ODOT – FHWA Environmental Performance Measures February 2012.

Slides:



Advertisements
Similar presentations
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Advertisements

Stormwater Management Initiative Update. ODOTs Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Managing Environmental Compliance for ODOT’s OTIA III State Bridge Delivery Program: Many Regulations – One Framework Michelle Eraut Environmental Program.
Oregon Jobs and Transportation Act Section 18
Coal Mining Activities Mark A. Taylor Huntington District Corps of Engineers.
Update on FHWA/FTA Proposed Rulemaking. MAP-21 Requirements Section 1318(a)(3) o Solicit requests from state DOTs, transit authorities, and MPOs, for.
Environmental Commitments Categorical Exclusion Training Class.
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
Environmental Compliance Negotiating our way through the process…
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Tribal Issues & Project Delivery Case Studies & Lessons Learned Federal Highway Administration Washington Division FHWA Environmental Meeting, June 29,
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
Wetlands and Waterways Permits Patti Caswell Statewide Wetlands/Permits Program Coordinator Geo-Environmental, ODOT.
Surface Transportation project delivery program
Ohio Department of Transportation ODOT Training & Environmental Prequalification Requirements questions to:
Module 15 Environmental Considerations Civil Works Orientation Course - FY 11.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
MassDOT P3 Project Overview. MassDOT Project Mobility.
BUILDING STRONG ® 1 Regional General Permit (RGP) 31 Interagency Meeting June 11, 2015.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
EDMS structure ODOT GIS Steering Committee EDMS Steering Committee EDMS RES/RAZ mapping Workgroup EDMS Data & Tools Workgroups EDMS proposes projects to.
Oregon Jobs and Transportation Act Section 18 External Stakeholder Meetings.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Stormwater Management Initiative Update. ODOT’s Goal Develop a streamlined stormwater runoff treatment program to: Develop a streamlined stormwater runoff.
Oregon Jobs and Transportation Act Section 18 Bill Ryan and Jennifer Sellers Geo-Environmental, ODOT Tech Services.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
ENVIRONMENTAL JUSTICE: FROM PLANNING TO PROJECT Ohio Planning Conference July 16, 2014.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
NEPA Environmental Procedure Pam Truitt, Grants Specialist  September 10, 2015.
Environmental Review Process for Responsible Entities 24 CFR Part 58 NEIGHBORHOOD STABILIZATION PROGRAM.
Community Context Audits And Public Involvement Plans Rickie Clark, INDOT Joyce Newland, FHWA Presenter Title, INDOT Event Date.
Wetlands and Waterways Permits Ken Franklin Statewide Permits Program Coordinator Geo-Environmental, ODOT.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
FEDERAL/STATE FUNDING EXCHANGE PROGRAM MICHELE RISKO, CEAO.
Section 4(f)/6(f) Categorical Exclusion Training Class.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Categorical Exclusion Training Class
Section 4(f) Categorical Exclusion Training Class.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Programmatic Agreements
Coal Mining Activities
Coal Mining Activities
Environmental Prequalification Requirements
Cultural Resources Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Section 4(f) Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Environmental Requirements and planning grants
2013 Preconstruction Managers Meeting
Presentation transcript:

ODOT – FHWA Environmental Performance Measures February 2012

ODOT – FHWA Environmental Performance Measures Today’s Presentation Will Include Measures that are required or are in place Measure recommended to be discontinued Other measures that may be useful and open discussion * Unless otherwise noted, the 2010 ODOT Geo-Environmental Annual Report is the data source.

ODOT – FHWA Environmental Performance Measures EIS Documents Completed in 2010 and 2011* ProjectNotice of IntentRecord of Decision Number of Months Sellwood Bridge Sunrise Columbia River Crossing Average120 *Data source is FHWA’s EIS and EA Database

ODOT – FHWA Environmental Performance Measures Active EIS Documents ProjectNotice of IntentAnticipated ROD* Anticipated Length in Months Newberg Dundee Bypass Tier May Highway March Salem River Crossing August Bend North Corridor November Anticipated Ave.74

ODOT – FHWA Environmental Performance Measures EA Documents Completed in 2010 and 2011 ProjectFONSI Date Weaver Road Fern Valley Active EA Projects ProjectAnticipated NEPA Completion Tillamook, US 101/OR 6December 2012 I-5, South Jefferson to US 20August 2013

ODOT – FHWA Environmental Performance Measures In Place or Required Categorical Exclusions Approved in 2011 In 2011, FHWA approved 51 CEs. The average approval timeframe was 9 days, meeting FHWA’s commitment in the CE guidance document of 2 weeks. In 2011, ODOT approved 61 programmatic (P)CEs.

