Purpose of the Tune-up Currently two bodies of work Reallocation process – commenced on 10 February 2015 with the release of the discussion paper.

Slides:



Advertisements
Similar presentations
ITU Regional Development Forum - Warsaw 7 May The Radio Spectrum Policy Programme & the Spectrum Inventory Pearse ODonohue Head of Radio Spectrum.
Advertisements

BFWACG(00)161 Proposals for licensing 28GHz Objectives.
HGS Coordination Methodology: Initial Concepts 400 MHz Project.
Restack Status Report 16 October 2012 Digital Switchover Taskforce Housing and Property Working Group Tara Morice Manager, Restack Policy.
Highly Specialised Technologies Evaluations
1 Radio spectrum assignements for broadband services Gundega Rutka Head of Scarce Resource Division Electronic Communications and Post Department 10th.
Reform of Agvet Chemical Regulations. Reform History Chemicals and Plastics Action Agenda established Reducing the Regulatory Burden on.
Upcoming FCC Spectrum Auctions Bryan N. Tramont Wilkinson Barker Knauer, LLP
UK Spectrum Management Strategy: tomorrow’s challenges today Chris Woolford Director, International Spectrum Policy Radcomms 2014.
Auction of 15 MHz of spectrum in MHz Band Brendan Vernon Pricing and Policy Branch ACMA.
ACMA Spectrum Strategies 2 March 2006 Optus Networks Perspective Wireless Spectrum Strategies 2006 Peter FERRIS General Manager, Technology and Planning.
Intelligent Transport Systems (ITS) - Update on spectrum arrangements Spectrum arrangement options to support ITS in the MHz band in Australia.
Review of spectrum policy and management framework The ACMA perspective Giles Tanner.
© M2Z Networks Inc. All rights reserved. Advances in Wireless Technology and Impacts on Broadband Deployment National Broadband Policy Workshop August.
SMAG 01/191 Louise Odell Science & Technology Unit Radiocommunications Agency Institution of Mechanical Engineers, 20th June 2002.
Radio Frequency Spectrum Management in Indonesia - 3G/IMT 2000, TV Digital and other Wireless Activities And Issues - 3G/IMT 2000, TV Digital and other.
Satellite spectrum issues Chris Hose Spectrum Engineering Section RadComms /12 December 2006 Australian Communications and Media Authority.
Wireless Broadband Service in Rural America Rural TeleCon ‘06 October 24, 2006 Paul D’Ari Spectrum Competition and Policy Division Federal Communications.
Opening Address Wireless Spectrum Strategies 2006 Lyn Maddock Deputy Chair Australian Communications and Media Authority.
Auction No. 69: 1.4 GHz Bands Spectrum Auction Process and Integrated Spectrum Auction System Auction No GHz Bands Roy Knowles, Auctions Analyst,
1 BFWA CONSULTATION GROUP 4 March GHz UPDATE Joe Sonke Head of Broadband Fixed Wireless Access Section Radiocommunications Agency.
Updates on the 863MHz SRD band and 872MHz Award Andy Gowans, SPG, Ofcom UK 12th May 2009 IEEE802 Interim Meeting Atlanta 2009.
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
Review of the 803 to 960 MHz band Bridget Lally, Senior Radiocommunications Engineer, Spectrum Infrastructure Branch,
1 2 nd INDUSTRY CONSULATION ON PROPOSED UNIFIED LICENSING FRAMEWORK IN KENYA: KCCT 19 th March 2008 Frequency Issues Communications Commission of Kenya.
SPECTRUM ALLOCATION: 3G MOBILE, DIGITAL TV & WIRELESS 19 March 2001 Tony Shaw Chairman Australian Communications Authority.
Wireless Access Services ACMA/ITU International Training Program 5 September 2006 Nevio Marinelli & Christine Allen Wireless Access Services Planning Team.
Spectrum and Mobile Broadband Beyond Mobile Evolution in Australia G CDMA GSM AMPS First fully automatic mobile system Australian.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Third Generation mobile Licensing: the UK approach Jane Humphreys Radiocommunications Agency, UK.
Beyond 2020 — A spectrum management strategy to address the growth in mobile broadband capacity Bridget Kerans Senior Radiocommunications Engineer Spectrum.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
CSMAC Spectrum Sharing Sub- Committee Discussion Materials March 2012.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Spectrum Auction Process and Integrated Spectrum Auction System Auctions 73 and MHz Band Craig Bomberger Auctions and Spectrum Access Division November.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
RALI FX3 Microwave Fixed Services Frequency Coordination Glenn Odlum Senior Engineer Spectrum Engineering Section
A. Unassigned TV Channels B. Expiring Spectrum Licences Brendan Vernon Manager, Projects and Coordination Section Pricing & Policy Branch Radcomms Conference.
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Auction Process & FCC Auction System Auction 79 FM Broadcast Debbie Smith Auctions and Spectrum Access Division June 16, 2009.
©Ofcom Business Radio Reform Trading, Liberalisation and Simplification 22 November 2007 Paul Jarvis Business Radio 07.
SMAG 01/191 Licence Exempt Spectrum For Public Telecommunication Services Bob Barron Head of Science & Technology Unit Radiocommunications Agency Spectrum.
©Ofcom Spectrum reform in the UK: The development of Spectrum Usage Rights Professor William Webb 2006.
Spectrum Auctions Spectrum Auctions Margaret Wiener Chief, Auctions & Spectrum Access Division Wireless Telecommunications Bureau April 30, 2008.
71-95 GHz Registration A Streamlined Approach to Licensing.
0 Slide 0 Evolving Methods of Controlling Interference National Spectrum Managers Association May 19, 2004 Mitchell Lazarus | |
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Overview of Service Rules: Technical Issues Gary Devlin Engineer Mobility Division, WTB December 3, MHz SMR Auction No. 55 Seminar.
David McPhee & John Cameron Victorian Regional Water Monitoring Partnership Coordinators.
Mobile Broadband Strategy and Work Program Update RadComms 2016 Chris Hose Executive Manager Spectrum Planning and Engineering.
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
CREATING NEW MARKET MECHANISMS What is a market? Is there any such thing as a market in radiofrequency spectrum? Allocation market vs secondary market?
ACMA Tune-up 400 MHz (Update and Milestone 3) MHz - Introduction 11 March 2016.
Julie Zoller Deputy Associate Administrator International Office of Spectrum Management NTIA Unleashing the Wireless Broadband Revolution.
Innovation, Science and Economic Development Canada (ISED) 600 MHz Repurposing RABC 600 MHz Working Group Meeting Innovation, Science and Economic Development.
Promoting Spectrum Access for Wireless Microphone Operations.
Use of Spectrum Bands Above 24 GHz For Mobile Radio Services ‘5G’…
Spectrum Planning Work Program Tune-up Broadcast Spectrum Planning Section Alastair Gellatly Section Manager.
Spectrum Planning Work Program Tune-up Spectrum Engineering and Space Section Mark Arkell Section Manager.
Spectrum Planning Work Program Tune-up Spectrum Planning Section Nevio Marinelli Section Manager.
SPECTRUM IN TRANSITION
Communications Regulatory Authority
600 MHz – Proposed TV Transition Objectives and Methodology
Updates on the 863MHz SRD band and 872MHz Award
Amending the Performance Framework
Telecommunications Spectrum Policy and Planning Regional Workshop on Efficiency of the Frequency Spectrum Use in the Arab Region 5 – 7 December 2011.
Combine Licensing of 800 MHz and 2.6 GHz Band
Legislative Update: SB 2224 and SB 322 October 1, 2019.
Presentation transcript:

