Statistical Process Control Used to determine whether the output of a process conforms to product or service specifications. We use control charts to detect.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
Quality Assurance (Quality Control)
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
Statistical Process Control Processes that are not in a state of statistical control show excessive variations or exhibit variations that change with time.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
Global Business Management Group
Chapter 10 Quality Control McGraw-Hill/Irwin
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Statistical Process Control A. A. Elimam A. A. Elimam.
Operations Management
© 2007 Pearson Education Process Performance and Quality Chapter 6.
CHAPTER 8TN Process Capability and Statistical Quality Control
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
10 Quality Control CHAPTER
Statistical Process Control
5 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Quality And Performance 5.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e KR: Chapter 7 Statistical Process Control.
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Statistical Process Control
Quality Control.
Chapter 10 Quality Control McGraw-Hill/Irwin
Quality and Education Business has made progress toward quality over the past several years. But I don’t believe we can truly make quality a way of life.
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
Operations Management
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Statistical Process Control
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Operations Management
© 2007 Pearson Education Process Performance and Quality Chapter 6.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Statistical Process Control
Statistical Quality Control/Statistical Process Control
Statistical Quality Control
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
Statistical Process Control Production and Process Management.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
Dr. Dipayan Das Assistant Professor Dept. of Textile Technology Indian Institute of Technology Delhi Phone:
Statistical Process Control Dr. Mohamed Riyazh Khan DoMS.
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 30 1.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
Chapter 6 Quality Management. Types of Quality to Consider User based qualityUser based quality –Eyes of the customer, sometimes not measurable Product.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
OPSM301 Operations Management Spring 2012
Tech 31: Unit 3 Control Charts for Variables
36.1 Introduction Objective of Quality Engineering:
Statistical Process Control
Statistical Process Control (SPC)
10 Quality Control.
10 Quality Control.
QUALITY CONTROL AND QUALITY ASSURANCE (Contd.)
Statistical Process Control
Process Capability.
Statistical Quality Control
Presentation transcript:

Statistical Process Control Used to determine whether the output of a process conforms to product or service specifications. We use control charts to detect production of defective products or services or to indicate that the production or service process has changed. We can measure items such as: Increases in defective production Decrease in service complaints Consistently low measure of units Decline in re-work or scrap

Common Causes of Variation Purely random, unidentifiable sources of variation that are unavoidable with the current process. For example, weigh 100 bags of M&M’s. The results on a scatter gram tend to have the shape of a bell curve. Symmetric: same number of points above and below the mean. Skewed: preponderance of observations either above or below the mean.

Common Causes Characteristics of distributions Mean—the average observation Spread—the dispersion of observations around the mean Shape—whether the observations are symmetrical or skewed Common cause variation is normally distributed (symmetrical) and stable (the mean and spread do not change over time).

Assignable Causes of Variation Any cause of variation that can be identified and eliminated. Such as an employee that needs training or a machine that needs repair. Change in the mean, spread, or shape of a process distribution is a symptom that an assignable cause of variation has developed. After a process is in statistical control, SPC is used to detect significant change, indicating the need for corrective action.

The Inspection Process Use of inspection to simply remove defectives is improper. It does nothing to prevent defects. We cannot “inspect” quality into a part. Quality measurements Variables—a characteristic measured on a continuous scale: such as weight, length, volume, or time. Advantage: if defective, we know by how much—the direction and magnitude of corrections are indicated. Disadvantage: precise measurements are required.

The Inspection Process Quality measurements Attributes—a characteristic that can be counted (yes-no, integer number). Used to determine conformance to complex specifications, or when measuring variables is too costly Advantages - Quickly reveals when quality has changed, provides an integer number of how many are defective. Requires less effort and fewer resources than measuring variables. Disadvantages: Doesn’t show by how much they were defective, the direction and magnitude of corrections are not indicated, Requires more observations, as each observation provides little information

The Inspection Process Sampling Complete inspection Used when costs of failure are high relative to costs of inspection Inspection is automated Some defects are not detected because of Inspector fatigue or Imperfect testing methods

The Inspection Process Sampling plans Used when Inspection costs are high or Inspection destroys the product Some defectives lots may be purchased and some good lots may be rejected when The sample does not perfectly represent the population Testing methods are imperfect Sampling plans include Sample size, n random observations Time between successive samples Decision rules that determine when action should be taken

The Inspection Process Sampling distributions Sample means are usually dispersed about the population mean according to the normal probability distribution (reference the central limit theorem described in statistics texts). Control charts Used to judge whether action is required A sample characteristic measured above the upper control limit (UCL) or below the lower control limit (LCL) indicates that an assignable cause probably exists.

Inspection station location Purchased input materials Could use acceptance sampling Work in process Not after every process Before it is covered up Before costly, irreversible, or bottleneck operations so that resources are used efficiently Final product or service Before stocking or shipping to the customer Customers often play a major role in final inspection of services

Normal Distribution –3  –2  –1  +1  +2  +3  Mean 68.26% 95.44% 99.74%  = Standard deviation

Control Charts UCL Nominal LCL Assignable causes likely – may also indicate improvement Samples Common Causes

Using Control Charts for Process Improvement  Measure the process  When changes are indicated, find the assignable cause  Eliminate problems, incorporate improvements  Repeat the cycle

Indicators of out of control conditions A trend in the observations (the process is drifting) A sudden or step change in the observations A run of five or more observations on the same side of the mean (If we flip a coin and get “heads” five times in a row, we become suspicious of the coin or of the coin flipping process.) Several observations near the control limits (Normally only 1 in 20 observations are more than 2 standard deviations from the mean.)

