Lower Mississippi Valley Joint Venture Waterfowl Working Group Technical Subcommittee 12 January 2010.

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

The Biosafety Clearing-House of the Cartagena Protocol on Biosafety Tutorial – Text pages (Home - The BCH - The Protocol)
Process and Product Quality Assurance (PPQA)
Development of an Illinois Energy Efficiency Policy Manual A Proposed Process and Approval Plan Presented by: Karen Lusson Illinois Attorney General’s.
GAVI CSO SC Leadership Team Dhaka, Bangladesh November 2011.
Developing and Maintaining an Office Operational Calendar Presented by Zita Barree, Director of Financial Aid, Hampden-Sydney College Hampden-Sydney, VA.
Traditionally relied on MWI Random transect aerial survey –Reinecke et al. (1990) –Pearse et al. (2005) –State agencies continuing work MDWFP (2005-present)
Step 1: Valley Segment Classification Our first step will be to assign environmental parameters to stream valley segments using a series of GIS tools developed.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
PDS MC April 2-3, Wash. D. C.1 PDS4 Data Model Working Group Status Report to the PDS Management Council April 2-3, 2008.
Standard Operating Procedures – Case Management
Information for students (SNAF) Welcome to the S 3 P system. This PowerPoint will give you details of how to use the Student Notice of Absence Form (SNAF)
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
 Reforestation: the re-establishment of a forested land use on areas that were previously converted from a forested to non-forested land use  e-RTS 
The Information School at the University of Washington IMT 582 Readiness Assessment Bob Boiko UW iSchool ischool.washington.edu Metatorial Services Inc.
National Commission for Academic Accreditation & Assessment Preparation for Developmental Reviews.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Provider Human Rights Coordinator Role Accessing HCSIS to Support Human Rights Committee Reviews September 11, 2013.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Neuchâtel Terminology Model: Classification database object types and their attributes Revision 2013 and its relation to GSIM Prepared by Debra Mair, Tim.
Planning and Conducting An Investigation Deon Woods Bell U.S. Federal Trade Commission Livingstone, Zambia September The Fifth Annual African.
Use of OCAN in Crisis Intervention Webinar October, 2014.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
MERLOT PRESENTATION Northeast State Technical Community College A METHOD FOR ENSURING QUALITY IN ONLINE COURSES Dr. Tom Wallace – Director of Academic.
The views expressed are my personal views and do not represent positions of the FASB. Positions of the FASB are arrived at only after extensive due process.
Final Report on Improvements to the RAA Steve Metalitz 5 December 2010.
Long-Term Implementation Plan (LTIP) Building Decision and Operational Support of Appropriate Management Response (AMR)
Policy Considerations in the Lower Poplar River Turbidity TMDL Study Greg Johnson, Karen Evens, and Pat Carey, Minnesota Pollution Control Agency, St.
Lower Mississippi Valley Joint Venture Management Board Meeting the Expectations and Challenges of Joint Venture Implementation Buras, Louisiana June.
Proposed 2014 RTF Work Plan and 3-year Look Back October 21,
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
From a Study Design Assessment for Waterfowl Production Surveys on Tetlin NWR by Jonathan Greenberg (intern) and Joel Reynolds (former Regional Biometrician)
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Assessment of Portal Options Presented to: Technology Committee UMS Board of Trustees May 18, 2010.
Potential Target Method #4 Using Density and ETo Factors Tom Hawkins DWR U4 Technical Subcommittee Meeting August 25, 2010.
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 11/14/2013.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
San Jacinto River SB3 Instream Flow Literature Review May 2009 Update Presentation to: Trinity-San Jacinto BBEST May 13, 2009, UH Clear Lake Tim Osting,
eLearning projects October 4, 2013
1 Action Items for Management Board Challenges for Implementation of Recommendations.
Project Management Workshop James Small. Goals Understand the nature of projects Understand why Project Management is important Get an idea of the key.
GOVST-3, Paris, November 2011 GOVST Symposium, Review etc. Andreas Schiller, Eric Dombrowsky and Kirsten Wilmer-Becker.
CJK IMT 28 Xi’an, China 2-3 Jun CJK IMT 28, Xi’an, China 1/7 CJK-IMT Way forward on Chapter 4 of CJK White Paper by SIG-Future IMT ATARASHI,
<CUSTOMER> discovery and Transition.
PSCIOC/PSSDC XML Subcommittee Dave Wallace Corporate Chief Technology Officer Management Board Secretariat Ontario Government Glenn Sargant Chief Information.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
Pilot and Feasibility Studies NIHR Research Design Service Sam Norton, Liz Steed, Lauren Bell.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Dates in ILL Yoel Kortick Dates in ILL The purpose of this presentation is to show how the various date parameters work when performing borrowing.
Water.europa.eu Floods Reporting Drafting Group Progress report WG D Maria Brättemark WFD Team, DG ENV.D.1, European Commission.
Legal Text Production Options for Discussion. Legal Text Production 2 Issues with current approach Issues with the current approach to legal text production.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
Framework for Development of Technical Standard. Formation of the Technical Working Group(TWG) CCFF-India shall form a Technical Working Group(TWG) to.
National Standardization Secretariat ITU Regional Standardization Forum for Africa and SG5RG-ARF and SG5RG-AFR Meetings Livingstone, Zambia March.
Bow Basin Watershed Management Plan Revised Terms of Reference
Module 5: Communication Plan and Process for Addressing Barriers
Towards a Southeast-wide Conservation Planning Atlas
Vijay Mauree, Programme Coordinator ITU
IOF Event Overview Tool – status Feb 2018
LUCAS Task Force The way forward.
Guidelines for Establishing a National Standardization Secretariat
Streamlining of monitoring and reporting under WFD, Nitrates Directive and EEA's SoE –concept paper DG Environment.
Report of the Technical Subcommittee
U.S. NMFS contracts the CIE to review assessments
Presentation transcript:

