Eight Basic Quality Improvement Tools – Part 2 Quality Engineering and Quality Management 1 © University of Wisconsin-Madison.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

East Central Regional Hospital
Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
By: Dr. David L. Goetsch and Stanley Davis Based on the book
Basic Seven Tools of Quality
Seven Quality Tools The Seven Tools
IE673Session 5 - Process Management1 Process Management.
Agenda Review homework Lecture/discussion Week 10 assignment
Tumolo’s Toolbox 7 Step Improvement Process.
1.Explain product quality and quality management 2.Explain roles of various business functions in determining product quality 3.Describe core values and.
Goal Sharing Team Training Statistical Resource Leaders (1)
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 13 Tools for Process Improvement.
Chapter 10 Quality Improvement.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
1 Chapter 13 Tools for ProcessImprovement. 2 The Deming Cycle Plan DoStudy Act.
1 Continuous Improvement. 2 1.Overview of the PDCA Problem Solving Cycle. 2.Foundations of the PDCA Cycle 3.Plan Step 4.Do Step 5.Check Step 6.Act Step.
TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Quality Improvement: Problem Solving Quality Tools and Techniques.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Methods and Philosophy of Statistical Process Control
Overview of DMAIC A Systematic Framework for Problem Solving
TTMG 5103 Module Techniques and Tools for problem diagnosis and improvement prior to commercialization Shiva Biradar TIM Program, Carleton University.
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Tools for Process Improvement
1 DSCI 3123 Quality Management and SQC Outline Quality Control –Definition of Quality –Commonly Used Terms –TQM –Seven QC tools –Variance reduction –Control.
© 2005 Wiley1 Total Quality Management Chapter 5.
Quality Control Tools A committee for developing QC tools affiliated with JUSE was set up in April Their aim was to develop QC techniques for.
Overview of Total Quality Tools
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Tools and Techniques for Performance Excellence
Quality Management Processes Plan Quality Management Perform Quality Assurance Control Quality.
Chapter 5 – Part 3 The TQM Philosophy. Mini Case: Quality Improvement LSL USL X = Amount of Toner Toner Operation: Adding Toner to Cartridge Current Process.
A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction. Customer satisfaction.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 10 Quality Improvement.
Problem Solving.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Sort the graphs. Match the type of graph to it’s name.
Measure : SPC Dedy Sugiarto.
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
PROGRAM DEVELOPMENT CYCLE. Problem Statement: Problem Statement help diagnose the situation so that your focus is on the problem, helpful tools at this.
Chapter 11 TQM & Quality Tools. Management 3620Chapter 11 TQM and Quality Tools11-2 Total Quality Management A philosophy that involves everyone in an.
OM7a -1TQM and Quality Tools Chapter 11 TQM & Quality Tools.
Introduction to Quality Improvement Tools We are what we repeatedly do. Excellence, then, is not an act but a habit. ARISTOTLE.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
Total Quality Management. What is Quality? Quality is a relative concept. Quality is in the eye of the beholder Perfection Doing it right at the first.
Organize verbal information into a visual one, generally by writing down on separate pieces of paper AFFINITY DIAGRAM A sequenced plan.
© Wiley Total Quality Management by Adnan khan.
Traditional Economic Model of Quality of Conformance
Chapter 13 Tools for Process Improvement MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1.
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
1 Project Quality Management QA and QC Tools & Techniques Lec#10 Ghazala Amin.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
Data Collection & Analysis ETI 6134 Dr. Karla Moore.
| +44(0) © ICE LTD 2009 All rights reserved. August 2009 version 1.3 Systems Thinking Facilitators.
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
QUALITY MANAGEMENT II Total Quality Management. LEARNING OBJECTIVES …to understand the concept of Total Quality Management …to be able to use the tools.
New 7 QC tools By Shuai Zhang Kun Wang.
8.1 Plan Quality Management
Quality Management and SQC
Managing Production Operations Reading: pp. 279 – 299.
Total quality management
Fundamentals of Statistical Process Control
Agenda Review homework Lecture/discussion Week 10 assignment
Six Sigma. Six Sigma What is Six Sigma? Philosophy: We should work smarter, not harder. Business strategy: We gain a competitive edges in Quality,
Quality Improvement: Problem Solving
Process Capability.
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Chapter 10 Quality Improvement.
Presentation transcript:

Eight Basic Quality Improvement Tools – Part 2 Quality Engineering and Quality Management 1 © University of Wisconsin-Madison

2 What are Flowcharts? A flowchart is a pictorial representation of a logical decision process, which identifies all of the major steps and decision points involved in progressing from the beginning to the end. Flowcharts provide a global overview of a “procedure” clearly identifying how each step is related to the others in order to accomplish a particular objective. Begin Step 1 Decision 1YesNo Step 2End Etc.

