Review of Detector Solenoid Effect to the Beam Effect on Beam Orbit Effect on Beam Size S.Kuroda(KEK)

Slides:



Advertisements
Similar presentations
Solenoid effects and compensation B. Dalena, D. Swoboda, R. Tomás.
Advertisements

Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
1 4 Oct 05 Optimization of anti-DID for SiD, GLD and LDC A.Seryi October 4, 2005.
January 15, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity December/January vs September/October -Machine studies and instrumentation -Simulation.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Overview of Extraction Line Designs and Issues
CLIC main detector solenoid and anti-solenoid impact B. Dalena, A. Bartalesi, R. Appleby, H. Gerwig, D. Swoboda, M. Modena, D. Schulte, R. Tomás.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting
1 IR with elliptical compensated solenoids in FCC-ee S. Sinyatkin Budker Institute of Nuclear Physics 13 July 2015, CERN.
LDC Meeting Vienna 17. November 2005 Karsten Büßer LDC Machine Detector Interface Update.
Adiabatic eRHIC Extraction June 3, 2015Stephen Brooks, eRHIC meeting1 With emittance growth analysis.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting Updated
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
1 April 1 st, 2003 O. Napoly, ECFA-DESY Amsterdam Design of a new Final Focus System with l* = 4,5 m J. Payet, O. Napoly CEA/Saclay.
Interaction Region and Detector
MDI and head-on collision option for electron-positron Higgs factories
FCC-ee IR magnetic element design – an update
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
LHeC interaction region
JLEIC Forward Ion Detection Region
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Large Booster and Collider Ring
First Look at Nonlinear Dynamics in the Electron Collider Ring
NEW DESIGN OF THE TESLA INTERACTION REGION WITH l* = 5 m
Updates on IR and FF for super-B factory
Overview of MDI design II
Compensation of Detector Solenoid with Large Crossing Angle
Comparison of the final focus design
Interaction Region Design Options e+e- Factories Workshop
S.Kuroda ( KEK ) Final Focus Optics Collimeter Final Doublet
EIC Accelerator Collaboration Meeting
CLIC Interaction Region when beams meet detectors
IR Lattice with Detector Solenoid
Studies of crossing angle and SR effects for CLIC TENTATIVE
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Sawtooth effect in CEPC PDR/APDR
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Some of the Points Raised During my JLAB Visit
Compensation of Detector Solenoids
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Integration of Detector Solenoid into the JLEIC ion collider ring
Status of IR / Nonlinear Dynamics Studies
Upgrade on Compensation of Detector Solenoid effects
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Compensation of Detector Solenoid Coherent Orbit Correction
100th FCC-ee Optics Design Meeting
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Option 1: Reduced FF Quad Apertures
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Review of Detector Solenoid Effect to the Beam Effect on Beam Orbit Effect on Beam Size S.Kuroda(KEK)

Solenoid Effect on Beam Orbit Sharp edge approximation Finite crossing angle with offset L  c   y=0  y’=-  : No effect on Luminosity for e+e-, but need compensation for e-e- Need compensation for post IP polarimetry  =B0  c/(2 B  )  y’= -2  for extracted beam must be also considered in extraction line design. [B.Parker, A.Seryi]

Correction of the Orbit Offset 2 correctors K1=  /(1-L1/L2) ( inside sol.) K2= -  /(L2/L1-1)( outside sol.) Extracted beam  y’=−Θ(2 + 1/(L2/L1 − 1)) [B.Parker, A.Seryi]

Detector Integrated Dipole(DID) Real solenoid field extends and overlaps to FD. Correction by FD offset  Large orbit distortion  Correction should be done locally(y changes inside solenoid)  DID DID: Co-winding with solenoid in cryostat 1. Smaller B  radiation Length in detector  acceptance 2. Avoiding torque(forces) between solenoid and B when B is introduced separately. 3. Large bore  good uniformity in beam region DID+FD offset  IP angle compensation [B.Parker]

Solenoid Effect on Beam Size Effect due to synchrotron radiation  SR ~ (B 0  c L) 5/2 F(optics) [PRSTAB ] (independent on beam energy) for  c =20mrad full x-ing angle:  SR = 0.31 nm in SD  SR = 0.57 nm in LD  where  is understood as  =sqrt[   2 ]

Overlapping effect of Bz to FD 1.Real solenoid field extends and overlaps to FD  Beam size growth 2. Independent on  c  LD Bz profile LD model,  = 20 mradLD model,  = 0 [Y.Nosochkov, A.Seryi] green:no solenoid red:with solenoid

Beam size compensation  Correction can be done using skew Q & SX displacement   y/  y0~1.03 This correction method is difficult when E is very low. SiD case only orbit cor. Beam size cor. by SQ,SX… [B.Parker, A.Seryi]

Example of LD solenoid compensation using two weak antisolenoids (2.26 and 0.07 Tm) placed at two FF quads. Total field with and w/o antisolenoids IP phase space with antisolenoid correction,  y = 23% With antisolenoids and linear knobs,  y = 0.9% [Y.Nosochkov, A.Seryi]

IP distortion & beam size compensation for SiD (DID & anti-solenoid)  Additional B BXMID introduced Beam size is corrected to  y/  y0~1.01 by anti-solenoid and skew Q  Knob strength is relaxed by anti-solenoid

Summary For non-zero x-ing angle, solenoid field will make finite  y’ should be zeroed for e-e- collision/post IP polarimetry A corrector in solenoid region is needed( e.g. DID ) Beam size growth due to overlapping solenoid field to FD ( indep. on x-ing angle ) >> Beam size growth due to synchrotron rad. Anti-solenoid method excellently compensates this effect ( down to low E )