Purpose of the Tune-up Currently two bodies of work Reallocation process – commenced on 10 February 2015 with the release of the discussion paper Interim access – discussion paper released 19 February 2015 Purpose of this Tune-up To allow stakeholders another opportunity to raise issues or ask questions about current regional 1800 MHz band issues.

Current licensing arrangements and use Band (MHz) MetroRegionalRemote 1710–1725/1805–1820 MHz (2 x 15 MHz)Spectrum Apparatus 1725–1785/1820–1880 MHz (2 x 60 MHz)SpectrumApparatus

1800 MHz band overview Emerging demand - LTE 1800 MHz band is used for LTE deployments globally availability of LTE equipment growth of machine-to-machine technology economies of scale Services suited to the 1800 MHz band mobile phone and broadband services smart networks/energy grids automated systems such as transport

Spectrum licensing Spectrum licensing features: Technology flexible Fully tradeable Can be amalgamated, divided or reassigned, in part or in whole, to third parties Align the expiry dates with reissued licences - 17 June 2028 Potential for early access to spectrum won at auction

Reallocation process

Reallocation timeline

Consultation on draft recommendation Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Licence type Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Licence type Spectrum licensing features: Technology flexible Fully tradeable Can be amalgamated, divided or reassigned, in part or in whole, to third parties Align the expiry dates with reissued licences - 17 June 2028 Potential for early access to spectrum won at auction

‘Early access’ apparatus licensing

Parts of the spectrum Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Two options: Reallocate the entire 2 x 60 MHz Reallocate a lesser amount - 2 x 55 MHz or 2 x 45 MHz Benefits of 2 x 60 MHz: the most transparent method of identifying the highest value use of the entire band. Parts of the spectrum

