Contractor Module Training ( C-400 & Subcontract Agreements PDBS CONTRACTOR MODULE TRAINING Spring 2006 Contractor Module Overview Purpose of Contractor.

Slides:



Advertisements
Similar presentations
Division of Alcoholic Beverages and Tobacco In-State Manufacturers Monthly Report.
Advertisements

MY NCBI (module 4.5). MODULE 4.5 PubMed/How to Use MY NCBI Instructions - This part of the: course is a PowerPoint demonstration intended to introduce.
MY NCBI (module 4.5). MODULE 4.5 PubMed/How to Use MY NCBI Instructions - This part of the: course is a PowerPoint demonstration intended to introduce.
Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Welcome to WebCRD.
MY NCBI (module 4.5).
Contractor Desktop Electronic Bid System Training.
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Division of Housing & Community Development
Logging In Go to web site:
Gateway Program Go to along the left side, in the third section, click on The Gateway.
Page 1 of 21 This module will describe the procedure for a Metis Bid Request and how to upload the Metis supporting documentation. Welcome To the ETS –
TFACTS Private Provider Financial/Invoicing Overview 1.
Logging into ITAMS as a Student or Hourly Employee To Login to ITAMS for the first time: Open your web browser. Click File, Open, and type the following.
1Allocating Expenses. Create Report Header Page To access this screen, click on ‘New Expense Report’ from your Expense Module Tab This page will come.
Alcoholic Beverage Distributor’s Monthly Report. Log in with the user id and password provided through the EDS registration process and click on the Login.
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts Contract Closeout Application.
Search Empower Engage Send Print Co-Brand With BusinessBuilder.
WORKS ALLOCATION AND SIGN OFF OF EXPENSEWORKS ALLOCATION AND SIGN OFF OF EXPENSE Works users can allocate and/or sign off as soon as transactions appears.
WORKS LOGIN:
Division of Alcoholic Beverages and Tobacco Beer Manufacturer’s Monthly Report.
1 Team Leader TKS Job Aid. 2 Viewing the On-line Presentation If you are viewing this presentation via Internet Explorer for best results resize the “Notes”
ERA Manager Training December 19, Propriety and Confidential. Do not distribute. 2 ERA Manager Overview In an effort to reduce the need for Providers,
FFAVORS WEB Ordering Manual GSA Schedule: GS35F4594G FEDSIM Task Order Number: GSTFMGBPA10001CO05 FEDSIM Project Number: 11047AGM and 11048AGM SRA Project.
1 OPOL Training (OrderPro Online) Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Division of Alcoholic Beverages and Tobacco Liquor Distiller’s and Rectifier’s Monthly Report.
1 OrderPro Point of Sale (POS) Training Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Walk Through of VEEP Online System Updated June 2015 Registering as a ‘New User’ Logging On and Reporting.
Warehouse Report. Log into EDS using your Address/User Id and Password. If you have forgotten your password, click on the Forgot Password? link.
Home NEW INNOVATIONS Resident/Fellow Introduction NEW INNOVATIONS Resident/Fellow Introduction This presentation includes the following topics: Login Notifications.
© Viewing your incomplete chart status 2. Completing your charts from the message center 3. Completing your charts from the portal 4. How to communicate.
1 SCHOOL-WIDE PERFORMANCE BONUS PROGRAM (SPBP) Instructions for Compensation Committees.
Cigarette Distributing Agent’s Report. Log in with the user id and password provided through the EDS registration process and click on the Login button.
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts LAUSD Contracts Application.
Registered Nurse Education Programs Capitation & Special Programs Funding Webinar Presented by: Tyfany Frazier
Ceridian Time Solutions Hourly/Non-Exempt & (Non- Contracted) Per Diems Key Entry.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Walk Through of VEEP Online System Updated May 2011.
CUSTOMER ORDERING QUICK REFERENCE GUIDE November 9, 2015.
Navigation: If the tutorial opens up in your web browser, simply click your mouse to advance to the next slide. Use the “Backspace”
START Electronic Field Book Goal Installing Field Book Program on the PDA.
Orders and Invoices Supply Chain Platform: Rolls-Royce Training for Indirect Suppliers March 2016.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
How to Create eInvoices in SCP-RR Training Presentation for Supply Chain Platform: Rolls-Royce January 2016.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Division of Alcoholic Beverages and Tobacco Beer Manufacturer’s Monthly Report.
Compile your monthly P-Card Packet 1,2,3 For in depth screenshots and details on Step 1 click here 1.Open your transactions for the Current Billing Cycle.
Inquiry Tracking. Inquiry Tracking :: Logon Non-Weidmuller employees use the first initial of your first name and your full last name. (i.e. bjones for.
Training Guide for Residents
Non-exempt Salaried Employee
Standard Operating Procedure
Setting up Categories, Grading Preferences and Entering Grades
To the ETS – Metis Bid Request Online Training Course
To the ETS – Agreement Management Online Training Course
Program Management Portal (PgMP): Catalog and the Client
CONTRACT COMPLIANCE TRAINING
To the ETS – Encumbrance Online Training Course
To the ETS – Metis Bid Request Online Training Course
To the ETS – Agreement Management Online Training Course
Welcome to WebCRD.
To the ETS – Encumbrance Online Training Course
New Features in Security Management
Presentation transcript:

