Statistical Process Control

Slides:



Advertisements
Similar presentations
Chapter 6 - Statistical Process Control
Advertisements

© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Operations Management Statistical Process Control Supplement 6
Quality Assurance (Quality Control)
17- 1 Chapter Seventeen McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved.
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 15 Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
BMM 3633 Industrial Engineering
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
1 Statistics -Quality Control Alan D. Smith Statistics -Quality Control Alan D. Smith.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
6 Managing Quality PowerPoint presentation to accompany
ISEN 220 Introduction to Production and Manufacturing Systems Dr. Gary Gaukler.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Chapter 8 - Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
© 2008 Prentice-Hall, Inc. Chapter 17 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides.
Chapter 18 Introduction to Quality
Statistical Quality Control
Chapter 10 Quality Control McGraw-Hill/Irwin
Statistical Process Control
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Operations Management
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Statistical Process Control OPIM.
Control Charts.
Operations Management
X-bar and R Control Charts
Statistical Process Control
Statistical Process Control. Overview 1.Definition of Statistical Process Control 2.Common causes and assignable causes of variation 3.Control charts.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Operations Management
Statistical Process Control
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Lesson 7.1 Quality Control Today we will learn to… > use quality control charts to determine if a manufacturing process is out of control.
Welcome to MM305 Unit 8 Seminar Prof Greg Statistical Quality Control.
“It costs a lot to produce a bad product.” Norman Augustine
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Control Charts.
Operations Management
Chapter 7 Statistical Quality Control. Quality Control Approaches l Statistical process control (SPC) Monitors the production process to prevent poor.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Statistical Process Control
Statistical Quality Control
OPSM 301 Operations Management Class 17: Quality: Statistical process control Koç University Zeynep Aksin
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Quality Improvement Tools CHAPTER SIX SUPPLEMENT McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Statistical Process Control
Quality Control  Statistical Process Control (SPC)
Les Jones IET 603. Shewhart Control Charts for: characteristics such as: length, width, temperature and volume. 1.Understand the statistical basis of.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control
Statistical Process Control (SPC)
Presentation transcript:

Statistical Process Control 6 SUPPLEMENT PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition Principles of Operations Management, Ninth Edition PowerPoint slides by Jeff Heyl © 2014 Pearson Education, Inc.

Learning Objectives Apply quality management tools for problem solving Identify the importance of data in quality management 6S–2

Statistical Quality Control Introduction Statistical Quality Control Statistical Process Control (SPC) Acceptance Sampling (AS) Statistical process control is a statistical technique that is widely used to ensure that the process meets standards. Acceptance sampling is used to determine acceptance or rejection of material evaluated by a sample. 6S–3

Preparing the clay for throwing Introduction Pottery Making Process Pinching pots Preparing the clay for throwing Wedging Throwing Painting Firing 6S–4

Introduction 6S–5

Statistical Process Control Chart (SPC) Variability is inherent in every process. Natural variation – can not be eliminated Assignable variation -- Deviation that can be traced to a specific reason: machine vibration, tool wear, new worker. Variation Natural Variation Assignable Variation 6S–6

Statistical Process Control Chart (SPC) The essence of SPC is the application of statistical techniques to prevent, detect, and eliminate defective products or services by identifying assignable variation. 6S–7

Statistical Process Control Chart (SPC) A control chart is a time-ordered plot obtained from an ongoing process Abnormal variation due to assignable sources Out of control UCL LCL Natural variation due to chance Mean Abnormal variation due to assignable sources 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Sample number 6S–8

Statistical Process Control Chart (SPC) Control Charts for Variable Data Control Charts for Attribute Data -charts (for controlling central tendency) R-charts (for controlling variation) p-charts (for controlling percent defective) c-charts (for controlling number of defects) Variable Data (continuous): quantifiable conditions along a scale, such as speed, length, density, etc. Attribute Data (discrete): qualitative characteristic or condition, such as pass/fail, good/bad, go/no go. 6S–9

Statistical Process Control Chart (SPC) Take random samples Calculate the upper control limit (UCL) and the lower control limit (LCL) Plot UCL, LCL and the measured values If all the measured values fall within the LCL and the UCL, then the process is assumed to be in control and no actions should be taken except continuing to monitor. If one or more data points fall outside the control limits, then the process is assumed to be out of control and corrective actions need to be taken.

