U.S. Army Corps of Engineers - Levee Safety Program Engineer Circular Development US Army Corps of Engineers BUILDING STRONG ® Michael Bart, P. E. Chief,

Slides:



Advertisements
Similar presentations
How Will it Help Me Do My Job?
Advertisements

Module N° 4 – ICAO SSP framework
Global Congress Global Leadership Vision for Project Management.
The Role of Levees in the National Flood Risk Management Program Pete Rabbon June 19, 2008 Hazards Caucus Alliance.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Richard Hibbert RSRL Quality, Assessment and Management Systems Manager Process management Requirements in IAEA Standards and Guides.
Software Architecture – Centric Methods and Agile Development by Craig Castaneda.
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
ISO 17799: Standard for Security Ellie Myler & George Broadbent, The Information Management Journal, Nov/Dec ‘06 Presented by Bhavana Reshaboina.
PEER Summative Meeting 13 June 2007 Implementation, Adoption, and Stakeholder Perspectives Peter J. May University of Washington.
Engineer Circular Requests to Alter USACE Projects
NATIONAL LEVEE DATABASE INVENTORY/INFORMATION PROGRAM.
Dam Safety Program Management and Organization
US Army Corps of Engineers BUILDING STRONG ® Missouri River Flood Task Force (MRFTF) Concept Briefing
MAFMC 5-Year Strategic Plan Public Comments August 14, 2013.
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
What is Business Analysis Planning & Monitoring?
USACE Levee Safety Program Presented by Tammy Conforti ASFPM Conference May 2008.
Value Engineering at FHWA
Risk analysis (UVER) Luigi Guerci. Public Investment Verification Unit (UVER) The organisational principles at the foundation of the management and control.
Scott Shewbridge, PhD, PE, GE, CFM
US Army Corps of Engineers BUILDING STRONG ® Prioritizing Investments within the USACE Levee Safety Program Process and Methodology Overview Jason Needham,
US Army Corps of Engineers BUILDING STRONG ® Flood Risk Management Approaches As Being Practiced in Japan, Netherlands, United Kingdom, and United States.
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
US Army Corps of Engineers BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Armoring Brief Team New Orleans U.S.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Integrating Evaluation into the Design of the Minnesota Demonstration Project Paint Product Stewardship Initiative St. Paul, MN May 1, 2008 Matt Keene,
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Ajaz S. Hussain, Ph.D. Deputy Director Office of Pharmaceutical Science, CDER, FDA ACPS Subcommittee on Manufacturing Science: Identification and Prioritization.
IRRPCC Meeting Albuquerque, NM November 8,  Clarification needed on applicability of these roads into the IRR Inventory  Assignment given to IRRPCC.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
US Army Corps of Engineers BUILDING STRONG ® PLANNING GUIDANCE Planning Principles & Procedures – FY11.
NDIA SE Division – 2014 Plan - Summary February 12, NDIA Systems Engineering Division 2014 Plan Summary - Annual Planning Meeting December 11-12,
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
US Army Corps of Engineers BUILDING STRONG ® Model Certification Jodi Staebell Operational Director, Ecosystem Restoration Planning Center of Expertise.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Planning for Non-Routine Activities
St. Louis – February 25-28, 2008 Extremely Successful -Close to 500 Participants  Jointly Sponsored by ASFPM & NASMA – Supported by Corps and FEMA High.
MBIE Fire Programme 2015/16 Michael Belsham – Fire Engineer.
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
Integrating Evaluation into the Design of the Minnesota Demonstration Project Paint Product Stewardship Initiative St. Paul, MN May 1, 2008 Matt Keene,
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
David Moser USACE Chief Economist
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® SMART PLANNING TO SUPPORT FLOOD RISK MANAGEMENT USACE Flood Risk Management and Silver Jackets.
The CNCAN Knowledge Portal TM on the Use of GSAN and SAET Programme November 2015 ROMANIA National Commission for Nuclear Activities Control.
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
Middle Fork Project Relicensing Process Plan April 25, 2006.
US Army Corps of Engineers BUILDING STRONG ® Jody Fischer P.E. Levee Safety Program Manager Los Angeles District U.S. Army Corps of Engineers 14 December.
Regional Sediment Management Policy and Implementation Workshop April, 2009.
ZeroWIN 3 rd general meeting Southampton, 5-8 July 2010.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
US Army Corps of Engineers BUILDING STRONG ® Levee Safety Policies Supporting a Sustainable Flood Risk Management Program Eric C. Halpin, PE Special Assistant.
US Army corps of engineers Levee Safety and 408 Update
Recommendations for an Early Childhood Suspension and Expulsion Policy
Margin Management Configuration Management Benchmarking Group
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
Revolutionize USACE Civil Works
Engineering Processes
DOE Office of Security Policy, AU-51 July 2018
National Commission for Nuclear Activities Control
Presentation transcript:

