The Project Audit What and why Benefits of a project audit

Slides:



Advertisements
Similar presentations
Project Management: A Managerial Approach
Advertisements

Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Chapter 2 The Analyst as a Project Manager
Evaluation and Reporting ENTC 4060 Project Scheduling.
Project Management.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
IS Audit Function Knowledge
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
The Analyst as a Project Manager
Chapter 3: The Project Management Process Groups
Chapter 14. To understand the process of project audit To recognize the value of an audit to project management To determine when to terminate a project.
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
Advanced Project Management Project Plan Templates
Fundamentals of ISO.
Key changes and transition process
9 Closing the Project Teaching Strategies
Audit of Public Procurement
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Systems Analysis – ITEC 3155 Feasibility Analysis
Performance Management # 1.1. Employee Performance What is expected of an employee in terms of -Quantity of output -Quality of output -With specification.
Project Management: A Managerial Approach
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 12 – Project Auditing.
Systems Analysis Lecture 2 Analysing the Business Case Feasibility Scope 1 BTEC HNC Systems Support Castle College 2007/8.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Welcome to Session 3 – Project Management Process Overview
Lecture 3 Title: Information Technology Project Methodology By: Mr Hashem Alaidaros MIS 434.
1 Advanced Project Management Project Plan Templates Ghazala Amin.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Introducing Project Management Update December 2011.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Project Management Starting out. What makes projects different to BAU (Business as Usual)?  Change - Projects are the means by which we introduce change.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
PPTTEST 12/26/ :41 1 IT Ron Williams Information Technology Management Project Management.
Copyright 2009 John Wiley & Sons, Inc. Chapter 12 Project Auditing.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
INEN261: Chapter # 12 Project Auditing Presented by: Jasim Alnahas.
TOTAL QUALITY MANAGEMENT
Chapter 12 Auditing Projects.
Copyright 2012 John Wiley & Sons, Inc. Chapter 12 Project Auditing.
What is project management?
Project Management.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Advanced Project Management Project Planning Phase Ghazala Amin.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Strategic Information Initiatives
Managing the Project Lifecycle
Systems Analysis and Design in a Changing World, 4th Edition
So where in ISO is Process?
Evaluating and Terminating the Project
MOSH Leading Practices Adoption System
Ch. 14 – Project Audit & Closure
Project Management Process Groups
Chapter 12 Project Auditing.
Presentation transcript:

The Project Audit What and why Benefits of a project audit Judging success and failure Determining project objectives Contents and format of a project audit Project Audit Life Cycle Responsibilities of an auditor

What is a Project Audit, & Why Is It Done? A formal inquiry into any or all aspects of a project Possible reasons: Revalidate the business feasibility of the project Reassure top management Confirm readiness to move to next phase of project Investigate specific problems

Some Specific Benefits of a Well-Done Project Audit Identify problems earlier Clarify performance/cost/schedule relationships Improve project performance Identify future opportunities Evaluate performance of project team Reduce costs Inform client of project status/prospects Reconfirm feasibility of/commitment to project

Judging a Project’s Success To what extent is a project meeting its objectives? Efficiency: Does the project use resources in a cost-effective manner? Cost efficiency? Schedule efficiency? Customer impact/satisfaction: Quality, timeliness, customer satisfaction, meeting/exceeding specifications. Business success: Meeting expectations in ROI, market share, cash flow Future potential: Will project lead to future business prospects?

The Difference Between Project Success & Failure Audits of 110 projects over 11 years reveal four basic differences between success and failure Objectivity in design, scope, cost and schedule Experienced people throughout project Authority commensurate with responsibility Clear responsibility and accountability

Determining What the Project Objectives Really Are Explicit objectives are easy to find Cost, schedule, performance specs Profit targets Ancillary objectives are not Examples include retaining employees, maintaining a customer, getting a “foot in the door,” developing a new capability, blocking a rival

Ancillary Objectives are Important, but Often Obscure If an audit ignores ancillary objectives, it will draw an incomplete picture But people tend to disguise ancillary objectives. Why? If not explicit, how can it be judged a failure? People and teams may have their own goals and priorities The stronger the project culture, the greater the suspicion toward outsiders, e.g., auditors

Costs of Project Audits While audits offer benefits, they aren’t free Some costs are obvious, others less so Salaries of auditors and staff Distraction from project work Before and during the audit Anxiety and morale within the project Cost of outside experts

Timing of the Audit Early audits tend to focus on technical issues, and tend to benefit the project Later audits lean toward cost and schedule, and tend to benefit the parent organization Transfer of lessons learned to other projects

Contents of a Project Audit Format can vary, but six areas should be covered 1. Project status, in all dimensions 2. Future projections 3. Status of crucial tasks 4. Risk assessment 5. Information relevant to other projects 6. Limitations of the audit

A Format for a Project Audit Introduction Including project objectives Also audit assumptions, limitations Current project status Cost Schedule Progress/Earned Value Quality

Format for Project Audit (cont’d) Future Project Status Conclusions and recommendations Critical Management Issues A Pareto approach Risk Management Major threats to project success Appendices

The Project Audit Life-Cycle Like the project itself, the audit has a life cycle Six basic phases: 1. Project audit initiation Focus and scope of audit; assess methodologies, team members required 2. Baseline Definition Determine the standards against which performance will be measured

The Audit Life Cycle (cont’d) 3. Establishment of Audit Database Gathering/organizing pertinent data Focus on what’s necessary 4. Data Analysis The judgment phase Comparison of actuals to standard

The Audit Life Cycle (cont’d) 5. Audit Report Preparation Present findings to PM first Then, prepare final report 6. Audit Termination Review of audit process Disbanding of team

Responsibilities of a Project Auditor As in medicine, “first do no harm” Be truthful, upfront with all parties Maintain objectivity and independence Acknowledge entering biases Project confidentiality Limit contacts to those approved by management

Baseline Marketing Data, Figure 12-2