Reallocation period and deadline Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Reallocation period and deadline

Other matters Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Allocation methodology Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots three small parts of the spectrum in the wider 1800 MHz band

Allocation methodology Open outcrySMRCCA Most commonSimple/flexible. Has been used by the ACMA and predecessors in the past Complex. Was used by the ACMA in the 700 MHz and 2.5 GHz auction Suitable when there are a limited number of lots available and when lots are not interdependent or substitutable Suitable when lots are interdependent or substitutable Suitable where the value of an individual lot depends significantly on what other lots that bidder can acquire Lots are auctioned sequentially Multiple items are auctioned simultaneously Bidders determine which packages they would like to bid on. Bidding occurs on one lot at a time Bidding occurs in a sequence of rounds Bidding occurs on packages of lots (one or more)

Lot configuration Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Geographic area: proposed lots boundaries (option 2) Geographic lot configuration Defined areas 1 Darwin 2 North Queensland (Cairns/Townsville) 3 Central Queensland (Mackay) 4 South Queensland (Maryborough) 5 Northern New South Wales (Grafton) 6 Western New South Wales (Dubbo) 7 Canberra (including south coast of NSW) 8 Southern New South Wales/Riverina (Albury) 9 Regional Victoria 10 Tasmania 11 Regional South Australia 12 Regional Western Australia

Allocation of residual lots Comments sought on: Draft recommendation Licence typeSpectrum licences Parts of the spectrum 1725–1785 MHz and 1820–1880 MHz (a total of 2 x 60 MHz) in regional Australia Reallocation periodTwo years in all parts of the spectrum Reallocation deadline 12 months before the end of the reallocation period Other matters Allocation methodology SMR Lot configuration2 x 5 MHz segments in 12 geographic areas Allocation of residual lots Three small parts of the spectrum in the wider 1800 MHz band

Allocation of residual lots Residual lots Unallocated spectrum from the recent ESL process for the 1800 MHz band

Next steps 1. Draft s.153F recommendation2. Final recommendation3. s.153B Ministerial declaration4. Draft allocation instruments5. Final allocation instruments6. Auction

Interim access - overview Overview Consideration of current uses versus likely future use Reallocation process/long term licensing arrangements Reallocation process concludes mid 2017 (after licence issue) Parts of the band remain unallocated but are available Consideration of early access/interim access

Overview Interim access arrangements Why? There is a significant commercial interest to deploy mobile services using LTE technology. The ACMA considers it better to have spectrum utilised than not. Where? Potentially vacant parts of the regional 1800 MHz band.

Establishing interim access model Key considerations Legal issues (legislation) Spectrum availability Management of interference and coordination Uncertainty of auction outcome Potential limitations for ‘early access’ after auction

Criteria for interim access Criteria for an interim licensing policy: Transparent Equitable Efficient Practical and workable Timely

Features of interim access Comments sought on: Features of interim access Embargo exemption (Embargo 62) Licence type – PTS apparatus Tax arrangements Coordination arrangements (RALI MS34) Tenure of interim access Option 1 - Operation until the auction Option 2 - Operation until the end of the reallocation period (UIOLI) Modified priority assignment model Three stage process to assign interim apparatus licences

Features of interim access Comments sought on: Features of interim access Embargo exemption (Embargo 62) Licence type – PTS apparatus Tax arrangements Coordination arrangements (RALI MS34) Tenure of interim access Option 1 - Operation until the auction Option 2 - Operation until the end of the reallocation period (UIOLI) Modified priority assignment model Three stage process to assign interim apparatus licences

Features of interim access Interim access arrangements What? Authorise access to the regional 1800 MHz band before a market-based allocation of spectrum licences. When?As soon as possible How? Embargo exemptions for PMTS Class B apparatus licence How much? Calculated using PMTS Class B licence tax arrangements current at the time of application.

Tenure of interim access Comments sought on: Features of interim access Embargo exemption (Embargo 62) Licence type – PTS apparatus Tax arrangements Coordination arrangements (RALI MS34) Tenure of interim access Option 1 - Operation until the auction Option 2 - Operation until the end of the reallocation period (UIOLI) Modified priority assignment model Three stage process to assign interim apparatus licences

Two options: 1.Interim access licensing until auction winners are known 2.Interim access licensing would be in effect until end of reallocation period, at which time spectrum licences would take effect Tenure of interim access

Modified priority assignment model Comments sought on: Features of interim access Embargo exemption (Embargo 62) Licence type – PTS apparatus Tax arrangements Coordination arrangements (RALI MS34) Tenure of interim access Option 1 - Operation until the auction Option 2 - Operation until the end of the reallocation period (UIOLI) Modified priority assignment model Three stage process to assign interim apparatus licences

