NNSA Program Perspective

Slides:



Advertisements
Similar presentations
Portfolio Management, according to Office of Management and Budget (OMB) Circular A-16 Supplemental Guidance, is the coordination of Federal geospatial.
Advertisements

1 NNSAs ICF Strategy Presented to Fusion Power Associates 34th Annual Meeting and Symposium Washington, DC December 11, 2013 Kirk Levedahl NNSA NATIONAL.
Effective Contract Management Planning
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Program Management Office (PMO) Design
Roadmap for Sourcing Decision Review Board (DRB)
Course: e-Governance Project Lifecycle Day 1
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
BENEFITS OF SUCCESSFUL IT MODERNIZATION
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
INITIATIVES & STRATEGIES
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
V i s i o n ACCOMPLISHED ™ Portfolio Management Breakthroughs Shelley Gaddie President Project Corps Pacific Northwest Portfolio Management Roundtable.
Overarching Roles of Critical Partners In A Project 9:30 – 10:00 Rob Curlee, FMO Joseph Dominque, OCISO Mike Perry, EA.
IT Strategic Planning Project – Hamilton Campus FY2005.
Shared Learning Services : Key Learnings Session 102 November 9, 2009.
project management office(PMO)
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Grants Business Process Re-Engineering (BPR) Overview
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
UCSF IT Update November 2013 Presenter: Joe Bengfort.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Industrial Engineering Roles In Industry
NIST Special Publication Revision 1
The Challenge of IT-Business Alignment
10/20/ The ISMS Compliance in 2009 GRC-ISMS Module for ISO Certification.
Deloitte Consulting LLP Commonwealth of Massachusetts IT Consolidation Initiative IT Governance Target State Update Briefing for Statewide Working Group.
2 Louisiana Believes Objective: The Department is providing districts increased support in preparation for the school year. As districts plan for.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Planning for FY08: Managing the Transition of the LM Organization December 2004.
DOE ASSET MANAGEMENT PLAN
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
Target State High-level IT Governance Model
Proventures reconnect session on Project Portfolio Management (PPM)
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
Laboratory Operations Board
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
New Framework for Strategic Goal Assessment NSF Advisory Committee for Business and Operations November 8-9, 2006 Tom Cooley, Director, BFA.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Info-Tech Research Group1 Manage IT Budgets & Cost World Class Operations - Impact Workshop.
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
Implementing Program Management Standards at Duke Energy.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Project Management Career Development Program (PMCDP) development-program Linda Ott.
OMB Status 03/31/05 Monday, June 6, 2005 OMB Progress 03/31/05 Vicki Novak Tom Luedtke Gwen SykesPat DunningtonGwen Sykes Best in Government! Steps to.
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
Budget Study Sessions Strategic Support Proposed Operating Budget OUTCOMES: - A High Performing Workforce that is Committed to Exceeding.
Establish and Identify Processes  Identify and establish current state:  Roles and responsibilities  Processes and procedures  Operational performance.
JMFIP Financial Management Conference
IT Governance and Management Structure
Strength Through Science
HUIT is mission-driven, goal-oriented, and values-based
Identify the Risk of Not Doing BA
Advances in Aligning Performance Data and Budget Information:
Research Program Strategic Plan
Phase 1 Tollgate Review Discussion Template
HUIT is mission-driven, goal-oriented, and values-based
Office of Secretary of Defense
By Jeff Burklo, Director
Vijay Rachamadugu and David Snyder September 7, 2006
MODULE 11: Creating a TSMO Program Plan
Project Certification Planning Phase August 27, 2014
Presentation transcript:

NNSA Program Perspective DOE Property Management Virtual Workshop Jeff Underwood Office of Infrastructure and Capital Planning, NA-00-20 Office of Infrastructure and Operations, NA-00 May 21 2013

Organizational Structure Associate Administrator Infrastructure & Operations 00 Program Executive Officer (VACANT) 00.1 Deputy Associate Administrator *Est. 15 Sep 2012 00 Field Coordination Office 00.2 Environment, Safety & Health Livermore Field Office Savannah River Field Office 00-10 00-LL 00-SV Sustainability Center of Excellence Infrastructure & Capital Planning Legend I - Established 26 JUN 2012 II - NNSA approved 20 Dec 2012 package submitted to DOE 15 Jan 2013 III - In development with NA-70 Nevada Field Office 00-60 00-20 00-NV Security Operations Sandia Field Office Kansas City Field Office 00-30 00-SN 00-KC Packaging & Transportation Los Alamos Field Office Quality Management Center of Excellence 00-LA 00-40 00-70 NNSA Production Office Infrastructure Resource Management 2 00-NPO 00-50 Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

