IMPLEMENTATION OF WHOLE SCHOOL DEVELOPMENT PLAN IN SCHOOLS OF GUJARAT

Slides:



Advertisements
Similar presentations
Risk Assessment and Mapping Experiences through DIPECHO in Central Asia Regional Consultative Meeting November 2009 Bishkek, Kyrgyz Republic.
Advertisements

SARVA SHIKSHA ABHIYAN Implementation of RtE-SSA in DELHI
BY DR. VIJAY P. SINGH SPECIAL STATE PROJECT DIRECTOR SSA/RMSA DELHI Role of Principals/Vice Principals (HoS) in Implementing SSA and RMSA.
PROMOTING A COORDINATED GROUNDWATER MANAGEMENT FOR LAGOS STATE: WAY FORWARD By PROFESSOR E.O. LONGE, PhD FACULTY OF ENGINEERING DEPARTMENT OF CIVIL & ENVIRONMENTAL.
 Assess the existing status of implementation of ICDS in terms of coverage, out reach, coordination, convergence, and innovations;  Study the differences.
“The Primary Goal of the Cleveland Metropolitan School District is to become a premier school district in the United States of America.” The Cleveland.
Environmental Assessment Survey of School Building.
Japanese Experiences in Urbanization & Urban Planning System in Japan JICA Expert Kenichi WAKAMATSU 23 Aug.2001 Jakarta.
CUMULATIVE PROGRESS (PHYSICAL STATUS) State:DELHI S. No.Activities Targets till date (Units) Cumulative Completed (Units) Cumulative In Progress (Units)
NRHM DISTRICT ACTION PLANS PARTICIPATORY & EVIDENCE BASED PLANNING PROCESS.
Project HEART Transition Monitoring Challenges and Successes of Monitoring Health System Capacity August 12, 2010 Rozalin Wise.
HEALTH TARGETS FOR AUSTRIA health targets for Austria In 2012 health targets for Austria were approved by the Austrian Council of Ministers and.
Kabir Vajpeyi, Advisor Infrastructure, SSA
WELCOME. DISTBPLAPLSCHAW SOUTH WEST DHALAI NORTH TOTAL SANITATION CAMPAIGN IN TRIPURA.
By Satish Girotra Implementation of school infrastructure.
APPRAISAL AWP&B Introduction : - District plans need to be prepared in a such way that it has basic data available for appraisal. If the plan.
Discussions in 20th CW review meeting of SSA KEY DEVELOPMENTS SINCE LAST 19 TH CIVIL WORKS REVIEW.
State level launching of Gaon Swsthya Samikshya Programme
Water, Sanitation and Hygiene (WASH) in All Schools
INSPIRING PROGRAMMES AND CASE STUDIES : zimbabwe Addressing Challenges and responding to local Needs in a resource constrained environment.
WELCOME. WHY SANITATION ? WORLDWIDE 3.4 MILLION PEOPLE DIE DUE TO WATER RELATED DISEASES 2.2 MILLION DIE EACH YEAR DUE TO DIARRHOEAL DISEASES ALONE SOUTH.
Ministry of Works & Human Settlement Royal Government of Bhutan.
1 INCREASING ACCESS TO EMERGENCY OBSTETRIC SERVICES : EXPERIENCES FROM RAJASTHAN, INDIA Presenter: Hemant Dwivedi Authors : Venkatesh Srinivasan Hemant.
SAAAF Schools Campaign Sanitation Awareness, Assessment and Action for Schools Campaign MEDAK 2006 RWS/TSC-Medak UNICEF CEE SSA.
Integrated District Health Planning Madhya Pradesh.
Guidelines for School Sanitation Reward Scheme Rural Development Department & Education Department Government of Himachal Pradesh.
SCHOOL INFRASTRUCTURE SURVEY
WSDP Whole School Development Plan
Planning a World-Class Greenway System for Greenville County Presented by: Charles A. Flink, FASLA President Greenways Incorporated.
Welcome to Sharing Meet on InSTEP in Arizona, USA.
STATUS OF INCLUSIVE EDUCATION, ACCOMPANYING CHALLENGES AND STRATEGIC RESPONSE Presentation to PC on Basic Education 9 November
Environmental Assessment Survey of School Building Sarva Shiksha Abhiyan Mission Gujarat State Annexure-VI.
Disaster Preparedness and Prevention Initiative for South Eastern Europe DPPI SEE Seminar on Strengthening Cooperation with Candidate Countries and Western.
