Chapter 5 Quality Control.

Slides:



Advertisements
Similar presentations
Chapter 6 - Statistical Process Control
Advertisements

© 1997 Prentice-Hall, Inc. S3 - 1 Principles of Operations Management Quality Via Statistical Process Control Chapter S3.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Operations Management Statistical Process Control Supplement 6
17- 1 Chapter Seventeen McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved.
Chapter 9A. Process Capability & Statistical Quality Control
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
BMM 3633 Industrial Engineering
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
1 Statistics -Quality Control Alan D. Smith Statistics -Quality Control Alan D. Smith.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Seventeen Statistical Quality Control GOALS When.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
© 2008 Prentice-Hall, Inc. Chapter 17 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides.
Chapter 10 Quality Control McGraw-Hill/Irwin
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Operations Management
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
Module 3: Statistical Quality Control Operations Management as a Competitive Weapon.
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
Control Charts.
X-bar and R Control Charts
1 1 Slide | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | UCL CL LCL Chapter 13 Statistical Methods for Quality Control n Statistical.
Statistical Process Control
Statistical Process Control (SPC)
Operations Management
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Process Capability and SPC
Statistical Process Control
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 17-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 5: Process Performance and Quality Objectives: Understand.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Statistical Process Control Chapters A B C D E F G H.
Process Capability and SPC
Statistical Process Control
Process Capability and Statistical Process Control.
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 17-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 17.
Chapter 10 Quality Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Operations Management
Chapter 7 Statistical Quality Control. Quality Control Approaches l Statistical process control (SPC) Monitors the production process to prevent poor.
© 2003 Prentice-Hall, Inc. Quantitative Analysis Chapter 17 Statistical Quality Control Chap 17-1.
Statistical Process Control
Statistical Quality Control/Statistical Process Control
Statistical Quality Control
Statistical Process Control. A process can be described as a transformation of set of inputs into desired outputs. Inputs PROCESSOutputs What is a process?
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
Statistical Process Control. Overview Variation Control charts – R charts – X-bar charts – P charts.
CHAPTER 7 STATISTICAL PROCESS CONTROL. THE CONCEPT The application of statistical techniques to determine whether the output of a process conforms to.
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
Quality Control  Statistical Process Control (SPC)
1 1 Slide © 2003 South-Western/Thomson Learning™ Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
Chapter 6 Quality Management. Types of Quality to Consider User based qualityUser based quality –Eyes of the customer, sometimes not measurable Product.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
OPSM301 Operations Management Spring 2012
36.3 Inspection to Control Quality
POPULATION VERSUS SAMPLE
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Statistical Process Control (SPC)
10 Quality Control.
10 Quality Control.
Statistical Process Control
Statistical Process Control
Statistical Quality Control
Presentation transcript:

Chapter 5 Quality Control

Quality Control Purpose: monitor and maintain quality levels of products/services/processes, and try to improve product/service/process designs in ways that result in better quality products, services, and processes Quality Control Departments: Traditional focus  inspections Newer focus  quality training, improvements, working with suppliers, few inspections

Quality Control Process variation causes a process to be less consistent, resulting in lower quality W. Edwards Deming  2 causes of variation Common causes: normal (typical) variation, inherent to the process, difficult/expensive to reduce; example– a machine is not very accurate because it is old Special causes: due to a specific problem, not inherent to process, usually easy/cheap to fix; example– a machine’s quality level is lower one morning, and after you investigate you discover that operator has hangover To improve quality, identify and fix special causes of variation first (low hanging fruit)

Process Variation 2 different machines can do the same operation. Which should be used? 10,000 units of a gear shaft needed – set up machine and do test run of 100 units. 9.00 9.05 9.1 9.15 8.95 8.9 8.85 specs diameter (mm) machine A 20% out of spec

Process Variation Which should be used, machine A or machine B? 9.00 9.05 9.1 9.15 8.95 8.9 8.85 specs diameter (mm) machine B 50% out of spec

Quality Control Throughout Productive Systems Raw Materials, Parts, and Supplies Production Processes Products and Services Acceptance Tests Control Charts Quality of Inputs Monitoring Quality of Partially Completed Products Outputs Conversion

Monitoring Process Quality Run Diagrams  useful when starting a process (most likely time for errors) measure every piece plot measurements look for outliers and patterns to investigate process is in-control if no outliers or patterns (just typical randomness)

Run Diagram—1st Attempt Outer Diameters of 30 Pieces

Run Diagram—2nd Attempt Outer Diameters of 30 Pieces

GP4890 ROSEBURG FOREST PRODUCTS SHIPPING TEMPERATURE 1/21/93 – 2/15/93

Control Charts X chart and R chart when measuring a variable (e.g., length, weight, volume, viscosity) assumes normal distribution of sample means X is the measurement of one unit X is the mean measurement of one sample X is the expected value of the measurement R is the range of one sample (high – low) R is the expected value of the range