Lower Mississippi Valley Joint Venture Waterfowl Working Group Technical Subcommittee 12 January 2010

Thanks again to Tim Kreher and KDFWR staff –Willingness to host –Any inconvenience –Willingness to host again Meeting cancellation –Blame is a pointless exercise, so I’ll take full responsibility We all probably could have done more Bad timing with holidays and surveys –We are where we currently are, let’s move forward Acknowledgement

Objectives for Today Status assessment for each subgroup with regard to action items Identify remaining tasks and a timeline for the next steps required of each subgroup Select a potential date for a follow-up meeting

Structure for Today Informal List action items and look to subgroup members to provide assessment and timeline –Most groups have made contact and initial progress –Is there a bottleneck and what can I/we do to remove it?

Action Item #1 “A subgroup consisting of [Tim] Kreher, Frank Nelson, and Gary Pogue was formed to investigate and report to the Technical Subcommittee on the efficacy of alternative options…for estimating and incorporating duration and frequency into our DED calculations.”

Action Item #1 Next Steps –LMVJV Office is providing period of record data for select stream gauges and help with geodatabases –Suggestions for stream gauges that would capture duration of flood events in your state should be sent to Frank, Gary, and Tim Heitmeyer table gauges included Red River in Louisiana Contacted Ed about Mississippi Timeframe?

Action Item #2 “A subgroup comprised of [Luke] Naylor, Ed Penny, and Dale James was formed to compare the state-specific MOP acreages and DED values from the 30 December 2003 scene with those values reported by Uihlein (2000) in his surveys of private managed lands in the MAV.” “This subgroup will also document the “square water” algorithm used by DU to classify MOP so the assumptions of that algorithm can be assessed and the algorithm can be applied to additional classified winter water scenes if they become available.”

Action Item #2 Status? Next steps? Help needed? Timeframe for completion?

Action Item #3 “A subgroup comprised of Reinecke and Paul Link was formed to investigate this simplification as well as other potential methods of incorporating disturbance into estimation of DED values on both private and public lands.” Status? Next steps? Help needed? Timeframe for completion?

Action Item #4 It was agreed by all that: 1)[Blaine] Elliott would develop a draft geospatial sanctuary database from available hunt maps and area brochures for all public lands 2)The state waterfowl biologists present (Link, Naylor, Nelson, and Penny) would review the portions of the draft sanctuary database relevant to their state lands 3)Tirpak and Naylor would coordinate with [Dan] Fuqua and Kreher for review of their respective states, and 4)Tom Edwards and Steve Reagan would coordinate review of the National Wildlife Refuge portions of the sanctuary database.

Action Item #4 Status?

Action Item #4 Status? Next steps? Help needed? Timeframe for completion?

Action Item #5 “The group agreed to perform ad hoc sensitivity analyses and provide feedback to Tirpak and the rest of the Subcommittee at the next meeting, provided Tirpak produce appropriate tools…where alternative parameter values could be input and model predictions output.” Status? Next steps? Help needed? Timeframe for completion?

Next Meeting Timeframe We should meet again when sufficient action has occurred within subgroups to allow decisions among clear alternatives to occur