Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014.

Slides:



Advertisements
Similar presentations
Overview of the interoperability Regulation
Advertisements

LINK2000+ Status Søren Dissing
Objective ATC 16 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective AOM 21 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-AGVCS2 ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective SRC-CHNG ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
LSSIP Objective AOP04.1.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective ITY-COTR ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR.
Objective COM10 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective NAV03 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
Objective ATC 17 ESSIP Plan 2013 Luca DELLORTO DSS/EIPR
Objective NAV10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Objective INF07 ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
The European Organisation for the Safety of Air Navigation Objective AOP04.1.
Objective ITY-SPI ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
LSSIP Objective AOP04.2.
Objective ITY-SPI ESSIP Plan 2013 Ana Paula FRANGOLHO DSS/EIPR
Objective ATC 15 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 12 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective ATC 17 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective COM10 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective ATC 02.2 ESSIP Plan 2014 Ingrid FEIJT DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Objective FCM03 ESSIP Plan 2014 Octavian CIOARA DPS/PEPR
Objective ATC 16 ESSIP Plan 2014 Luca DELL’ORTO DSS/EIPR
ATN Subnetwork Implementation:
Objective AOM 21 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Objective SRC-RLMK ESSIP Plan 2013 Agnieszka DYBOWSKA DSS/EIPR
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective FCM01 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
The European Organisation for the Safety of Air Navigation Objective AOP03.
The European Organisation for the Safety of Air Navigation Objective AOP05.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective FCM05 ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective ATC 07.1 ESSIP Plan 2013 Luca DELL’ORTO DSS/EIPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
Workshop on preparations for ANConf/12 − ASBU methodology
Objective ATC 07.1 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-COTR ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Objective NAV10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective COM10 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
IBAC – CNS/ATM Datalink Briefing
Objective AOM 19 ESSIP Plan 2015 Agnieszka DYBOWSKA DPS/PEPR
LSSIP Objective AOP05 Note: objective postponed 12 months in ESSIP Plan Edition 2015.
Objective NAV03 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
LSSIP Objective AOP04.1.
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Objective INF04 ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Objective ITY-ACID ESSIP Plan 2015 Octavian CIOARA DPS/PEPR
Objective COM11 ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGDL ESSIP Plan 2015 Adriatik KOKONA DPS/PEPR
Objective ITY-AGVCS2 ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
Objective ATC 16 ESSIP Plan 2015 Luca DELL’ORTO DPS/PEPR
LSSIP Objective AOP03.
Presentation transcript:

Objective ITY-AGDL ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR

ESSIP Plan 2014 / Objective ITY-AGDL2 Comprehensive Explanation (1/3)  This OBJ covers the implementation of initial data link services based on air-ground (ATCO  Pilot) point- to-point data communications as specified by Regulation  29/2009 EC (data link services).  Scope: EU+ States = EU+CH+NO+ECAA  MIL: Only 1 non-mandatory SLoA on State a/c equipage

ESSIP Plan 2014 / Objective ITY-AGDL 3 Comprehensive Explanation (2/3) (=> Mandatory REG and ASP related SLoAs) EC 29/2009 mandatory processes to implement / EASA NPA/AMC EUROCAE & ICAO ITY-AGDL SLoA – REG – ASP - USE ITY-AGDL Timeframe – Part A/B Applicability Publication in the national aeronautical information publication REG (A) (B) EU+ ATN/VDL-2 availability, security policy and address management procedures REG (A) (B) EU+ Conformity of communications, flight data and initial flight plan processing systems & procedures (20/2009, EUROCAE & ICAO) ASP (A) (B) EU+ Organise personnel awareness and trainingASP (A) (B) EU+ Ground communication systems to comply with air- ground communication requirements ASP (A) (B) EU+ Deploy communication infrastructure to handle air- ground data link services ASP (A) (B) EU+

ESSIP Plan 2014 / Objective ITY-AGDL 4 Comprehensive Explanation (3/3) (=> Non-mandatory SLoAs) Non-mandatory requirements (complementing EC Regulation) ITY-AGDL SLoA – ASP & MIL ITY-AGDL Timeframe – Part A/B Applicability Equip transport-type State aircraft (EUROCAE)MIL EU+

ESSIP Plan 2014 / Objective ITY-AGDL5 Link to European ATM Master Plan  [AUO-0301] - Voice Controller-Pilot Communications (En Route) Complemented by Data Link;  [CTE-C2a] - Air-Ground existing data link (VDL2 and AOA);  [ER APP-ATC154] - Basic air-ground data link communications service derived from the CM and CPDLC applications;  [PRO-044b] - ATC Procedures involving protocol for utilization of Data Link communications, message composition, receipt acknowledgement;  [ER APP-ATC119] - Enhance Air/Ground Data Communication for Step 1 CPDLC.

ESSIP Plan 2014 / Objective ITY-AGDL6 Finalisation Criteria and Closed Questions  Various – see detailed breakdown in ESSIP Plan 2014.

ESSIP Plan 2014 / Objective ITY-AGDL7 Supporting Material  Various – see ESSIP Plan 2014

ESSIP Plan 2014 / Objective ITY-AGDL8 ESSIP Report 2013  Only three states out of eight, the airspace of which belongs to the Part A of the regulation, with a deadline of 02/2013, have completed the objective. Most of the states, the airspace of which belongs to Part B, with regulated completion deadline 02/2015, and ECAA States, have planned to implement the objective, within the deadline, except three states which have not yet developed any plans;  Four States have reported the objective Completed and fifteen have planned to complete the objective within the ESSIP deadlines while twelve States have reported it Late. 6 States reported not yet plans developed for implementation.

ESSIP Plan 2014 / Objective ITY-AGDL9 Links and contacts  Objective Coordinator: Adriatik Kokona,  DNM Objective Expert(s):Soren Dissing,