PRESENTATION ON CIVIL WORKS
PARAMETERS, STRENGTH & ISSUES FOR LOW PERFORMING STATE BIHAR AS ON
FOURTEENTH JOINT REVIEW MISSION 18 TH TO 28 TH JULY 2011 (Recommendations)
INDIA SARVA SHIKSHA ABHIYAN Fourteenth Joint Review Mission 18 th to 28 th July 2011 Recommendations.
Project Launch Workshop: New Delhi, May 9-10, 2013 CHHATTISGARH ICDS Systems Strengthening and Nutrition Improvement Project.
Village Microplanning : Vehicle for Decentralized District Planning Lessons from Maharashtra Presented To The National Advisory-cum-Review Committee on.
Full-Service Community Schools TASK FORCE Staff Lead: Jane Nicholson.
ASHA Sahyogini intervention in Rajasthan by Vaidehi Agnihotri
Evaluation Capacity building in Lithuania Presentation for Presentation for Evaluation Units Open days by Mrs. Ana Stankaitienė EU Programmes Management.
Group No. IV Total Sanitation Campaign – A way forward.
Click to edit Master subtitle style 6/8/12 Adaptation Research Flagship of the WPCC Parliamentary Portfolio Committee June 6, 2012.
1 4 th Review Mission Arunachal Pradesh (16 th to 22 nd November, 2012) Arunachal Pradesh (16 th to 22 nd November, 2012)
Project Launch Workshop: New Delhi May 9-10, 2013 State: ANDHRA PRADESH ICDS Systems Strengthening and Nutrition Improvement Project.
Jefferson County Agricultural Preservation and Land Use Plan Jefferson County’s Comprehensive Plan: Process and Strategies Presented to: Dane County Officials.
Helping Communities Protect Wildlife Habitat Emily Brunkhurst Wildlife Biologist NH Fish and Game Taking Action for Wildlife.
Process of Planning, Designing and Financing a Hospital
Project Launch Workshop: New Delhi May 9-10, 2013 State: Maharashtra ICDS Systems Strengthening and Nutrition Improvement Project.
ICDS Systems Strengthening and Nutrition Improvement Project Project Launch Workshop: New Delhi May 9-10, 2013 State: Bihar.
NAPA Experiences From the Kingdom of Bhutan NAPA Experiences From the Kingdom of Bhutan.
1 Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – Andhra Pradesh On
BACKWARD REGIONS GRANT CAPACITY BUILDING PLAN PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA.
Tilitonse Theory of Change and Expected Results Francis Matita Monitoring and Evaluation Manager.
Presentation for National Workshop/ Review Meeting of State Project Engineers/ Civil Works Coordinators Puri, Orissa Date : 16 & 17 November, 2011.
School transformation through Continuous and Comprehensive Evaluation(CCE) A journey from ideas to practice ……
1 The World Census of Agriculture 2010 Programme : a Modular Approach Jack Colwell Hiek Som FAO Statistics Division MEXSAI, November 2004.
Zero Waste Frame Works South Asia Shibu K. Nair Programme Director (Zero Waste) Thanal, India 6 th Zero Waste International Conference.
1 Mid Day Meal Scheme 4 th Review Mission – Chhattisgarh (26 th February 2013 to 2 nd March 2013)
Koumaran Pajaniradja Natural Disasters Management Advisor Ministry for Home Affairs – France Civil Protection – Department of Multi-Hazards Management.
4.4 Developing Tanzania REDD+ Safeguards Process and Lessons Learned.
Future Earth Summary of comments received and initial responses.
Project Launch Workshop: New Delhi May 9-10, 2013 State: Madhya Pradesh ICDS Systems Strengthening and Nutrition Improvement Project.
General process of discussion
Addressing Local Priorities in Primary Education – Issues & Perspectives Dipak Ray (OPEPA, D/O S & ME)
TEACHER SUPPORT.
Software for Estimate Calculation Using Rural Rates for Employment
Federal Disaster Recovery Coordination And Roles for
ICDS Systems Strengthening and Nutrition Improvement Project
Presentation transcript:

IMPLEMENTATION OF WHOLE SCHOOL DEVELOPMENT PLAN IN SCHOOLS OF GUJARAT

Enabling Conditions needed at National level Mandatory from MHRD Detailed guideline with norms given by MHRD for New School and existing school Urban Rural Few case study by MHRD. Region specific

Enabling Conditions needed at National level Sharing of responsibility to each unit (Pedagogy, Gender, IED, MIS, Civil, P&M etc.) by MHRD Time frame fixed by MHRD for state to prepare WSDP Quarterly appraisal by MHRD.

Enabling Conditions needed at State / District / Block level Separate structure for WSDP at State / District / Block level from within existing structure. Identify core group at each level Nominate WSDP coordinator at each level Involvement of all units (Pedagogy, Gender, IED, MIS, Civil, P&M etc.) Preparation of State / District specific broad guide line. Separate fund for management cost at State / District level . Provision of separate activity for WSDP in AWP & B to transform existing school in WSDP. Implementation through SMC

Stakeholders School level Children Community Teachers / Head Master / Retired teachers NRI / NGO / Ex. Student Local Experts.

Stakeholders Cluster level Block level CRG. Expert teacher within CRC. B.E.O. BRG Other Govt. Department like Revenue Forest Disaster 4)Health. Educational inst. NGO PRIS

Stakeholders District level State level DPE’O DRG Other Gov. Department DIET NGO PRIS State level Education Department SCERT SRG Other Department like DRDA , TSC , Water supply, Forest department, Disaster Management, Urban Development

Structure at Diff. level State / District / Block Engineer Architect Educational expert Other Experts School Teachers / Head Master SMC Community Local Expert.

Resource Material School level. SMC manual Inputs from different units School assessment format. Detailed WSDP. Specifications and Estimates Detailed Drawing (Before & after) Fund Classroom wise drawing of BaLA activity Corridor & outdoor space detail Rainfall Data Plantation guide line. Soil Data. Furniture options List of local available material /Skills

Resource Material District / Block level Standard norms for all activities School Assessment format Different type of design for various activities. Estimates with Drawing. List of local available material /Skills Soil strata Seismic Zone & other natural hazard details S.O.R DISE Data Plantation guide line BaLA activity Rain fall Data Convergent details Furniture options

Resource Material State Level School Assessment format.- improvement Different type of design options Estimate of activity Detailed BaLA drawing Soil Strata. Rainfall Data Seismic Zone & natural hazard details Convergence with other Department. DISE Data. S.O.R. Plantation patterns Furniture Options

WSDP New School Rural Urban Site Specific As per RTE Norms possible min. requirement to be met Provision for future requirement

WSDP Existing School Rural Urban School Specific As per RTE norms to the extent possible

Effective ways to Develop Finalization by MHRD and State. Orientation workshop at state, district, block, cluster level with the coordination of all units Preparation of Key Resource Persons / Resource persons at all levels. Hands on workshop at State / District and Block Level 4 Nos. of School in each block (urban / rural / new / existing School) as pilot District wise analysis Finalize WSDP

Time Frame Process finalization time – 90 Days Implementation of WSDP there after

Thanks