Parity Quality Beam (PQB) April 07, 2009. Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:

Slides:



Advertisements
Similar presentations
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
Advertisements

G 0 PC Installation and Beam Studies June & July 2006 Stephanie Bailey Riad Suleiman.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Electronic Cross-talk & Ground Loop Elimination in Injector Riad Suleiman Center for Injectors and Sources.
PQB Photocathode Analyzing Power Study May 19, 2009.
JLab Polarized Source Happex Collaboration Meeting May 18, 2007 P. Adderley, J. Brittian, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
PAVI ’06 Milos May 20, 2006 Kent Paschke – University of Massachusetts Controlling Helicity-Correlated Asymmetries in a Polarized Electron Beam Kent Paschke.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Collimator June 1-19, 2015HUGS The collimator is placed about 85 cm from the target and intercepts scattered electrons from 0.78° to 3.8° Water cooled.
Short Tutorial on Causes of Position Differences… …and what we can do about them (most slides stolen from Cates PAVI ’04 talk)
Compton polarimetry for EIC Jefferson Lab Compton Polarimeters.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
PQB Meeting Intermediate Frequency (IF) Cards Study & BPMs Summary March 24, 2009.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Fast Helicity Reversal Riad Suleiman Injector Group June 2, 2009.
Parity Quality Beam (PQB) Study Injector Group September 2008.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
G 0 PC Installation and Beam Studies Stephanie Bailey Riad Suleiman.
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
Beam Optics for Parity Experiments Mark Pitt Virginia Tech (DHB) Electron beam optics in the injector, accelerator, and transport lines to the experimental.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Parity Experiments and JLab Injector Riad Suleiman February 5, 2016.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
Polarized Injector Update
Parity Violation Experiments & Beam Requirements
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
A Mini-Primer for Parity Quality Beam (as seen from the Accelerator)
G0 Backward Angle Accelerator Preparations
G0 Accelerator Planning Meeting (11/1/05)
Parity Violation Experiments at JLEIC
Parity Quality Beam (PQB)
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Thoughts on why G0 needed position feedback and HAPPEX didn't
Thoughts on why G0 needed position feedback and HAPPEX didn't
QWeak Collaboration Meeting
G0 PC Installation and Beam Studies
G0 PC Installation and Beam Studies
Qweak Coordination Meeting
Polarized Source Development Run Results
Adiabatic Damping and Parity Quality of Low Energy
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Riad Suleiman February 2, 2017
Injector Studies Using Superlattice Photocathode
Helicity Magnets for PQB Feedback Helicity Magnets for PZT Booster
Advanced Research Electron Accelerator Laboratory
Polarized Source: Recent Activities
PQB Meeting March 05, 2009.
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
G0 PC Installation and Beam Studies
B-Team Meeting October 28, 2009
Spot-Size Reduction 4/5/2017.
UITF Conduct of Operations Review
Injector Commissioning & Optimization
Comparison between 4K and 2K operation performance of CEBAF injector cryomodules Grigory Eremeev Monday, August 19, 2019.
Isotope Readiness Review Run Plans
Presentation transcript:

Parity Quality Beam (PQB) April 07, 2009

Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading: 0R01 and 0R02 Chan 1Chan 2Chan 3Chan 4Chan 5Chan 6Chan 7Chan 8 ADC1QPD pm QPD pp QPD mm QPD mp Battery 1 Battery 2 ADC21I021I04 ADC31I060I02 ADC40I02A0I05 ADC50I070L01 ADC60L020L03 ADC70L040L05 ADC80L060L07 ADC90L080L09 ADC100L100R03 ADC110R040R05 ADC120R06BCM 0L02 Battery 3 Battery 4 Phase Monitor

Injector Parity DAQ o Both Hall A Parity Experiments and Qweak will readout the same DAQ o Issues:  Parity DAQ did work at 1 kHz and 500 and 100 µs but was able to read only 6 ADCs with 60 and 10 µs: This week, Paul King will upgrade the Parity DAQ ioc to be able to read all ADCs  BPMs “Transport” style IF cards are affecting short T-Settle studies: Requests are submitted to change IF cards to “Linac” style in Injector and Hall C

PQB Hardware o New Hardware:  New Helicity Board: Design is completed Request is submitted Ready by July 01, 2009  New IA Electronics: Design is completed, parts ordered, prototyping Ready by August 01, 2009  Revive the Injector Net: XNothing … o Eliminate 60 Hz Line Noise:  500 keV PSS Dipole Current Sensor New Sensor Ready by August 15, 2009  Ion Pumps VIP0L02/3 local power supplies: Modified power supplies Ready by April 23, 2009

Laser Table This week: 1.Add a cleanup Insertable Linear Polarizer (ILP) to the laser table just before IHWP 2.Align Pockels Cell

PQB Tasks 1.Task: Fast Helicity Reversal  Hall C Qweak: 1 kHz  Hall A PREx: 240 Hz (Line-Locked)  Establish 30 Hz Reversal PQB (8 hours) Pockels Cell OFF T-Settle Study RHWP Scans IHWP and ILP Studies  Study 1 kHz Reversal (8 hours) Pockels Cell OFF T-Settle Study RHWP Scans IHWP and ILP Studies  Find the “right” T-Settle (ideally 50 µs) 2.Task: Eliminate the Vacuum Window Birefringence by Rotating the LLGun2 Photocathode  Tried once. Repeat again? (8 hours)

3.Task: Halls Crosstalk and the Effect on Parity Quality Beam  Did Hall C current and laser phase scans and measured Hall A PQB in Injector – No crosstalk observed. Repeat (4 hours)  Did Hall C IA scan and measured Hall A charge asymmetry in Injector (change charge asymmetry of one beam, measure effect on the other) – No crosstalk observed. Repeat (4 hours)  Need to measure crosstalk in the Halls to look for RF beam loading. Need BSY Dump or Hall C and Hall A (4 hours) 4.Task: Check Helicity Magnets, Mott Polarimeters at 1 kHz:  Both Checked fine at 250 Hz last year  Need Linac IF cards in the 5 MeV region to check Helicity Magnets  Check Mott Polarimeters at 1 kHz (8 hours) 5.Task: Accelerator FFB Measurement of PQB:  Runs fine on Hall A iocse9 and Hall C iocse14  Need to implement in Injector iocs