“Become the cornerstone for the Administrator The NA-00 Vision NNSA ORGANIZING PRINCIPAL We are a unified organization, centrally governed. We do our work  at headquarters, in the field, and around the world. NA-00 SHORT TERM VISION “Become the cornerstone for the Administrator and Principal Deputy of a unified organization, centrally governed to enable and facilitate changes in other areas.” To fulfill the vision, NA-00 must: Build the NNSA and NA-00 Operating Models Arrest the declining state of infrastructure throughout NNSA Achieve measureable operational excellence Achieve scalable, repeatable, predictable, and transparent cyclic processes Efficiently manage scarce resources particularly people and funding

NA-00-20 Initiatives Builder Sustainment Management System (BSMS) End State Planning G-2 Infrastructure Module Risk-Based D&D 4

BSMS Flow Chart 5 Distress “Symptoms” at building component level Failure Curve Condition Index “Programming” module Mission Dependency Index (Developed by program, uses site provided data) IPL (Site level actions prioritized at Enterprise level) 5

Why BSMS? State of the Art condition “risk of failure” assessments based on engineering data with results comparable across Nuclear Security Enterprise (NSE). Reduction in costs of assessment. Common frame of reference for discussing infrastructure condition with Department of Defense. Opportunity to build collaboration with Corps of Engineers to put NNSA on the cutting edge of infrastructure assessment, planning, and management. 6

End State Planning – Basic Premise NNSA is a government-owned aerospace scientific, consulting, and production enterprise with a mature product line and multiple customers. Its nuclear weapon “backbone” supports all NNSA missions; to sustain that backbone with its mature product line NNSA needs to grow national security and other business lines that draw on the core competencies of the backbone. NNSA’s infrastructure must be “right-sized” to support both the backbone and the surrounding business lines. 7

End State Planning - Concept The first “P” in PPBE. Develop NNSA planning guidance based on existing site guidance and comparable policies from industry and academia Plan for all customers. Each site proposes the end state that will meet its current mission and business development requirements. NNSA integrates site end states into a single “right-sized” enterprise end state, approved by program offices, and translates that “right-sized” end state into a capital investment roadmap. “Right-Sized” means redundancies are identified and defensible, utilities and other enabling infrastructure are scaled to mission, and consistent with national consensus standards. End states are updated annually. 8

G-2 Infrastructure Module Concept Proposed Infrastructure Investments and Changes (Sites enter data.) Decision Module (Programs review proposals against mission and planning standards) Approved Infrastructure Investments FIMS (Current Infrastructure) Current State End State Road Map Programming What Iffer Builder CostWorks/CAIS 9

Risk-Based D&D The business case for proposed D&D projects is broader than the often minimal reduction in operating and maintenance costs. Allowing facilities to remain standing for many years with minimal maintenance and surveillance creates risk. Management of that risk needs to be quantified and tracked along with footprint. Footprint, by itself, is an imperfect metric that steers D&D investments toward the lower cost per square foot facilities, away from the more expensive projects and away from management of the risks of extended minimal maintenance and surveillance. 10

Take Aways Enterprise level perspective Moving infrastructure toward a transparent, enterprise level, data-driven assessment and planning model, with automated data entry and decision processes Risk-based infrastructure decisions Scalable, repeatable, predictable, and transparent cyclic processes 11

BACK UP SLIDES Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

The Office of Infrastructure and Operations NA-00 - Formed June 26, 2012 The Office of Infrastructure and Operations Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

Office of the Administrator NNSA Integrated Operations Concept Lab / Plant Execute FUNCTIONAL OFFICE NA-SH, NA-IM Office of the Administrator Strategic Vision Operational Expectations Policy/ Requirements Development Process On-site Oversight And Performance Review Infrastructure Requirements Support or Execution PROGRAM NA-10,20,40,80 Requirements/ Directions NA-00 Coordinate Integrate Standardize Strategic Vision Assessment Consistent Implementation (Allows for purposeful differences) Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

Cross-walk from Defense Programs to Site Stewardship Site Operations: Includes facility operations costs; utilities; development and implementation of the Nuclear Safety Basis; and ES&H programs. Site Sustainment: Includes direct maintenance costs, re-capitalization projects, GPPs/Capital Equipment projects, RAMP costs, OPCs. Site Support: Includes Container activities - a part of Program Readiness, specifically, Nuclear Safety Research and Development Program and Nuclear Criticality Safety Program Long-Term Stewardship (formerly EPO) was realigned from within Site Stewardship. Facilities Disposition: Reduce risks by preparing high priority production facilities with mercury issues, safety and security concern. Site Stewardship, NA-00 Defense Programs, NA-10 Operations of Facilities MRR Containers Storage Program Readiness Construction Readiness in Technical Base and Facilities Nuclear Operations Capability MRR Storage Pu Metal Processing Program Readiness Capabilities Based Investments Construction Nuclear Programs, NA-10 Operations of Facilities: $1.5B Program Readiness: $92.6M MRR: $127.7M Storage: $37.5M Containers: $27.5 Construction: $439M Nuclear Operations Capability: $265.9M MRR Storage Pu Metal Processing Program Readiness S67.3M Capabilities Based Investments: $39.6M Site Operations: $1.1B Site Sustainment: $433.8M Site Support: $109.6M Safety Program $25.3M Facilities Disposition: $5M *All funds remain in the Weapons Activities Appropriation Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