x-Charts Upper control limit (UCL) = x + A2R Lower control limit (LCL) = x - A2R where R = average range of the samples A2 = control chart factor from Table S6.1(page 241) x = average of the sample means 6S–11

x-Charts Range=18-13=5 Range=17-14=3 R = (5+3)/2 = 4 Hour 1 Hour 2 Box Weight of Number Oat Flakes 1 17 2 13 3 16 4 18 5 17 6 16 7 15 8 17 9 16 Hour 2 Box Weight of Number Oat Flakes 1 14 2 16 3 15 4 14 5 17 6 15 7 15 8 14 9 17 Range=18-13=5 Range=17-14=3 R = (5+3)/2 = 4 6S–12

x-Charts Upper control limit (UCL) = x + A2R Lower control limit (LCL) = x - A2R where R = average range of the samples A2 = control chart factor from Table S6.1 (page241) x = average of the sample means 6S–13

x-Charts x = (16.11+15.22)/2 = 15.665 Hour 1 Hour 2 Box Weight of Number Oat Flakes 1 17 2 13 3 16 4 18 5 17 6 16 7 15 8 17 9 16 Hour 2 Box Weight of Number Oat Flakes 1 14 2 16 3 15 4 14 5 17 6 15 7 15 8 14 9 17 Average=(17+13+…+16)/9=16.11 Average=(14+16+…+17)/9=15.22 x = (16.11+15.22)/2 = 15.665 6S–14

x-Charts Upper control limit (UCL) = x + A2R Lower control limit (LCL) = x - A2R where R = average range of the samples A2 = control chart factor from Table S6.1 (page241) x = average of the sample means 6S–15

x-Charts Sample Size Mean Factor Upper Range Lower Range n A2 D4 D3 2 1.88 3.27 0 3 1.02 2.58 0 4 .73 2.28 0 5 .58 2.12 0 6 .48 2.00 0 7 .42 1.92 0.08 8 .37 1.86 0.14 9 .34 1.82 0.18 10 .31 1.78 0.22 11 .29 1.74 0.26 6S–16

x-Charts Upper control limit (UCL) = x + A2R Lower control limit (LCL) = x - A2R where R = average range of the samples A2 = control chart factor from Table S6.1 (page241) x = average of the sample means 6S–17

x-Charts Example S6.1: Eight samples of seven tubes were taken at random intervals. Construct the x-chart with 3- control limit. Is the current process under statistical control? Why or why not? Should any actions be taken? Sample size = n = 7 A2 = ? 6S–18

x-Charts Sample Size Mean Factor Upper Range Lower Range n A2 D4 D3 2 1.88 3.27 0 3 1.02 2.58 0 4 .73 2.28 0 5 .58 2.12 0 6 .48 2.00 0 7 .42 1.92 0.08 8 .37 1.86 0.14 9 .34 1.82 0.18 10 .31 1.78 0.22 11 .29 1.74 0.26 6S–19

x-Charts Example S6.1: Eight samples of seven tubes were taken at random intervals. Construct the x-chart with 3- control limit. Is the current process under statistical control? Why or why not? Should any actions be taken? A2 = 0.42 6S–20

x-Charts Control Chart for sample of 7 tubes 6.43 = UCL 6.36 = Mean 6.29 = LCL 6.36 = Mean | | | | | | | | | | | | 1 2 3 4 5 6 7 8 9 10 11 12 Sample number It is assumed that the central tendency of process is in control with 99.73% confidence. No actions need to be taken except to continuously monitor this process. 6S–21

Steps in Creating Charts Take samples from the population and compute the appropriate sample statistic Use the sample statistic to calculate control limits Plot control limits and measured values Determine the state of the process (in or out of control) Investigate possible assignable causes and take actions 6S–22

R-Charts Upper control limit (UCL) = D4R Lower control limit (LCL) = D3R where R = average range of the samples D3 and D4 = control chart factors from Table S6.1 (Page 241) 6S–23

R-Charts Sample Size Mean Factor Upper Range Lower Range n A2 D4 D3 2 1.88 3.27 0 3 1.02 2.58 0 4 .73 2.28 0 5 .58 2.12 0 6 .48 2.00 0 7 .42 1.92 0.08 8 .37 1.86 0.14 9 .34 1.82 0.18 10 .31 1.78 0.22 11 .29 1.74 0.26 6S–24

R-Charts Example S6.2 Average range R = 5.3 pounds Sample size n = 5 From Table S6.1 D4 = ? D3 = ? 6S–25