Contractor Module Training ( C-400 & Subcontract Agreements PDBS CONTRACTOR MODULE TRAINING Spring 2006 Contractor Module Overview Purpose of Contractor Module Accessing PDBS Via Citrix Module Training

Contractor Module Overview C400 Anticipated Monthly Payments Request to Sublet work (C-115 / C-116) Contractor Employee Setup OJT Trainee Hours Worked Subcontractor payments Entry Reports –DBE Commitment Report –DBE Item Payment Analysis –On-the-Job Trainee Hours Worked

Purpose of Contractor Module Step one of a new digital age of electronic form creation and submittals. Reduce redundancy Minimize errors

Accessing PDBS via the Web Go to

Load Citrix Web Client Download and run the Citrix Web Client and then restart browser.

After installing Web Client Click PDBS to connect

Citrix login Enter Assigned ID and password

PDBS login Enter the same Assigned ID and password

Subsystem dropdown To enter the Contractor module, click on ‘Sub Systems’, then ‘Contractor’.

Contractor Module Welcome Screen A welcome screen will appear. You must click ‘Contractor’ in the above dropdown menus in order to access module options.

Contractor Module Menu dropdown This is a view of the Contactor Module dropdown menu.

Contractor Module Training ( C-400 & Subcontract Agreements PDBS CONTRACTOR MODULE TRAINING Spring 2006 Anticipated Monthly Payment Schedule C400 Subcontract Agreements C115/C116

Select C-400 Select C400 Anticipated Monthly Payments

Select Project Select Project from dropdown then click Retrieve button.

Enter Date fields Input Start Date and Completion Date Click on first months ‘Payment Amount’ field. Enter amount and hit tab key to move to next one.

Enter Monthly Payment Amounts The ‘Running Total’ field calculates entered amounts to compare to the Contract Amount. Please make sure running total is equal to Contract Amount before saving and printing.

Save file To save the file, click the save button or click the ‘Display Report’ button.

C-400 Form Print this form, sign it and fax it to the Resident Engineer.

Questions??

Subcontract Agreements (C115/C116) Standard Specification 00555, Section 1.4 Subcontract Agreement approval by the Department is required before subletting, selling, transferring, assigning or disposing any portion of the Contract or Contracts. Sublet no more than 70 percent of the total contract work bid amount. Subcontracted work cannot begin until approved by Engineer.

Contractor Dropdown Menu Select Request to Sublet Work (C115/C116)

Select Project Select Project from Dropdown

Select Subcontract To create aNew subcontract, click ‘New’ button. To select a current subcontract, click the Subcontract then click the ‘Select Subcontract’ button.

Create/Revise Subcontract enter ‘Estimated Starting Date’ for the Subcontractor

Select Subcontractor from dropdown Select Subcontractor from Dropdown.

Subs must be registered This is the warning you will receive if the selected Contractor has not completed an Annual Registration

Non-dbe Registration page Contractors and non- DBE Subcontractors go to this page for Annual Registration Enter Assigned ID and password and enter required information. If company does not have an ID and password click here.

Non-dbe Registration page Link to Annual Registration Page also found on the Bid Opening Information Table

DBE with Commitment This message will appear when you have selected a DBE Subcontractor with a Commitment. If you click ‘Yes’ the committed items should autoload into the item window.

Committed items Autoload Committed items are automatically loaded

DBE Type/Selecting a Tier DBE Type is pre-determined Select tier from dropdown

Adding Items Keep in mind that if you subcontract an item as ‘Complete’, it cannot be re-assigned to another subcontractor. If the Subcontractor you have chosen intends to assign the item to a 2nd tier Subcontractor, it must be entered as ‘Partial’. To Add or Delete Items Right Click on screen

Add Items (cont.) Select Item from dropdown

Select Partial items Select Partial Service, Partial Supply, Complete, Change Order or Commitment Change

Enter Partial comment and Agreement amt. Comment Required on Partial Items Edit Agreement Amount as needed

Summary Calculations As new items are added, the Summary Calculations fields are updated

General Information Only the 1 st Tier Subcontracted values are used to calculate the Subcontracted percentage. (70 % maximum includes Specialty Items) Items Sublet as ‘Complete’ use the Bid Amount Items Sublet as ‘Partial’ use the Agreement Amount Items Sublet as ‘Complete’ cannot be re-assigned to a lower Tier subcontractor.