NA-00 Accomplishments To Date Established NA-00 Headquarters organizations, realigned NNSA Field Office personnel to report directly to NA-00, consolidated Y-12 and Pantex Field Offices into the NNSA Production Office (NPO) Issued Strategic PEP, which streamlines NNSA evaluation of contractor performance by focusing on strategic outcomes indicative of acceptable overall performance in lieu of its historic tactical focus. Ensures consistency across the enterprise and assesses the M&Os on common criteria. Established Sustainability Center of Excellence and Quality Management Center of Excellence Developed standardized Leadership Strategic Performance Objectives. Established employee SPOs by functional area to increase visibility of the Headquarters Program Functions to the performance of the Field Office personnel executing the mission; i.e. FPDs, COs, and GC) Established the Capabilities Based Field Office (CBFO) structure, which is the result of a unified approach to identify essential common functions that NNSA field offices must perform, and realign resources to best execute the mission Established Performance Reporting: NA-00 White boarding, Action Tracking and Dashboard Transferred funding from DP to NA-00 to support facilities and infrastructure operations and maintenance Lead in initiating and integrating an enterprise-wide management system that complies with an international consensus standards (ISO 9000 – 9008) to improve efficiency and financial stewardship. Approved Business Management System and Business Model B-4 Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

Site Stewardship Congressional Budget Request [a] This represents the proposed control level. Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

Mapping from FY13 Operations of Facilities to FY14 Site Operations and Sustainment Operations of Facilities in FY2013 RTBF = Site Operations + Sustainment in FY2014 budget request FY14 EI Site Operations $1.11B FY13 RTBF Operation of Facilities $1.49B TOTAL FY14 $1.54B FY14 EI Sustainment$0.43B Notes for Sujita 1.49B is the FY13 annualized CR dollars, PBR was 1.41B This equates to only a 50M increase. However we had a target transfer of 115M for NIF operation. There was also the Workforce prioritization of -- 70,020M And Management efficiencies of -- 16,144M Also we took 15.8M for TRU waste obvious question ??? Only 5M for NIF???? The change from FY13 to FY14 includes target transfer for NIF operations and recapitalization. Department of Energy | National Nuclear Security Administration | Office of infrastructure and operations

NNSA BSMS Goals Implement for all BSMS supported infrastructure by 9/14/2014. Draw on Construction Engineering Research Laboratory development activities to get on “cutting edge” of infrastructure maintenance and to participate as possible, including development of utilities module. Fully implement CAIS for infrastructure not currently addressed by BSMS. Set a precedent to take NNSA to the cutting edge of infrastructure planning and management. B-7

BSMS Implementation Concept Validate/fully implement UNIFORMAT II inventory used by CAIS Train assessment and planning staff Integrate BSMS training into site training programs Integrate “distress” assessments with existing maintenance and assessment practices and procedures Conduct initial assessments Determine programming parameters Validate uniform implementation across complex “First Wave” will further refine gap before formal tasking issued to sites. B-8

Current Strategy Implement at two “First Wave” sites. With “Second Wave” starting a few months later. Develop high level milestones that can be incorporated into contractor performance evaluation plans. LLNL and Y12 lead effort, with other sites following. Set/revise milestones based on leader’s experience. Implement milestones through “rolling wave” planning. M&O’s develop plans to meet milestones. Implement “off the shelf” with no modifications other than those needed to tailor to unique building components. NA-00-20 develop MDI guidance and plans. Use deadlines, milestones, and award fee to create sense of urgency. B-10

BSMS - Near Term Steps USACE provides integrator as single point of contact for NNSA. Understand implementation by other agencies, establishing networking contacts with others at same and more advanced stage of implementation. Working with integrator and “First Wave” sites, develop high level milestones and an estimate of funding to be provided to USACE. Sign Supplemental Agreement under existing MOU. Develop quantified performance measures of implementation success. Identify training available, develop a strategy for making it available to sites (M&O’s or NNSA fund? Train the Trainer? ...?). “Roll out” BSMS in a series of VTC’s with each site as soon as possible to keep all M&O’s and their federal offices aware of plans, progress and their roles, to obtain their inputs to implementation memorandum, and to invite sites to join Y12 and LLNL in “rolling wave” implementation. Develop, in concert with NNSA program offices, a plan for MDI with screening questions oriented around NNSA mission. Determine delta between BSMS and DOE policy and document equivalencies. Based on above, develop a high level tasking memorandum to direct sites to implement BSMS, including high level milestones to be used in fee determinations, with a complex-wide “kick-off” training session and workshop hosted by CERL. B-12

What-Iffer - Concept Based on Y12 planning proposal. Integrates operating spending, maintenance spending, and capital investment in a risk-based “zero sum” budget. Will be used by NNSA to inform budget decisions made between embargo of the budget and submission of budget to Congress. NNSA will send out a “data call” when requirements are established. B-11