Nocturne (An On-Line Supplier Managed Owned Inventory tool) Presentation to supplier - part I Nocturne™ is an affordable, user-friendly breakthrough.

Slides:



Advertisements
Similar presentations
Bringing Visibility and Control to Your Operations.
Advertisements

Problem identification  Slow workflow  No data transfer  Mistakes during work.
Our transport management solution is designed to enable the effective and efficient management of the delivery of goods within the supply chain. Having.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Resource Planning Chapter 14.
Supply Chain Management
CHAPTER 1- INTRODUCTION TO SUPPLY CHAIN MANAGEMENT
Supply Chain Management
ChemConnect Leading in negotiation solutions for commercial products.
M ERP (Enterprise Resources Planning) M ERP (Enterprise Resources Planning) Session 6 Production and Operation Information System Ir. Ekananta.
Value Chain and IS/IT V.T. Raja, Ph.D., Information Management Oregon State University.
Value Chain and IS/IT Discussion questions based on reading assignment –What is the Value Chain (VC)? –Identify the activities of the VC. –How is the “service”
Value Chain and IS/IT Discussion questions 1.What is the Value Chain (VC)? 2.Identify the activities of the VC. 3.How is the “service” activity different.
Enterprise Systems ERP, SCM, CRM – Overview How do information systems improve enterprises?
Supply Chain Management
Production Scheduling: What Tool is Right for You?
BSIT 4106 Airline Travel System 11 – A.  The goal of the study is to develop an automated procurement and inventory system  The system will focused.
Production Logistics and ERP
E-Commerce and Supply Chain Management (SCM)
Supply Chain Management COSC643 E-Commerce Supply Chain Management Sungchul Hong.
1568acgproposal.ppt 1 Atlanta OAUG June 19, 1998 Supply Chain Management Tim Boyle, CFPIM, CPM AnswerThink Consulting Group, Inc.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
12-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
MATERIAL REQUIREMENTS PLANNING (MRP) AND ERP Chapter 14 1.
Enterprise resource planning (ERP): An expanded effort to integrate marketing, financial, manufacturing and human resources in a single information system.
Key questions answered in this chapter:  What are the four stages to the evolution of B2B capabilities?  What are the three categories of B2B?  Describe.
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Supply Chain Management Common Learning Block I Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the.
INFORMATION X INFO102: Management Information Systems CRM and SCM.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Chapter 4. Chapter 4 Learning Objectives Describe steps in the production planning process of a high volume manufacturer like Fitter Snacker Describe.
Carnegie Mellon University © Robert T. Monroe Management Information Systems Supply Chain Management Systems Management Information.
Inventory/Purchasing Questions
Distribution Requirements Planning Logistics Workshop Asia 2004 Phnom Penh, Cambodia 10 – 14 May 2004.
ORF Electronic Commerce Spring 2009 April 6, 2009 Week 9 Supply Chain Management Can’t talk about e-commerce without discussing the process by which.
1 Operations Management MRP Lecture 22 (Chapter 14)
1 MARK10 SUPPLY CHAIN MANAGEMENT Agenda Housekeeping & Field Trip details What in the World is going on? Lecture Chapter 1 Form Teams Homework.
MANGT 660 (A): Supply Chain Planning and Control Chapter 12 Manufacturing Focused Supply Chain Integration (2/2)
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
OM6-1Supply Chain Management Chapter 12 Supply Chain Management.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Intelligent Supply Chain Management Course Transportation Scheduling
Global Manufacturing and Supply Chain Management
Chapter 12 Global Production, Outsourcing, and Logistics.
Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 1-1 JAMES R. STOCK  DOUGLAS M. LAMBERT STRATEGIC LOGISTICS MANAGEMENT.
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
Management Information Systems Islamia University of Bahawalpur Delivered by: Tasawar Javed Lecture 9.
Case Study 2: Operate a Logistics Company EIN 6133 Enterprise Engineering Fall, 2015.
Enterprise Resource planning. Example Imagine that you organize a party by next month to celebrate your birthday, and analyze the things you do for that.
SchedulingProducingControllingSchedulingProducingControlling.
© 2008 Prentice Hall, Inc.14 – 1 Operations Management Chapter 14 – Material Requirements Planning (MRP) and ERP PowerPoint presentation to accompany Heizer/Render.
INTRODUCTION TO SUPPLY CHAIN MANAGEMENT. What is a Supply Chain? A supply chain consists of the flow of products and services from: Raw materials manufacturers.
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
QAD Demand Management Patrick Grace, QAD Solutions Consultant September 27th, Fall MWUG Session.
Wholesale Distributors Campaign Briefing
Facility Inventory Old Facilities Modern Facilities Classroom Size
Introduction to Global Supply Chain Management Module Four: Product Sales, Distribution & Customer Relationship Management.
UNIT –V SUPPLY CHAIN MANAGEMENT
Management Information Systems
5th Edition.
Common Learning Blocks
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
Topic 6 – Logistics and Supply Chain Management
Material Requirement Planning (MRP)
Accounts Receivable and Inventory Management
Supply Chain Management
Operations Management
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Nocturne (An On-Line Supplier Managed Owned Inventory tool) Presentation to supplier - part I Nocturne™ is an affordable, user-friendly breakthrough in logistics management. Nocturne™ software expands communication between buyers, suppliers, shippers and receivers. Nocturne™ allows you to know exactly WHAT YOU HAVE, WHAT YOU NEED, WHERE YOU NEED IT AND WHEN.

