Wet Area Linings Part 1 - Linings M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007 M. Martin Feb, 2005 Reviewed Feb, 2006 & 2007
Types of lining materials Handout, CSR Fibrous Cement Sheet Wet area plasterboard Hardies ‘tilebacker’ newer product variation of FC sheet
Methods of cutting FC sheet Score & snap knife Hand guillotine Hand saw
Other Methods Hand Guillotine Hand saw
Circular Saw with dust extraction
Forming holes in FC sheet Larger holes Score around perimeter of opening Form large hole in centre Saw cut from hole to corners Support edges & snap away
OH&S Always ensure area is well ventilated Always wear appropriate PPE
Control joints Tiled areas, not more than 4.2m spacings. Non-tiled areas, not more than 7.2m spacings. Based on CSR product
Wall sheet fixing FIG 3. THERMAL BRIDGING ON STEEL FRAMING.
Tiled area fixings In tiled areas what must not be used ??? Copy answer in worksheets If using FC sheet in tiled areas, the use of stud adhesive is NOT acceptable