Save and Contractor Signoff Once complete – enter Contractor Signoff Date. This locks the subcontract. To unlock Contractor Signoff date must be removed.

Create new Subcontract from this window Click to view C115/C116 forms

C-115 Form Top portion of form

C-115 Signature block Sign and print form. Send to subcontractor for signature. Send signed form to RE for approval.

Create new Subcontract from this window Click here to start a new subcontract or view an existing subcontract from this window

Add New Subcontract Click here to add a new subcontract to the Current Project

2 nd _3 rd _ Tier & CO Subcontracts Create a 2 nd /3 rd Tier or Change Order Subcontract by selecting Tier Type

2 nd _3 rd _ Tier & CO Subcontracts Select the lower Tier subcontractor (one doing the work) from Subcontractor dropdown. Select the higher Tier subcontractor from the ‘Higher Tier Sub’ dropdown. (only approved higher tier subcontractors show in dropdown)

Adding 2 nd tier items Only Partial Items already subcontracted to the Higher Tier Contractor can be selected in the item list to be given to a lower tier subcontractor.

Items given to 2 nd Tier In this case only item 36 could be assigned to a lower tier subcontractor

General Information To modify an un-approved subcontract, zero out Signoff dates and work from the bottom up. Delete or modify items first. To delete an approved subcontract, contact the Resident Engineer. If all the items to be subcontracted have been added by Change Order, use ‘CO’ in the ‘Tier’ dropdown. If a mix of bid items and Change Order items are subcontracted, use the ‘Change Order’ entry on item itself. Items identified as ‘Change Order’ do not count against Subcontracted percentage.

Questions??

TRAINING PDBS CONTRACTOR MODULE

CONTRACTOR MODULE CONTRACTOR EMPLOYEE SETUP

Select this to add new Trainees to the current UDOT List

Sort the entire list by using the “Selection Filters” EXAMPLE Looking for: Jane Doe Female Iron Worker

Press the Drop-Down Menu, then Select “Iron Workers”

Select “Female” to complete the filter “Jane Doe” isn’t listed, so we must “Add” her

When adding a trainee, make sure you have all of the requested fields

When finished, Press “Save”

Now, Jane Doe is ready to be added to any of my projects (or any other contractor)

CONTRACTOR MODULE OJT TRAINEE HOURS WORKED

This Form will now be filled out in the PDBS system

Selecting this will allow you to add “Trainees” to a Project

First, Select a project

Lets choose *IM-15-2(45)82

Now, choose a subcontrator, in this case: Chris Corp

Press “Add”

Choose the appropriate Trainee/Apprentice

Fill in the # of hours worked on this the classification listed All other fields are filled in automatically

Using the “Right- Click” feature, you can Add, Delete, or Insert a row quickly If you cannot find the Trainee/Apprentice you need, you can open Trainee setup from this window

CONTRACTOR MODULE SUBCONTRACTOR PAYMENTS ENTRY

To report payments made to the subcontractors, use this function Proper use of the following procedure replaces the “Prompt payment affadavit”

Click on the menu

The Prime Contractor who was awarded the project will automatically populate Select a Subcontractor (or view “All”), then press “Retrieve”

List below will populate with project items

To add a new payment to a Sub, right-click and press Add

Now, fill out the: Item Number (fills in desc) Quantity And payment amount

For internal tacking, you can fill in Notes in the bottom

Now, everyone notice the RED dates in the 1 st column And read the note at the bottom of the page (next slide)

Information on prompt payment to Subs, MUST BE ADDED TIMELY, not at the end of a project All penalties and awards for Prompt Payment will be tracked from this data

CONTRACTOR MODULE REPORTS

To find out the status your DBE commitments, press this

This list will populate with your companies projects currently, select one to view the report

After processing the report, PDBS will list the vital information about the project, and list the committed DBE’s on the project

If you want to view the impact of DBE commitments on your project, select this

Select a project

From this drop-down menu

The field will populate with what our system currently has the Prime slated for, and what has actually been entered The “Report” button simply prints off the information to the Default printer

Want to review your OJT’s? Select this

Grab a project

The field will populate with all of the OJT’s and the work they are doing

Thank you.