ODOT – FHWA Environmental Performance Measures In Place or Required Mitigation method percentages for projects requiring wetland mitigation: Mitigation Banking: 90% In-lieu Fee: 7% Traditional mitigation: 3%

ODOT – FHWA Environmental Performance Measures In Place or Required Aggregated numbers of days for Resource Agency review of documents or permit application by project: NMFS. Four Biological Opinion (BO) requests. None provided within the required timeframe (135 days). USFWS. One BO was requested and it was provided within the required timeframe (135 days). US ACOE. 29 total Issued permits; 2 were Standard Permits processed in144 days average, and 27 were Nationwide Permits (NWP) processed in 58 days average. US NPS. 1 LWCF Section 6(f) Conversion Request Approval was provided within 6 months (no required timeframes).

ODOT – FHWA Environmental Performance Measures In Place or Required Aggregated numbers of days for Resource Agency review of documents or permit application by project: SHPO: 204 projects were processed under the Section 106 PA not requiring review. DEQ – 5 Individual 401 Water Quality Certifications, 9 Nationwide (internal ODOT review) - All DEQ permits received on time. ODFW - no required time frames

ODOT – FHWA Environmental Performance Measures In Place or Required Aggregated numbers of days for Resource Agency review of documents or permit application by project: DSL –30 permit applications were submitted to DSL. 27 for General Authorizations (GAs) 3 for Removal-Fills (RF) permits. –Average processing time (from complete application to the permit being issued) was 68 days. GAs: 43 days RF permits: 262 days. –27 of 30 permits submitted were complete upon receipt. Three were incomplete. –Fifteen wetland delineations were submitted to DSL. All 15 were deemed complete All 15 concurrence was issued within 30 days of receipt.

ODOT – FHWA Environmental Performance Measures In Place or Required Percent of mitigation sites that are monitored and found to be meeting permit conditions: 72%

ODOT – FHWA Environmental Performance Measures In Place or Required Number of staff in environmental resource agencies funded with State or Federal transportation funds to streamline the environmental process (data for 2010 calendar year): AgencyNumber of Liaisons DSL2 NMFS1 ODFW4 SHPO1 USACE2 USFWS/APHIS2 Total12

ODOT – FHWA Environmental Performance Measures In Place or Required Number of projects delivered using programmatic agreements: TypeProjects Section 106 for Minor Transportation Projects204 Programmatic Categorical Exclusions139 Standard local operating Procedures for Endangered Species (SLOPES) IV 19 Total362

ODOT – FHWA Performance Measures Recommended to Discontinue The utility of each of these measures is unknown or questionable. Data for of these measures is not currently available. Programmatic Categorical Exclusion Duration from 0% scoping to CE approval. Percent of NEPA documents delivered within agreed upon time frames. –Environmental Impact Statement Percent from NOI to Draft EIS Percent from Draft EIS to FEIS Percent from FEIS to ROD –Environmental Assessment – Percent from Letter of Initiation to EA Percent from EA to Revised EA Percent from Revised EA to FONSI Percent DOT owned impervious surface for which water quality treatment is provided. Number of review cycles for environmental documents Number of projects delivered using programmatic agreements

ODOT – FHWA Environmental Performance Measures to Consider Adding Number of permit violations (type, reasons, Region) –This measure could provide a very high-level measure of the health of the environmental program. –This measure could capture program-wide or recurring issues that need attention. Percent of projects requiring mitigation. –This measure would provide better context for the measure of successful avoidance in lieu of mitigation that is being provided. Percent environmental core training completed. –This measure could highlight training needs Other? –ODOT and FHWA to develop collaboratively

ODOT – FHWA Environmental Performance Measures Next Steps Collaboratively identify the overall desired outcome –Assess the overall health of environmental programs Identify shared environmental program priorities on an annual basis –Will be incorporated into FHWA’s Annual Performance Plan Focus on outcome based permitting –Reduce tracking of paperwork milestones with questionable utility. Increase Value of Data (real, meaningful, measurable) Support Programmatic Permitting approach Integrate with JTA Environmental Performance Standards

ODOT – FHWA Environmental Performance Measures Discussion and Questions