Control Charts p chart when measurement has only two outcomes (e.g., yes/no, defective/nondefective, good/bad) assumes binomial distribution p is fraction or percent of bad parts in a sample p is the expected value of p

Control Charts c chart when measuring the total number of defects in a sample sample size is 2 or more units assumes Poisson distribution c is number of defects in a sample c is the expected value of c

Control Charts u chart when measuring the number of defects on one unit sample size is one unit assumes Poisson distribution u is number of defects on one unit u is the expected value of u only difference between u and c charts is sample size (1 or many)

Control Limits X chart – for sample means Upper control limit (UCL) = X + AR Lower control limit (LCL) = X – AR X = expected value of X (average over many samples) R = expected value of R (average over many samples) A = a constant from Table

Control Limits R chart – for sample ranges UCL = D2R LCL = D1R D1 and D2 are constants from Table

Control Limits p chart – for fraction/percent defectives in sample p = expected fraction/percent defectives in samples n = size of one sample (number of units)

Control Limits c chart – for total number of defects in a sample c = expected number of defects in samples X and R chart example: Suppose a company wants to start using X and R control charts. They have collected 25 samples of 5 units in each sample to estimate X and R.

Sample # 1st unit 2nd unit 3rd unit 4th unit 5th unit Average X-bar Range R 1 10.60 10.40 10.30 9.90 10.20 10.28 .70 2 9.98 10.25 10.05 10.23 10.33 10.17 .35 3 9.85 10.15 10.07 .40 4 10.10 9.95 10.09 5 10.24 10.50 10.31 .30 6 10.16 7 10.12 .50 8 10.27 9 10.34 10 11 9.50 10.35 .85 12 10.36 9.80 10.14 13 10.70 .80 14 15 10.54 10.55 10.00 .55 16 10.29 .60 17 10.80 10.42 18 9.96 1.00 19 10.22 20 10.38 21 9.60 22 23 9.88 24 10.18 25

Compute Control Limits X chart: for n=5 in Table (p.671), A=0.577 UCL,LCL = ± A( ) = LCL = and UCL = X R R chart: for n=5 in Table, D1=0 and D2=2.116 LCL = D1 = UCL = D2 = R R

X Chart UCL 10.56 LCL 9.86 X=10.21

R Chart LCL=0 UCL=1.27 R=0.6

Control Chart Problems to Investigate

GP4890 ROSEBURG FOREST PRODUCTS % CAUSTIC 1/15/93 – 2/13/93 UPPER CONTROL LIMIT LOWER CONTROL LIMIT 3 2.5 2 1.5 1 0.5

p Chart Example Process  placing labels on jeans Label placement is either defective or non-defective. Typically, about 1.5% of labels are considered defective. Compute control limits for a p chart, with sample size = 200. If a sample has 6 bad labels, is this in-control?

c Chart Example Twice a day, Ford takes a sample of 5 cars after the painting operation to count the number of bad spots on the freshly painted surfaces. The typical number of defects per sample is 3.1 bad spots. Compute 3σ control limits.

Good/Bad & Investigate or Not Above UCL Below LCL X chart R chart p chart c chart u chart

Guidelines for Determining Which Control Chart to Use Identify the item or product to be evaluated for quality. What characteristic is to be measured? Should every item be checked, or should a random sample be taken? Is the characteristic measured on a continuous scale? Is the item either good or bad, or is the number of defects on one item important? Should the random sample size be one unit, or should it be more than one unit?

Control Chart Examples 1. A local building contractor builds large custom homes. He wants to use a control chart to monitor the number of problems that customers find in the finished homes. What type of control chart should be used? 2. A manufacturer of semiconductors chips plans to use a control chart to monitor the quality of chips they produce. Due to the complexity and density of circuits on each chip, typically 5% to 15% of the chips are faulty, which is about normal for the industry. Faulty chips are returned by customers for a full refund or replacement. What type control chart should be used? 3. A professional proofreader checks manuscript pages for typing errors. What type of control chart should be used to monitor the quality of their proofreading?

Control Chart Examples 4. As cereal boxes are filled in a factory they are weighed for their contents by an automatic scale. The target is to put 10 ounces of cereal in each box. What type of control chart should be used to monitor how well they are achieving their target? 5. What type of control chart should Microsoft use to monitor the quality of their software programmers in developing computer code for assigned portions of larger software products? 6. What type of chart should a business school use to monitor the quality of incoming MBA students based on GMAT scores?