Cavity BPM for Spectromety: progress and plans A. Lyapin.

Slides:



Advertisements
Similar presentations
BPM Energy Spectrometry for ILC Bino Maiheu University College London for LC-ABD WP 4.2 LC-ABD Meeting IPPP Durham, 26 September 2006 LC-ABD Meeting, 26.
Advertisements

BPM Energy spectrometry, status & future plans at ESA in SLAC Bino Maiheu University College London Yerevan Collaboration Meeting October 2006 Yerevan.
Development of ML-BPM for STF cryomodule H. Hayano, KEK SunYoung Ryu, PNU.
Radio frequency usage/applications Dr S. T. Boogert (accelerator physicist) John Adams Institute at Royal Holloway Royal Holloway.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
BPM-Based Energy Spectrometer Contributors: A. Lyapin, B. Maiheu, F. Gournaris, D. Attree, M. Wing, D. Miller University College London (UCL) M. Slater,
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
Energy Spectrometer for the ILC Alexey Lyapin University College London.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
Tohoku university Daisuke Okamoto TILC09 1. Motivation 2. Principle 3. Design 4. Expected performance 5. Conclusion contents.
Cavity Beam Position Monitor (BPM) for future linear colliders such as CLIC. N Joshi, S Boogert, A Lyapin, et al. Royal.
Tomoyuki Sanuki, Daisuke Okamoto, Yosuke Honda, Toshiaki Tauchi TB&SGC meeting.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
High resolution RF cavity BPM design for Linear Collider Andrei Lunin 8th DITANET Topical Workshop on Beam Position Monitors.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
High resolution cavity BPMs in the context of the European XFEL
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Beam Test status and Plans of the ILC Main LINAC BPM
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
BPM for Spectromety development status A. Lyapin.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
Cavity BPM Simulations A. Liapine. Analysis of the Existing BPMs BINP KEK.
13/Nov/ mm STF2 Coupler Design Content 1.Motivation 2.40mm Design 3.“Preliminary” Result by HFSS 4.“Tentative” Conclusion 5.Future.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Report and plan of the tilt monitor Daisuke Okamoto Tohoku University.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Progress report of the tilt monitor Daisuke OKAMOTO Tohoku University.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
Status of BPMs and Electronics System at KNU.
Re-entrant BPM R&D for ILC Main Linac
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
CLIC Main Linac Cavity BPM Snapshot of the work in progress
CLIC Workshop 2016: Main Beam Cavity BPM
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Cavity BPMs at Diamond S. Boogert, A. Lyapine (UCL), G. Rehm
ERL BPM System Mike Billing, Mark Palmer
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
SLAC - End Station A ILC testrun – April '06 ...
Fabrication of KEK-ATF2 Q-BPM
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
Presentation transcript:

Cavity BPM for Spectromety: progress and plans A. Lyapin

Energy spectrometer meeting, JINR, May BPM for spectrometry  Initially planned to test a rectangular cavity – turns out to be unnecessary after successful ATF2 BPM tests  Basing on existing design concepts (BINP/ATF2) BaselineAlternative

 Successor of previous designs  “Longitudinal” design  4-coupler symmetrical structure  Beam pipe diameter increased to 20 mm to meet the ATF2 beam optics requirements  Dipole mode frequency 6426 MHz (harmonic of the bunch repetition frequency) Symmetric mode leakage: Leakage is less than computation error for the perfect structure Introducing asymmetries (Slot + wg + feedthrough shifted by 0.5 mm, 0.25 mm meshstep) we get a signal equivalent to 10 μm ATF2 Q-BPM design Beam tests:  > 40 dB x-y isolation after tuning  “Clean” signal if BPF is used  Sensitivity on the level of the BINP BPMs

Energy spectrometer meeting, JINR, May ATF2 Q-BPM

Energy spectrometer meeting, JINR, May Baseline BPM parameters  Rectangular waveguides and coupling slots to suppress the monopole mode  30 mm beam pipe diameter to allow for higher optics flexibility and safety  2.8 GHz cavity to allow beam pipe change and to fit into a well explored frequency range, await a better stability; looser tolerances comparing to 6.5 GHz cavities  Decay time allowing for a bunch-to-bunch operation  Downconversion to MHz and digitization at MSamples/s  Both DDC and Fitting algorithms applicable  One reference cavity per triplet, symmetric output

Energy spectrometer meeting, JINR, May Cylindrical prototype 3D view

Energy spectrometer meeting, JINR, May Prototype Al model  Planning to do cold tests before producing a vacuum prototype, a model is being produced in UCL workshop  Going to introduce an asymmetry (one slot will be off axis), also reduced the waveguide length in order to see the monopole mode coupling; this should allow us to set reasonable tolerances, benchmark the simulation code, and choose a reasonable waveguide length

Energy spectrometer meeting, JINR, May Vacuum prototype  Mechanical design is going on  Mechanical engineering and most of production to be done at MSSL (part of UCL), negotiating with external companies  Want to test the model first to fix the tolerances

Energy spectrometer meeting, JINR, May Cavity BPM test bench  An older prototype of the 5.5 GHz cavity was shipped from TU-Berlin for a “live” tuning and software improvement (next couple of weeks?)  Borrowed from DESY-Zeuthen  Shipped to UCL in Nov 2005  Reassembled in Dec 2005  Had problems with the movers – seem to be fixed now  Ordered a 2.8 GHz oscillator  Should be ready for Al model

Energy spectrometer meeting, JINR, May Plans  Al model – ready end June/beg July  (VNA) - ? (test bench)  Have to move the UCL lab  Purchasing VNA for RHUL now, 6 weeks shipping time  More simulations needed  Start production of the vacuum prototype in (end?) July (need 2-3 months, mainly shipping?)  Provide ESA T-474 with a new BPM instrumented with x & y movers and interferometers by the run next year