Environmental Compliance Negotiating our way through the process…

Slides:



Advertisements
Similar presentations
Notebook Ref 3.5. Tier 3: No Degradation in ONRWs Applies only to waters classified as Outstanding National Resource Waters (ONRW) This classification.
Advertisements

SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Streamlined Consultation Training Modules Module #1 - Frequently Asked Questions on the Section 7 Consultation Process Module #2 - An Overview of Streamlined.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Environmental Review: NEPA, TEPA and Tribes. NEPA – good and bad for Tribes Tribes can use as tool to slow, examine, participate in process and urge changes.
The Role of State, Local and Tribal Governments in the Federal NEPA Process Presented by Susan E. Bromm Director, Office of Federal Activities United States.
Utah Watershed Coordinating Council Conservation Planning Workshop Navigating the Corps’ Permitting Process July 20, 2011 Jason Gipson Chief, Utah/Nevada.
ARRT Update January Workgroup Commissioned in FEB 2011 “to ensure the AK Unified Plan complies with ESA section 7 consultation requirements” ESA.
U.S. Fish and Wildlife Service Ecological Services Utah Field Office.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Endangered Species Act
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Sacred Sites. Documentation Documentation: Forest Supervisor or Ranger District Offices may document Sacred site (s) information in a variety of ways.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
MassDOT P3 Project Overview. MassDOT Project Mobility.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
COSCDA Workshop Renovation, Reconstruction and Renewal of Historic Properties and Neighborhoods Section 106 and Programmatic Agreements Overview.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Module 4 Section 7 Interagency Cooperation. The Subtitle of Section 7: Federal Agency Actions and Consultations Credit: istockphoto.com.
Endangered Species Act Section 7 Overview Endangered Species Program, U.S. Fish and Wildlife Service 2001.
Endangered Species Act Section 7 Consultations. The Endangered Species Act Sec. 2:Purpose Sec. 3:Definitions Sec. 4:Listing, Recovery, Monitoring Sec.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Mitigation in the Section 106 Process Dave Berwick Army Program Manager Advisory Council on Historic Preservation.
L O N G B E A C H, C A. Dean McMath Regional Environmental Programs Manager FAA – Southwest Region NEPA Essentials Selected Special.
Positive Train Control Infrastructure: Section 106 Review Process under the Advisory Council on Historic Preservation’s May 2014 Program Comment For More.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
ODOE Presentations and EFSC Standards Presented by Max Woods and Sarah Esterson September 18, 2015.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Section 106: Historic Preservation Review and Compliance as it relates to the American Recovery and Reinvestment Act of 2009 “How Can State Agencies Assist.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
April 2006 Middle Fork Project Relicensing Process April 25, 2006
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Endangered Species Act 2005 Legislative Action. House of Representatives  On Sept. 29, 2005 the House passed H.R. 3824: Threatened and Endangered Species.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
SAFETEA-LU: Environmental Provisions for Transportation Planning Michael Culp FHWA Office of Project Development and Environmental Review
Army BRAC Historic Preservation Opportunities and Challenges.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Dispersant Workgroup Update May 20th th, 2015 CDR Bo Stocklin, USCG.
TOWARDS A COMMON GOAL Coordinating actions under the Clean Water Act (FWPCA) and the Endangered Species Act (ESA)
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
South Dakota State Historic Preservation Office and the Nebraska National Forests and Grasslands July 24, 2013 National Grasslands Visitor Center.
Suzanne Derrick Technical Director – Cultural Resources FCC Section 106 Process and the Archeology of Tower Siting Panelist Presentation May 4, 2016.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
FCC’s NEPA Process Overview of NEPA Overview of NEPA Overview of FCC’s NEPA rules and procedures Overview of FCC’s NEPA rules and procedures Nuts and bolts.
Environmental Issues Update - Endangered Species 1.
The National Register. The National Register of Historic Places The National Register of Historic Places is authorized by Section 101 (a)(1)(A)of the.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
Barriers and Challenges to Developing Renewable Energy Projects
FCC’s NEPA Process Overview of NEPA
Endangered Species Act
Regulatory Update June 14, 2018.
National Environmental Policy Act (NEPA)
Cultural Resources Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
The Role of the SHPO John Pouley, Assistant State Archaeologist
The National Environmental Policy Act (NEPA)
NEPA Assignment Program Overview
Presentation transcript:

Environmental Compliance Negotiating our way through the process…

Overview of Environmental Process for this Project NEPA Corps of Engineer’s CWA (404 permit) Section 106 of the National Historic Preservation Act Compliance Tribal Consultation Section 7 Consultation Other Criteria

NEPA Analysis Will this project have a significant impact on the Human environment? Site specific Environmental Evaluations Supplement existing State CREP Environmental Assessments

Corps of Engineers 404 Permit Expand Regional Permit 34 Special conditions needed to comply with Regional Permit 34: Section 106 of the National Historic Preservation Act Compliance State Historic Preservation Officer (SHPO) Consultation Tribal Consultation Section 7 of the Endangered Species Act Compliance

Section 106-SHPO Consultation Consult with SHPO to determine if Historic Properties may be affected FSA makes a finding of No Historic Properties Affected or Historic Properties Affected If SHPO concurs with FSA No Historic Properties Affected; time frame is up to 30 days If SHPO does not concur with FSA or if FSA determines there are historic properties that are likely to be affected, additional consultation is required - time frame at least 30 days, could be much more

Section 106-Tribal Consultation - if the project is on Tribal lands We must also consult with Tribes that attach religious and cultural significance to historic properties whether they are on or off tribal lands (i.e., ancestral or ceded lands) may take much more then 30 days, if on Tribal lands (Tribal governments may not follow the 30 day time frame) You also must consult with the SHPO at the same time with the typical time frame of 30 days+

Section 7 Informal Consultation Is threatened and/or endangered species and/or critical habitat present? FSA requests or prepares list threatened and/or endangered in project area and sends to USFWS USFWS either concurs with FSA list or supplies list to FSA - 30 day response time USFWS determines: No species and/or critical habitat present - end consultation Yes, Options: Further Consultation with FWS: USFWS issues no effect determination - time frame unknown FSA Prepares Biological Assessment 180 days to prepare FWS has 30 days to respond to assessment

Section 7-Formal Consultation FSA requests initiation of formal consultation Once clock starts, FWS in consultation with FSA formulates a Biological Opinion and incidental take statement - 90 day time frame FSA reviews draft biological opinion- comments and then FWS delivers final biological opinion and incidental take statement - 45 days

Other Regional 34 Permit Criteria Additional state specific environmental compliance criteria such as; specific design criteria or other State permits depending on type of project implemented and proximity to streams, etc. State regulatory requirements can be done concurrently with the NEPA and consultation processes

Success through collaboration Lessons learned from Iowa Develop MOUs, state level agreements, or other mechanisms to facilitate intra- agency cooperation Start the NEPA process early to aid decision-makers National impact through local actions