and provided to supplier Data automatically down loaded out of ERP and provided to supplier by internet JIT information Daily material requirements moment Actual Stock Daily Goods movements 2nd. tier supplier 1st. tier supplier Final Assembly Anticipation information USL LSL Monthly ROFO based on market information Long term planning Finished products components subassemblies Final assembly installation Sales & service Business 1st. Tier supplier 2nd. Tier supplier

ERP Nocturne Buyer Supplier 3) ERP Program routes files to folder on server Server 4) Service provider transfers files firewall ERP Nocturne 5) Data auto loads to Nocturne. Emails for exceptions 2) Custom ERP programs extract data 6) SMI information available for Buyer and Supplier 1b) Buyer links part to supplier in Nocturne and sets limits Buyer Supplier

Select customer Daily report PMS 2003-11-24 intro Villa 30

Supplier Managed Inventory, Company Owned Demand forecast Company SMI SMOI Supplier Managed Inventory, Company Owned Supplier Managed and Owned Inventory Het daily report verschijnt.[click] Er wordt aangegeven dat de web pagina informatie geeft over de voorraad in geval van SMI.[click] Informatie geeft over de “consigned” voorraad staat op dezelfde pagina. De informatie die in beide velden staat is : Begin balance of begin voorraad. Net usage. Receipts. End balance. In de kolom “TOTAL staat de optelsom van de “end balance” in de en “consigned” voorraad. SMI willen wij gebruiken voor leveranciers die veel ( > 12 tot 15) codenummers leveren met een relatief lage waarde ( C en D artikelen met minder dan 2700€ omzet per jaar) SMOI is bedoeld voor leverancier met relatief dure onderdelen ( A en B artikelen met meer dan 2700€ omzet per jaar). Leveranciers die zowel A,B als C,D artikelen leveren zullen dus gebruik maken van de informatie in beide velden. 29

Weekly numbers Horizon 12 months Demand forecast PMS 2003-11-24 intro Villa 32

PMS 2003-11-24 intro Villa 34

End market dynamics visible in forecast waterfall report 33

Actual stock Part history USL LSL Company PMS 2003-11-24 intro Villa 41

Daily net usage Daily receipts Daily stock Company Daily net usage Daily receipts Daily stock Company PMS 2003-11-24 intro Villa 42

Graph supplier performance Company PMS 2003-11-24 intro Villa 43

End balance USL Receipts LSL Net usage Company PMS 2003-11-24 intro Villa 44

Set specification limits Company Set specification limits Typical MRP schedule SMOI PMS 2003-11-24 intro Villa

Company PMS 2003-11-24 intro Villa 46

Company Transit history PMS 2003-11-24 intro Villa 47

Company

Possibility to track on serial number PMS 2003-11-24 intro Villa 49

SMOI Program Benefits Customer benefits: Supplier benefits: Assurance of supply supports factory OTD performance Lower inventory levels and improved asset utilization Process & tools reduce administrative effort for Purchasing and Financial Service Center Greater visibility into the inventory across the supply chain Real-time availability of forecast and consumption information Reduced administrative effort in terms of PO management and invoice processing Improved production utilization Local warehousing space and process support (SOI) Greater visibility into the inventory across the supply chain Competitive advantage With SOI, blocking of invoices is no longer a problem.