Control Chart Examples Nominal UCL LCL Sample number Variations In Control

Control Chart Examples Nominal UCL LCL Sample number Variations Run – generally 5 or more, take action, even if not outside control limits

Control Chart Examples Nominal UCL LCL Sample number Variations Sudden change – last 4 are unusual

Control Chart Examples Nominal UCL LCL Sample number Variations Upward run

Control Chart Examples Nominal UCL LCL Sample number Variations Out of control

Control Limits and Errors LCL Process average UCL Three-sigma limits – the cost of searching for assignable cause is large relative to the cost of not detecting a shift in the process average. Type I error: Probability of searching for a cause when none exists Type II error: Probability of concluding that nothing has changed Shift in process average

Control Limits and Errors Type I error: Probability of searching for a cause when none exists Two-sigma limits – the cost of not detecting a shift in the process exceeds the cost of searching for assignable causes. With smaller control limits, a shift in process average will be detected sooner. Type II error: Probability of concluding that nothing has changed Shift in process average UCL LCL Process average

Sample Number Special Metal Screw Control Charts for Variables

Sample Number1234R x – = ( )/4= )/4= Special Metal Screw _ Control Charts for Variables

Sample Number1234R x Special Metal Screw _

Sample Number1234R x R = x = Special Metal Screw = _ Control Charts for Variables

Control Charts – Special Metal Screw R -Charts R = UCL R = D 4 R LCL R = D 3 R Control Charts for Variables

Control Chart Factors Control Chart Factors Factor for UCLFactor forFactor Size ofand LCL forLCL forUCL for Samplex-ChartsR-ChartsR-Charts (n)(A 2 )(D 3 )(D 4 ) Control Charts for Variables

Control Charts—Special Metal Screw R -Charts R = D 4 = D 3 = 0 UCL R = (0.0021) = in. LCL R = 0 (0.0021) = 0 in. UCL R = D 4 R LCL R = D 3 R Control Charts for Variables

Control Charts—Special Metal Screw X -Charts UCL x = x + A 2 R LCL x = x - A 2 R = = R = x = = Control Charts for Variables

Control Charts—Special Metal Screw x -Charts UCL x = (0.0021) = in. LCL x = – (0.0021) = in. UCL x = x + A 2 R LCL x = x - A 2 R = = R = A 2 = x = = Control Charts for Variables

 Measure the process  Find the assignable cause  Eliminate the problem  Repeat the cycle Control Charts for Variables

Control Charts for Variables Using  UCL x = (1.5)/ 6 = 6.20 min UCL x = 5.0 – 1.96(1.5)/ 6 = 3.80 min UCL x = x + z  x LCL x = x – z  x  x =  /  n== Sunny Dale Bank x =5.0 minutes  =1.5 minutes n =6 customers z =1.96 =

Control Charts for Attributes Hometown Bank UCL p = p + z  p LCL p = p – z  p  p = p (1 – p )/ n

Hometown Bank SampleWrong NumberAccount Number Total 147 Total defectives Total observations p = n = (2500) p = p =

Hometown Bank UCL p = p + z  p LCL p = p – z  p  p = (1 – )/2500 n = 2500 p = Control Charts for Attributes

Hometown Bank  p = n = 2500 p = UCL p = (0.0014) LCL p = – 3(0.0014) Control Charts for Attributes

p -Chart Wrong Account Numbers  Measure the process  Find the assignable cause  Eliminate the problem  Repeat the cycle

p-Chart comments Two things to note: The lower control limit cannot be negative. When the number of defects is less than the LCL, then the system is out of control in a good way. We want to find the assignable cause. Find what was unique about this event that caused things to work out so well.

c = 20 z = 2 UCL c = c + z c LCL c = c – z c Control Charts for Attributes

c = 20 z = 2 UCL c = LCL c = 20 – 2 20 Control Charts for Attributes UCL c = LCL c = 11.06

Control Charts for Attributes

Process Capability Nominal value Hours Upper specification Lower specification Process distribution (a) Process is capable

Process Capability Nominal value Hours Upper specification Lower specification Process distribution (b) Process is not capable

Process Capability Lower specification Mean Upper specification Six sigma Four sigma Two sigma Nominal value

Upper specification = 1200 hours Lower specification = 800 hours Average life = 900 hours  = 48 hours Process Capability Ratio Cp = Upper specification - Lower specification 6  Cp = 1200 – 800 6(48) Cp = 1.39

Process Capability Lightbulb Production Upper specification = 1200 hours Lower specification = 800 hours Average life = 900 hours  = 48 hours Cp = 1.39 Cpk = Minimum of ProcessCapabilityIndex Upper specification – x 3  x – Lower specification 3 , = =

Process Capability Lightbulb Production Upper specification = 1200 hours Lower specification = 800 hours Average life = 900 hours  = 48 hours 1200 – 900 3(48) 900 – 800 3(48) ProcessCapabilityIndex, Cpk = Minimum of Cp = 1.39

Process Capability Lightbulb Production Upper specification = 1200 hours Lower specification = 800 hours Average life = 900 hours  = 48 hours Cp = 1.39 Cpk = 0.69 ProcessCapabilityIndexProcessCapabilityRatio

Taguchi's Quality Loss Function Loss (dollars) LowerNominalUpper specificationvaluespecification