R-Charts Sample Size Mean Factor Upper Range Lower Range n A2 D4 D3 2 1.88 3.27 0 3 1.02 2.58 0 4 .73 2.28 0 5 .58 2.12 0 6 .48 2.00 0 7 .42 1.92 0.08 8 .37 1.86 0.14 9 .34 1.82 0.18 10 .31 1.78 0.22 11 .29 1.74 0.26 6S–26

R-Charts Example S6.2 Average range R = 5.3 pounds Sample size n = 5 From Table S6.1 D4 = 2.12, D3 = 0 UCL = 11.2 Mean = 5.3 LCL = 0 UCLR = D4R = (2.12)(5.3) = 11.2 pounds LCLR = D3R = (0)(5.3) = 0 pounds 6S–27

R-Charts Example S6.3: Refer to Example S6.1. Eight samples of seven tubes were taken at random intervals. Construct the R-chart with 3- control limits. Is the current process under statistical control? Why or why not? Should any actions be taken? n=7 D3 =? D4 = ? 6S–28

R-Charts Sample Size Mean Factor Upper Range Lower Range n A2 D4 D3 2 1.88 3.27 0 3 1.02 2.58 0 4 .73 2.28 0 5 .58 2.12 0 6 .48 2.00 0 7 .42 1.92 0.08 8 .37 1.86 0.14 9 .34 1.82 0.18 10 .31 1.78 0.22 11 .29 1.74 0.26 6S–29

R-Charts Example S6.3: Refer to Example S6.1. Eight samples of seven tubes were taken at random intervals. Construct the R-chart with 3- control limits. Is the current process under statistical control? Why or why not? Should any actions be taken? D3 =0.08, D4 = 1.92 6S–30

R-Charts Control Chart for sample of 7 tubes 0.33 = UCL 0.17 = R 0.01 = LCL 0.17 = R | | | | | | | | | | | | 1 2 3 4 5 6 7 8 9 10 11 12 Sample number The variation of process is in control with 99.73% confidence. 6S–31

Mean and Range Charts (a) The central tendency of process is in control, but its variation is not in control. R-chart (R-chart detects increase in dispersion) UCL LCL x-chart (x-chart does not detect dispersion) UCL LCL 6S–32

Mean and Range Charts (b) The variation of process is in control, but its central tendency is not in control. UCL (R-chart does not detect changes in mean) R-chart LCL x-chart (x-chart detects shift in central tendency) UCL LCL 6S–33

R-Chart and X-Chart Example S6.4: Seven random samples of four resistors each are taken to establish the quality standards. Develop the R-chart and the x-chart both with 3- control limits for the production process. Is the entire process under statistical control? Why or why not? n = 4 D3 = 0, and D4 = 2.28 R = (3 + 2 + … + 4)/7 = 3.0 6S–34

R-Chart and X-Chart Control Chart for sample of 4 resistors 6.84 = UCL 0 = LCL | | | | | | | | | | | | 1 2 3 4 5 6 7 8 9 10 11 12 Sample number The variation of process is in control with 99.73% confidence. 6S–35

R-Chart and X-Chart n = 4, A2 = 0.73 R = (3 + 2 + … + 4)/7 = 3.0 6S–36

R-Chart and X-Charts Control Chart 101.98 = UCL 99.79 = Mean 97.6 = LCL | | | | | | | | | | | | 1 2 3 4 5 6 7 8 9 10 11 12 Sample number The central tendency of process is not in control with 99.73% confidence. In conclusion, with 99.7% confidence, the entire resistor production process is not in control since its central tendency is out of control although its variation is under control. 6S–37

EX 1 in class A part that connects two levels should have a distance between the two holes of 4”. It has been determined that x-bar chart and R-chart should be set up to determine if the process is in statistical control. The following ten samples of size four were collected. Calculate the control limits, plot the control charts, and determine if the process is in control No. of Sample Mean Range 1 4.01 0.04 2 3.98 0.06 3 4.00 0.02 4 3.99 0.05 5 6 3.97 7 4.02 8 9 10 6S–38

R-Chart and X-Chart # of sample Readings of Resistance (ohms) 1 99 100 Example S6.5: Resistors for electronic circuits are manufactured at Omega Corporation in Denton, TX. The head of the firm’s Continuous Improvement Division is concerned about the product quality and sets up production line checks. She takes seven random samples of four resistors each to establish the quality standards. Develop the R-chart and the chart both with 3- control limits for the production process. Is the entire process under statistical control? Why or why not? # of sample Readings of Resistance (ohms) 1 99 100 102 101 2 103 3 98 4 5 6 95 97 96 7 6S–39

