off the table but PNG objected. No progress registered. CDM and role of non-permanence: afforestation/reforestation is based on premise that carbon is stored temporarily in forests. There was discussion on revising this and requesting SBSTA to undertake a work programme looking at alternatives.

european capacity building initiativeecbi KP (4): Flexible Mechanisms A number of key issues remained in the text: CCS and nuclear activities under the CDM, and standardised baselines. No consensus on whether or not to forward these to the COP/MOP or to request the SBSTA to develop procedures and modalities for further action. Other issues include: Markets: inclusion of crediting on the basis of NAMAs, extending emission trading to developing countries, establishing new market mechanisms, etc Supplementarity of flex mechs: whether to introduce a cap (e.g. 30%) on the use of flex mechs in achieving A1 QELROs

european capacity building initiativeecbi KP (4): Flex Mechanisms (cont’d) Extending the share of proceeds to Joint Implementation Improving Regional distribution through postponement of the registration fee by parties with fewer than 10 projects or establishing a quota for projects hosted in LDCs, SIDS and African countries

european capacity building initiativeecbi Conclusion: Some pre-requisites for breaking the deadlock : Politics: Vulnerable countries are politically engaged – but not enough alliances to have a more powerful role in the negotiations. This will be paramount in order to breaking the deadlock on many issues Planning and strategy: There is room for improvement here: “failure to plan is planning for failure”. Need Persistence and patience: need to gear up for intense technical preparation on some key issues including methodological issues (REDD, MRV), finance (exploration of innovative sources by the newly established high-level panel)

european capacity building initiativeecbi THANK YOU