Getting an interim licence How does it work? Streamlined embargo exemption process 3 stage process – to reduce potential for conflicting assignments Only issue licences in those areas where sufficient spectrum is available for four parties. Amount of spectrum available determined on a site-by-site basis Spectrum assigned according to assignment priority – lowest frequency up: Telstra  VHA  Optus  Other Applications for licences in the ‘Other’ spectrum assessed on first- in-time basis, using the same procedure defined for the 2.1 GHz and 3.6 GHz band releases

Embargo Exemption >Streamlined process >Licensees/APs can assume an exemption is granted if: >Applications adhere to RALI MS34 >Applications are submitted during the application window >Proposed sites are located within regional Australia >Spectrum availability requirements for each stage are met (i.e. 60 MHz, ≥40 MHz or ≥20 MHz) >Individual spectrum acquisition limits for each stage are met (i.e. 2x15 MHz, 2x10 MHz or 2x5 MHz)

Next steps - Interim access process StageKey stepsIndicative timings CurrentFinalise interim access policyNone available Stage 1 Initial notification period and application window one where 2 x 60 MHz of spectrum available Maximum of 2 x 15 MHz per licensee Notification period (NP): 2 weeks Application window (AW) 1: 2 weeks from the end of the initial notification period Commence as soon as possible Stage 2 Notification period and application window two where at least 2 x 40 MHz of spectrum is available maximum of 2 x 10 MHz per licensee NP: 2 weeks AW 2: 2 weeks Cannot commence until all stage 1 licences are issued Stage 3 Notification period and application window three where at least 2 x 20 MHz of spectrum is available maximum of 2 x 5 MHz per licensee NP: 2 week AW 3: 2 week Cannot commence until all stage 2 licences are issued Completion of all three stages: 3 months (approx.)

Determining the amount of spectrum available >Assess availability of every channel at proposed site >Use parameters of proposed system (i.e. antenna gain, tilt, tx power etc) >Frequency assignment conducted as per RALI MS34 >Co-existance with fixed links >Amount of spectrum available is the number of 5 MHz paired channels that can be successfully assigned

Assignments >Spectrum assigned according to assignment priority – lowest frequency up: Telstra  VHA  Optus  Other >Applications for licences in the ‘Other’ spectrum assessed on first-in-time basis, using the same procedure defined for the 2.1 GHz and 3.6 GHz band releases >There is a risk of conflicting assignments during the assignment of 10 MHz and 5 MHz channels. >Prospective licensees should be aware: >licensees will not be afforded protection from interference that occurs from other interim access PTS licences issued in the same stage

Wrap up The ACMA is managing two processes concurrently: 1.long term reallocation process Consultation ends 11 March interim access process Consultation ends 20 March 2015

Questions Supplementary Slides

Modified priority assignment model FrequencyChannel 2x5 MHzRegional 1710/1805 MHz 1785/1880 MHz 1 Currently spectrum licensed Telstra (2 x 15 MHz) VHA (2 x 15 MHz) Optus (2 x 15 MHz) Other* (2 x 15 MHz) * Licensees would be issued within this segment on a ‘first-in-time’ basis

Assigning 10 MHz Channels – 1 Channel 2x5 MHzAvailabilityRegional 1Not assessed Currently spectrum licensed 2Not assessed 3 4Available Telstra (2 x 10 MHz) 5Available 6 VHA (2x 5 MHz) 7Not Available Not assigned 8Available VHA (2x 5 MHz) 9Available Optus (2 x 10 MHz) 10Available 11Available Other* (2 x 10 MHz) 12Available 13Not Available Not assigned 14Available 15Not Available * Licensees would be issued within this segment on a ‘first-in-time’ basis

Assigning 10 MHz Channels – 2 Channel 2x5 MHzAvailabilityRegional 1Not assessed Currently spectrum licensed 2Not assessed 3 4Available Telstra (2 x 10 MHz) 5Available 6 Not assigned 7Not Available 8Available VHA (2 x 10 MHz) 9Available 10Available Optus (2 x 10 MHz) 11Available 12Available Other (2 x 10 MHz) 13Available 14Available Not assigned 15Not Available * Licensees would be issued within this segment on a ‘first-in-time’ basis

1800 MHz  First-in-time application process >During application window applicants submit a completed RO57 form and nominate an Accredited Person (AP) >The order applications are received is recorded by the ACMA >Based on this order of received applications, the ACMA will notify the APs to conduct frequency assignment work >Once all licences have been issued for a particular application, the ACMA will notify the AP for the next application on the list. >APs must coordinate with any services licensed first-in-time >Refer to the process described for the 3.6 GHz band: regional-and-remote-areas regional-and-remote-areas