Chapter 8 Resource Considerations. 22 Learning Objectives Learn how to take resource constraints into account Determine the planned resource utilization.

Slides:



Advertisements
Similar presentations
Collaborating By: Mandi Schumacher.
Advertisements

TK3333 Software Management Topic 7: Schedule Control.
Chapter 7 Schedule Control
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
Scheduling
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management 6e..
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Chapter 8 Resource Considerations. 22 Learning Objectives Learn how to take resource constraints into account Determine the planned resource utilization.
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Business Studies Grade 11.
The Systems Analysis Toolkit Project Management Tools.
Chapter 9: Project Human Resource Management
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
VENDORS, CONSULTANTS AND USERS
6 Resource Utilization Teaching Strategies
Online and Mobile Banking. Online banking Online Banking  Online banking is a fairly established practice in our internet-saturated world.  Many people.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
Virtual Mechanics Fall Semester 2009
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Module 2.1 Finance and Administration Cabinet Organizational Changes and Agency Impact March
BTS730 Communications Management Chapter 10, Information Technology Management, 5ed.
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
© Pearson Education Copying permitted for purchasing institution only. This material is not copyright free. Functional areas Unit 1: Investigating.
Chapter 4 The Project. 2 Learning Objectives Third phase starts after a contract is drawn up and ends when the project objective is accomplished; final.
Chapter 11 Presentation Systems Implementation, Operation, and Control Computer System.
EDU MANAGER Presented By : us at :
Chapter 8 Resource Considerations
Chapter 1 Project Management Concepts. 22 Learning Objectives Definition of a project and its attributes Key constraints within which a project must be.
E-MARKETING (INTERNET MARKETING) Chapter – 2 Affiliate Marketing Program.
AGENDA Introduction to Virtual Mechanic Demo Architectural diagram and summary QA steps and user acceptance testing Bugs in the software Feedback from.
Utilities, Customers & SMS Rudi Leitner. Who in this room has a mobile phone? Who in this room has ever sent a text (SMS) message?
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Chapter 7: Project Human Resource Management IT Project Management, Third Edition Chapter 9 1.
Software Project Management
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 9 Project Management. Introduction Effective project management requires a well-structured project and diligent oversight A well-structured project.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
The Resource Problem Resources and Priorities
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
Scheduling Resources and Cost
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Chapter 1 Project Management Concepts
TK3333 Software Management
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Project Management. Introduction  Project management process goes alongside the system development process Process management process made up of three.
Copyright 2002 Prentice-Hall, Inc. Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich Chapter 11 Selecting.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
Chapter 11 Selecting the Best Alternative Design Strategy Modern Systems Analysis and Design Third Edition 11.1.
Financial Management Paish Tooth provides so much more than just an accounts preparation service which your business calls upon once a year. We like to.
HRM 323 ASSIST The power of possibility/hrm323assistdotcom.
6 Resource Utilization 4/28/2017 Teaching Strategies
SalesBabu CRM Ensuring Sales Success Combining the Benefits of cloud computing Technology With Client Management Portal.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Chapter 8 Resource Considerations
Scheduling Resources and Costs
44th Meeting of the Standing Committee Bonn, Germany, October 2015 Report on activities of the Strategic Plan Working Group Ines Verleye,
VENDORS, CONSULTANTS AND USERS
Chapter 5 Planning
Scheduling Resources and Costs
Presentation transcript:

Chapter 8 Resource Considerations

22 Learning Objectives Learn how to take resource constraints into account Determine the planned resource utilization for a project Level the use of resources within the required time frame Determine the shortest project schedule with limited resources

33 Real World Example Vignette: San Diego County moves toward e-government First year: replace 15-year old telephone system, old PCs, the data network, and several key software applications. Implement first ever countywide and voice mail systems. Second year: replace the outdated HR system and their old financial system. Develop data warehousing capabilities. Third year: provide an internet delivery channel for all county services, such as on-line permits and tax payments. A $644 million pact was approved, making this of of the most aggressive outsourced contracts by a U.S. local government.

Real World Example Vignette: Advice from an Expert – Barbara Perrier-Dreyer After numerous successful projects and awards, Barbara offers the following suggestions: –Spend plenty of time on up-front design and requirements –Ask technical leads HOW they will build the product –Make sure you can measure progress along the way –Test. Test. Test. –Give the team regular feedback –Have some fun and say thank you – a lot!

4 Resource-Constrained Planning Nearly all projects have limits on available resources. Project delays often occur due to certain resources being unavailable. A network diagram can be drawn to reflect the availability of a limited number of resources.

5 Planned Resource Utilization It’s necessary to indicate the amounts and types of resources needed to perform each activity. Resource utilization based on each activity’s earliest start time are based on an as-soon-as- possible (ASAP) schedule. Resource utilization charts based on each activity’s latest start time are based on an as-late- as-possible (ALAP) schedule.

6 Resource Leveling Resource leveling, or smoothing, is a method for developing a schedule that attempts to minimize the fluctuations in requirements for resources. This method levels the resources so that they are applied as uniformly as possible without extending the project schedule beyond the required completion time.

7 Resource-Limited Scheduling Resource-limited scheduling is a method for developing the shortest schedule when the number or amount of available resources is fixed and cannot be exceeded. This method will extend the project completion time if necessary in order to keep within the resource limits.

8 Project Management Software Provides excellent features for handling resource considerations within a project. Allows you to create and maintain a list of resources. Resources can be assigned to various tasks within a project. The user is informed if any resources have time conflicts or if they are over-allocated. Numerous resource allocation reports can be generated.