R-Chart and X-Chart D3 =0 D4 = 2.28 n=4 # of Sample 1 2 3 4 5 6 7 Sample range Sample mean 100.5 101.5 100.0 99.5 99.0 97.0 101.0 D3 =0 D4 = 2.28 n=4 6.84 = UCL variation of process is in control with 99.73% confidence. 3.0 = R 0 = LCL | | | | | | | | | | | | 1 2 3 4 5 6 7 8 9 10 11 12 Sample number 6S–40

R-Chart and X-Chart A2 =0.73 n=4 X= (100.5 + … + 101.0)/7  99.8 # of Sample 1 2 3 4 5 6 7 Sample range Sample mean 100.5 101.5 100.0 99.5 99.0 97.0 101.0 X= (100.5 + … + 101.0)/7  99.8 A2 =0.73 n=4 102.0 = UCL central tendency of process is not in control with 99.73% confidence. 99.8 = X 97.6 = LCL Thus, entire process is not in control. | | | | | | | | | | | | 1 2 3 4 5 6 7 8 9 10 11 12 Sample number 6S–41

EX 2 in class A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Set up control charts to determine if the process is in statistical control Day Package 1 Package 2 Package 3 Package 4 Monday 23 22 24 Tuesday 21 19 Wednesday 20 Thursday 18 Friday 6S–42

Statistical Process Control Chart (SPC) Control Charts for Variable Data Control Charts for Attribute Data -charts (for controlling central tendency) R-charts (for controlling variation) p-charts (for controlling percent defective) c-charts (for controlling number of defects) Variable Data (continuous): quantifiable conditions along a scale, such as speed, length, density, etc. Attribute Data (discrete): qualitative characteristic or condition, such as pass/fail, good/bad, go/no go. 6S–43

Control Charts for Attribute Data Categorical variables Good/bad, yes/no, acceptable/unacceptable Measurement is typically counting defectives Charts may measure Percentage of defects (p-chart) Number of defects (c-chart) 6S–44

P-Charts where p = mean percent defective overall the samples z = number of standard deviations = 3 n = sample size 6S–45

P-Charts Example S6.6: Data-entry clerks at ARCO key in thousands of insurance records each day. One hundred records entered by each clerk were carefully examined and the number of errors counted. Develop a p-chart with 3- control limits and determine if the process is in control. Sample Number Percent Sample Number Percent Number of Errors Defective Number of Errors Defective 1 6 .06 11 6 .06 2 5 .05 12 1 .01 3 0 .00 13 8 .08 4 1 .01 14 7 .07 5 4 .04 15 5 .05 6 2 .02 16 4 .04 7 5 .05 17 11 .11 8 3 .03 18 3 .03 9 3 .03 19 0 .00 10 2 .02 20 4 .04 Total = 80 6S–46

P-Charts n = 100 Because we cannot have a negative percent defective

P-Charts Possible assignable causes present .11 – .10 – .09 – .08 – .07 – .06 – .05 – .04 – .03 – .02 – .01 – .00 – Sample number Percent defective UCL= 0.10 LCL= 0.00 p = 0.04 | | | | | | | | | | 2 4 6 8 10 12 14 16 18 20 Possible good assignable causes present The process is not in control with 99.73% confidence. 6S–48

C-Charts A c-chart is used when the quality cannot be measured as a percentage. Number of car accidents per month at a particular intersection Number of complaints the service center of a hotel receives per week Number of scratches on a nameplate Number of dimples found on a metal sheet 6S–49

C-Charts UCL = c + 3 c LCL = c - 3 c where c = mean number defective overall the samples 6S–50

C-Charts UCL = c + 3 c = 6 + 3 6 = 13.35 LCL = c - 3 c = 6 - 3 6 Example S6.7: Over 9 weeks, Red Top Cab company received the following numbers of calls from irate passengers: 3, 0, 8, 9, 6, 7, 4, 9, 8, for a total of 54 complaints. Determine the 3-  control limits of a c-Chart. | 1 2 3 4 5 6 7 8 9 Week Number Number of defect 14 – 12 – 10 – 8 – 6 – 4 – 2 – 0 – c = 54 / 9 = 6 complaints /week UCL = 13.35 LCL = 0 c = 6 UCL = c + 3 c = 6 + 3 6 = 13.35 LCL = c - 3 c = 6 - 3 6 = - 1.35 => 0 The process is in control with 99.73% confidence. Because we cannot have the negative number of defective records 6S–51

Managing Quality Summary Effective quality management is data driven There are multiple tools to identify and prioritize process problems There are multiple tools to identify the relationships between variables 6S–52