U.S. Army Corps of Engineers - Levee Safety Program Engineer Circular Development US Army Corps of Engineers BUILDING STRONG ® Michael Bart, P. E. Chief, Engineering & Construction Division St. Paul District Levee Safety Policy & Procedures Team May 2012 Levee Safety Portfolio Risk Management

BUILDING STRONG ® Topics  USACE Levee Safety Principles  Portfolio Risk Management  Why Use Portfolio Management  Routine and Non-Routine Activities  Levee Safety Action Classification  National Levee Database 2

BUILDING STRONG ®  Hold life safety paramount and reduce economic, and environmental risk  Open and transparent communication  Decisions will be risk informed  Shared responsibility and accountability for risk management  Systems approach  Periodic and continuous activities Guiding Principles 3

BUILDING STRONG ® Risk Defined  Risk is the combination of the likelihood and the consequences of inundation of the leveed area.  Emphasis is on life-safety in concert with economic and environmental inundation risk. 4

BUILDING STRONG ® Utilize a Systems Approach  Physical levee systems  Operational and control processes  Social, ecological, and economic Riversburg Greentown Metroville This diagram shows three levee systems wherein each reduces inundation risk for a separable floodplain. Ownership boundaries and construction sequence and authorization limits are not relevant. 5

BUILDING STRONG ®  Levee Safety Engineer Circular  Consolidate Levee Safety policy and guidance into single document.  Internal & External Stakeholder Involvement ► Webinars ► Workshop(s) ► Draft documents and Feedback USACE Engineer Circular Regulation

BUILDING STRONG ® Malfunction of Levee System Components Overtopping with Breach Breach Prior to Overtopping Overtopping Without Breach Inundation Scenarios 7

BUILDING STRONG ® Portfolio Risk Management  USACE proposes a risk-informed portfolio management process, continuously applied to all levee systems in the USACE inventory  Prompts extensive stakeholder involvement in development and implementation of risk management strategies  Assists in communicating urgency of actions commensurate with the level of inundation risk  Used to prioritize activities 8

BUILDING STRONG ® Why Use a Portfolio Risk Management Process for Levees?  Fulfill All USACE Authorized Responsibilities  Consistent USACE Response: ► Characterization ► Communication ► Action  Better Decisions by USACE and Stakeholders ► Prioritized Investments ► Stronger Justifications ► Improved coordination with stakeholder decisions 9

BUILDING STRONG ® Slide 10

BUILDING STRONG ® Purpose of Routine Activities  Periodic and continuous – Life Safety  Verify/validate O&M responsibilities & actions through inspections  Assess Levee System risks through application of the Levee Screening Tool (LST)  Assign Levee Safety Action Classification for follow-on activities 11

BUILDING STRONG ® What are the Routine Activities?  Routine Operation & Maintenance  Inspections: Routine, Periodic & Special  Screening  Levee Safety Action Classification 12

BUILDING STRONG ® Levee Safety Portfolio Risk Management Process Routine Activities (Green) 13

BUILDING STRONG ® Levee Safety Portfolio Risk Management Process Non-Routine Activities (Shaded) 14

BUILDING STRONG ® Levee Safety Action Classification System  Transition from Routine to Non-Routine  Reflects urgency of action  Depicts range of risk ► combination of likelihood and consequences of inundation with an emphasis on life-safety  Provides consistent and systematic guidelines for actions commensurate with the risk 15

BUILDING STRONG ®

17

BUILDING STRONG ® 18 Levee Safety Portfolio Risk Management Process & National Levee Database NLD

BUILDING STRONG ® National Levee Database Objectives  Simple web-based user interface to access data.  Levee maps/data readily visible to all stakeholders.  Safeguarding critical information.  Data and reports from many sources can be stored in NLD.  Nationally consistent, state of the art system 19

BUILDING STRONG ® Feedback  Webinars (Dec 2010 – Mar 2011)  Workshops (May, June, August, 2011)  1,500+ comments received  Analyzing, dissecting, considering….into draft documents 5

BUILDING STRONG ® Engineer Circular Next Steps  Assembling draft EC – Summer/Fall 2012  Series of Internal Briefs – Summer/Fall 2012  External Briefs - FEMA – Summer/Fall 2012  Publish Draft EC – Late 2012  Comment Period – Late 2012/Early 2013  Conduct Internal/External Detailed Webinars – Late 2012/Early 2013  Resolution of Comments – 2013  External Peer Review 21

BUILDING STRONG ® Without Further Adieu  Maria Wegner-Johnson ► Headquarters USACE, ► Planning Community of Practice