3 Why Use Flowcharts? To better understand and agree on what the process is in terms of actions and decision points To communicate the flow” of complex processes To determine how the process currently works To determine how the process should work To identify “waste” and opportunities for improvement

4 When to Use Flowcharts? Frequently the first or second step a project team uses. Particularly important for service areas. Flowcharts are typically used during the planning phase of the PDCA problem solving process.

5 What are Cause and Effect (CE) Diagrams? A cause-and-effect diagram is used to show the relationship between some “effect” (problem) and all the possible causes influencing it. By organizing the possible causes in this way, the team can IDENTIFY, EXPLORE, and DISPLAY all of the possible causes of a specific problem or condition.

Example: CE (Fishbone) Diagram Order Entry Error Rate MethodManpower MaterialMachinery Procedures Not Defined Five Depts. Are Involved Poor Communication Second Shift Errors No Customer Call Back Lack of Training No Team Spirit Supervisor #2 Attitude Problem Order From Not Current Purchase Rep. Retired Replacement Not Trained Terminal Key Sticking Lack of Maintenance Printed Orders Hard to Read Old Printer CAUSESEFFECTS

7 Why Use a CE Diagram? Creating a cause and effect diagram is educational It helps a team focus on the issue at hand. It results in an active search for causes. It presents a good graphical layout of the “whole” problem. It’s a way to get at the possible causes of a problem.

8 When to Use a CE Diagram Cause & effect diagrams can be used for defining the causes of any kind of problem! They are used primarily in the planning phase of a problem solving process:

9 What are Scatter Diagrams? Scatter diagrams show the relationship between two factors in a process. Values for one factor are listed on the vertical axis; values for the other factor are listed on the horizontal axis. Points are plotted where their values meet, and the pattern is analyzed to determine the relationship, or correlation, between the factors.

10 Why Use Scatter Diagrams? Scatter diagrams are used to determine if relationships between variables exist in a process. e.g., Are the time it takes to get to work and the time I leave for work related?

Scatter Diagram of Commuting Time 6:00 15 min. 25 min. 10 min. 20 min. 30 min. Time leaving house Travel time to work 7:008:009:00

12 When to Use Scatter Diagrams Scatter diagrams are typically used during the planning phase of the PDCA problem solving process to analyze factors (variables of interest) and determine their relationships (if any).

13 Example of Scatter Diagram Gas Time Core Tensile Strength SO 2 Core Making on Redford 16

14 Compactability Mold Hardness G.S. Molding Example of Scatter Diagram

COMMON PITFALLS: Failing to properly stratify the data Stratified Unstratified x x y y First shift Second shift                             

COMMON PITFALLS: Failing to identify range related correlation –A Correlation may exist in a smaller or larger range than the data set. X Y Correlation

Peaks and Troughs x y x y A' A A

18 Green Sand Compactability LSL USL Stratification Example #2

Green Sand Compactability LSL USL nd Shift USL LSL 1st Shift Stratification Example #2

20 What are Run Charts? Production Days in May Number of castings scrapped due to blows Average

21 Why Use Run Charts? Shows the past, present, and what is “expected” in the future. It focuses attention on trends (compares past performance to present and predicts future) and ranges (how stable our performance is). Can be very motivating, attention-getting, and used to emphasize points which are important and provide feedback on project progress!

22 Why Use Run Charts? Helps us see the effect of improvements over time on process performance. Easy to visualize and understand. Shows us how well we are doing in reaching a desired target level. “A picture is worth a thousand words.”

23 When to Use Run Charts Run charts are typically used during the plan and check phases of the PDCA problem solving process. During the planning phase, run charts are useful when collecting data to look for trends, ranges, and potential causes affecting performance. During the check phase, run charts are useful to help monitor results, display process goals, inform and motivate people.

What to Look for in Run Charts TRENDS CYCLES

What to Look for in Run Charts Runs

26 What are Process Control Charts? Product Quality Characteristic Measurement over Time UCL LCL X Out of Control

27 Process Control Charts X-Bar Chart Time Upper Control Limit = UCL Lower Control Limit = LCL 3x3x 2x2x 1x1x X-bar 1x1x 2x2x 3x3x

28 Why Use Control Charts? Learn About Process – Gain process information and knowledge – Improve process productivity Achieve Stable, Predictable Process Performance – Shifting from what has happened to what will happen – Reduce waste (scrap, rework, etc.) Control charts determine statistically (based on data) when the process is out of control and when some type of controlling action should be taken. This has many benefits:

29 Why Use Control Charts? Measures the Results Against Realistic, Meaningful Measures of Past Performances – Not somebody’s idea of what the performance should be – Take emotion out of the decision-making process, e.g.,

30 When to Use Control Charts Control charts are typically used during the plan, check, and act phases of the PDCA problem solving process to gain insight into how a process is performing and why. They are extremely useful for monitoring critical quality characteristics of a process in order to prevent defects from occurring… ”Do it right the first time!”