Quality and Operations Management Process Control and Capability Analysis.

Slides:



Advertisements
Similar presentations
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Advertisements

Quality Assurance (Quality Control)
Chapter 9A. Process Capability & Statistical Quality Control
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Chapter 8 - Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
Slide 1 Choosing the Appropriate Control Chart Attribute (counts)Variable (measurable) Defect Defective (MJ II, p. 37) The Lean Six Sigma Pocket Toolbook,
Chapter 5. Methods and Philosophy of Statistical Process Control
Chapter 18 Introduction to Quality
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
Statistical Process Control (SPC)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
Control Charts are tools for tracking variation based on the principles of probability and statistics SPC: Statistical Process Control.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
Operations Management
Control Charts for Attributes
15 Statistical Quality Control CHAPTER OUTLINE
QUALITY CONTROL AND SPC
SPC – Attribute Control Charts
X-bar and R Control Charts
Quality management: SPC III – control charts for attributes
The Bell Shaped Curve By the definition of the bell shaped curve, we expect to find certain percentages of the population between the standard deviations.
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Statistical Process Control
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Process Capability and SPC
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Control Charts An Introduction to Statistical Process Control.
CONTROL CHART FOR QUALITY CONTROL _ X-R CHART _ X-R chart is a pair of chart consisting of a average chart (X chart) and a range chart (R chart). The X.
Operations Management
Chapter 7. Control Charts for Attributes
11/23/2015ENGM 720: Statistical Process Control1 ENGM Lecture 08 P, NP, C, & U Control Charts.
Statistical Process Control
Statistical Quality Control
Statistical Process Control Production and Process Management.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
OPSM301 Operations Management Spring 2012
Statistical Process Control
Statistical Process Control (SPC)
10 Quality Control.
QUALITY CONTROL AND QUALITY ASSURANCE (Contd.)
Statistical Process Control
Process Capability.
Statistical Process Control
Presentation transcript:

Quality and Operations Management Process Control and Capability Analysis

Process Control Recognizes that variance exists in all processes Sources of variation –systematic –assignable Purpose –to detect and eliminate ‘out-of-control’ conditions –to return a process to an ‘in-control’ state Basic tool -- the SPC chart(s)

Measuring A Process Types of measurements –variables data length, weight, speed, output, etc discrete values –attributes data good vs bad, pass vs fail, etc binary values Types of charts –variables -- X-R chart –attributes -- p, np, c and u Basic assumption -- sample means are normally distributed

Getting Started with SPC X-R Charts Determine sample size and frequency of data collection Collect sufficient historical data Ensure normality of distribution Calculate factors for control charts Construct control chart Plot data points Determine outliers and eliminate assignable causes Recalculate control limits with reduced data set Implement new process control chart X R UCLxLCLx UCLrLCLr

Basic Properties  x = std dev of sample mean =  /  n (where  = process standard deviation) conventional approach uses  3  /  n limitations of control charts –Type I Error: probability that an in-control value would appear as out-of-control –Type II Error: probability that a shift causing an out-of- control situation would be mis-reported as in-control –delays due to sampling interval –charting without taking action on assignable causes –over control actions

Type 1 and Type 2 Error Type 1 error Type 2 error No error Alarm No Alarm In Control Out of Control Suppose  1 > , then Type 2 Error = Z [(  + 3  x -  1 ) /  x ] Type 1 Error = for 3  charts

Type 2 Error Example Suppose:  = 10  1 = 10.2  = 4/3 n = 9 thus,  x = 4/9 Then, Type 2 Error = Z [(  + 3  x -  1 ) /  x ] = Z [( / ) / (4/9)] = Z [2.55] = if  1 = 11.0, then Type 2 Error = Z[0.75] =.7734 if  1 = 12.0, then Type 2 Error = Z[-1.50] =.0668 Prob.{shift will be detected in 3 rd sample after shift occurs} = *0.0668*( ) = Average number of samples taken before shift is detected = 1/( ) = Prob.{no false alarms first 32 runs, but false alarm on 33rd} = (0.9973) 32 *(0.0027) =.0025 Average number of samples taken before a false alarm = 1/ = 370

Tests for Unnatural Patterns Probability that “odd” patterns observed are not “natural” variability are calculated by using the probabilities associated with each zone of the control chart Use the assumption that the population is normally distributed Probabilities for X-chart are shown on next slide

Normal Distribution Applied to X-R Control Charts A A B B C C +3  +2  +1  -1  -2  -3  Probability = Probability =.1360 Probability =.3413 Probability =.1360 Probability = Probability = Probability = UCLx LCLx X Outer 3rd Middle 3rd Inner 3rd

A Few Standard Tests 1 point outside Zone A 2 out of 3 in Zone A or above (below) 4 out of 5 in Zone B or above (below) 8 in a row in Zone C or above (below) 10 out of 11 on one side of center

Tests for Unnatural Patterns 2 out of 3 in A or beyond –.0227 x.0227 x ( ) x 3 = out of 5 in B or beyond – x ( ) x 5 = in a row on one side of center –.50 8 =.0039

Other Charts P-chart –based on fraction (percentage) of defective units in a varying sample size np-chart –based on number of defective units in a fixed sample size u-chart –based on the counts of defects in a varying sample size c-chart –based on the count of defects found in a fixed sample size

SPC Quick Reference Card

P-chart –based on fraction (percentage) of defective units in a varying sample size –UCL/LCL p = p  3  (p)(1-p)/n np-chart –based on number of defective units in a fixed sample size –UCL/LCL np = np  3  (np)(1-p) u-chart –based on the counts of defects in a varying sample size – UCL/LCL u = u  3  u/n c-chart –based on the count of defects found in a fixed sample size –UCL/LCL c = c  3  c X-R chart –variables data –UCL/LCL X = X  3  x = X  3  /  n = X  A 2 R where  R/d 2 –UCL R = D 4 Rand A 2 = 3/d 2  n –LCL R = D 3 R for p, np, u, c and R chart the LCL can not be less than zero.

Process Capability Cp: process capability ratio –a measure of how the distribution compares to the width of the specification –not a measure of conformance –a measure of capability, if distribution center were to match center of specification range Cpk: process capability index –a measure of conformance (capability) to specification –biased towards “worst case” –compares sample mean to nearest spec. against distribution width

How Good is Good Enough? Cp = 1.0 =>  3  => 99.73% (in acceptance) =>.9973 => 2700 ppm out of tolerance –PG&E operates non-stop hours per year without electricity –average car driven 15,000 miles per year 41 breakdowns or problems per year Cp = 2.0 =>  6  => % (in acceptance) => => 3.4 ppm out of tolerance –PG&E operates non-stop 1.78 minutes per year without electricity –average car driven 15,000 miles per year breakdowns or problems per year or one every 20 years