RHIC Run 12 17 th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12.

Slides:



Advertisements
Similar presentations
Amazing Words A Big Fish for Max. Monday chore – a job chore – a job cooperation – working together cooperation – working together household – your household.
Advertisements

Computer Security ISO / OHSAS Registration Photo of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
NSF Audit Accelerator Safety Envelopes Picture of the Week E. Lessard Collider-Accelerator Department Take 5 for Safety.
Maintenance and Accelerator Support RHIC Run 12. RHIC species change completed: Major works in RHIC: Major works in RHIC: Power supply reconfigure (DO.
SPU STAFF TRAINING Sripatum Institute of Language and Cultures Lesson 9: Cancelling an appointment.
Outages During the Run Coping with the Power Company August 9, 2012.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow Major efforts RHIC: Major efforts RHIC: Access hrs. Access hrs. RA.
BA271 Week 9 Lecture Using forms in Access. Status Report … Review where we are … –Midterm – Graded! –Final websites – Graded! –Access #1 – Graded! –Access.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
HAPPY MONDAY!! Welcome to Marketing, attracting and keeping customers week. As one of the Growth Voucher advice themes, we wanted to take some time out.
Maintenance and Accelerator Support RHIC Run 12. Accelerator Status: Complex is running for Physics. Complex is running for Physics. Checkout for NSRL.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Machine - Experiments January 12, 2005 Machine status.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Accelerator Support and Maintenance Run 14. Maintenance Tomorrow AGS hrs CA Specific Jobs only. AGS hrs CA Specific Jobs only. RHIC.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run th Time Meeting Tuesday 5 June 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 06/05/2012 Time Meeting, Run 12.
Maintenance and Accelerator Support RHIC Start Up 12.
Maintenance and Accelerator Support RHIC StartUp10.
Take 5 for Safety E. Lessard June 2, Conduct of Operations Agreement 2  An updated set of practices for mission success and safe operation of large.
Maintenance and Accelerator Support RHIC Start Up 12.
May 4, 2010 EBIS ARR Jim Alessi May 4- 7, 2010 Pre-commissioning and Commissioning.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
RHIC Run 12 7 th Time Meeting 21 February 2012 WELCOME Safety SP's slide Experiments and Machine, status 1 02/21/2012 Time Meeting, Run 12.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
AGS/Booster Status March 11, 2014 Time Meeting Haixin Huang.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Maintenance Nov 28, Accelerator Access LINAC will remain on RA. It is not yet running. LINAC will remain on RA. It is not yet running. Booster-
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
Q2.W1 Math 9Monday 10/19/15 Today : o Welcome, Read-a-thon Schedule o Warm-ups o Good things! o Notes and OTL o Lesson 3.3: Interpreting Rate of Change.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Agenda Safety Schedule Machine and system reports 2/26/2016G. Robert-Demolaize, Time Meeting1.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Agenda Safety Schedule Machine and system reports 2/29/2016G. Robert-Demolaize, Time Meeting1.
Restarting Cooling, Ventilation for PS and SPS. PS /SPS days 2006.
 Safety  Schedule: Past, Present and Future  RHIC and Experiments Reports  Machine and Systems Reports  AOB.
Week #27Monday, March 4th, 2014 Due: This week will end with our 3 rd quarter memory review test on the following verses: Romans 5:3Romans 8:28 1 Corinthians.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Accelerator Support and Maintenance Startup for Run 13.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
1 AGS RSVP Review 4-5 November 2004 Management Issues Philip Pile Collider-Accelerator Department 4 Feb 2004.
8 th Grade Language Arts Monday, October 5, 2015 No DOL this week Far North Begin essay assessment- “Charles” Must be submitted by Friday at 9 P.M.
Accelerator Support and Maintenance Startup13. Access LIPA work Friday LIPA taking feed for Booster MMPS down for emergency repair. LIPA taking feed for.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Time Meeting May 14, 2013 Agenda Safety Schedule Machine and system reports 05/14/2013Time Meeting, Run 131.
Preinjectors Status D. Raparia March 22, 2016 Time Meeting.
Preinjectors Status D. Raparia April 26, 2016 Time Meeting.
Time Meeting April 2, 2013 Agenda Safety Schedule Machine and system reports 04/02/2013Time Meeting, Run 131.
Maintenance and Efficiency
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Run16 Y. Akiba.
HELLO THERE. THIS IS A TEST SLIDE SLIDE NUMBER 1.
Hello welcome back blah blah blah
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

RHIC Run th Time Meeting Tuesday 8 May 2012 WELCOME ! Safety first SP's slide Experiments and Machines, status 1 05/08/2012 Time Meeting, Run 12

Safety Training Ed Lessard 2 05/08/2012 Time Meeting, Run 12

SP's Slide - UxU Physics at RHIC is running steadily, substantial boost from stochastic cooling now, * Uranium run ends in 8 days – Wed. 16 Th (possibly a little earlier ?) * - NSRL is running steadily. NRO irradiations this week, with a variety of ions, Xe, Kr, Ta, Au, from EBIS or Tandem, - BLIP is running steadily. Program for the coming week : - Carry on delivering stores to Physics. - Next Maintenance Day is tomorrow Wednesday 9 May. Activities will be scheduled to maximize RHIC running, accouting for plans on the LIPA side : * shut-off of the 69kV Booster feed line tomorrow at 0630, 6 to 16 hrs work needed by LIPA, * A store for Physics will be put up at ~0500 and extended to

Experiments and Machine, Status RHICYun Luo Kip Gardner STARAlex Schmah PHENIXXiaochun He RCFMichael Ernst (FM) BLIPLen Mausner Operation Peter Ingrassia Maintenance Paul Sampson 4 05/08/2012 Time Meeting, Run 12

5 Next Time Meeting Tuesday 15 May 1:30 Snyder MANY THANKS FOR YOUR PARTICIPATION AND FOR YOUR CONTRIBUTIONS MANY THANKS FOR YOUR PARTICIPATION AND FOR YOUR CONTRIBUTIONS 05/08/2012 Time Meeting, Run 12