IES 371 Engineering Management Chapter 14: Aggregate Planning

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Capacity Management Planning the resource capacity that a firm will need to meet its demand.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Chapter 13 Capacity and Aggregate Planning. Aggregate Production Planning (APP) Matches market demand to company resources Matches market demand to company.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Aggregate Planning Operations Management - 5 th Edition Chapter.
Operations Management Aggregate Planning Chapter 13
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operational Planning Operations Management Chapter.
BA 320 Operations Management Chapter 9 Capacity and Aggregate Planning.
Aggregate Production Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
Operations Management Aggregate Planning Chapter 13
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
CHAPTER 3 : AGGREGATE PLANNING MOHD HAFIZUL BIN TUKIMIN MOHD SYAFIQ BIN MANSOR MOHD RUBA’I AMIR BIN SALLEH CHE MUHD FIRDAUS BIN CHE MAT.
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
Manufacturing’s Objectives
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling 14 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Supply Chain Management (SCM) Aggregate Planning
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Sales and Capacity Planning
© 2007 Pearson Education Sales and Operations Planning Chapter 14.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Alternatives.
Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 11 Capacity Planning And Aggregate Production Planning.
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 Learning Objectives:  Understand the concepts and methods of aggregate.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
OPIM 204 – Aggregate Planning 1 Aggregate Planning OPIM 3104 Instructor: Jose Cruz.
Lesson 16 Aggregate Planning
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Chapter 14 Sales and Capacity Planning. Lecture Outline The Sales and Operations Planning Process Strategies for Adjusting Capacity Aggregate Planning.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
© 2007 Pearson Education Sales and Operations Planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
OPERATIONS MANAGEMENT: Creating Value Along the Supply Chain,
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Aggregate Planning Chapter 14
Aggregate Sales and Operations Planning
Chapter 14 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Beni Asllani University of Tennessee at Chattanooga
Chapter 8 Aggregate Planning in the Supply Chain
Sales and Operations Planning
Dr Sh Salleh bin Sh Ahmad
Aggregate Production Planning (APP)
Presentation transcript:

IES 371 Engineering Management Chapter 14: Aggregate Planning Week 13 August 31, 2005 Learning Objectives: Understand the concepts and methods of aggregate planning Formulate and solve capacity planning problem

Aggregate Plan Aggregate Plan: A statement of a company’s production rates, workforce levels, and inventory holding based on estimates of customer requirements and capacity limitations Service Industry Staffing Plan Regarding staffs and labor related factors Manufacturing Industry Production Plan Regarding production rates and inventory

Aggregate Production Planning (APP) Determines resource capacity to meet demand For intermediate time horizon, 6-12 months Not feasible to build new facility May be feasible to hire/lay off workers, overtime, or subcontract Adjusting capacity OR managing demand

How should an aggregate plan fit with other plans? Business or annual plan Production or staffing Plan (Aggregate Plan) MPS or workforce schedule Figure 14.1

Aggregate Plan – Managerial Inputs Current machine capacities Plans for future capacities Workforce capacities Current staffing level Operations Customer needs Demand forecasts Competition behavior Distribution and marketing Aggregate plan Supplier capabilities Storage capacity Materials availability Materials Cost data Financial condition of firm Accounting and finance New products Product design changes Machine standards Engineering Labor-market conditions Training capacity Human resources

Aggregate Plan – Outputs Aggressive Alternatives Complementary Products Competitive Pricing Reactive Alternatives Aggregate plan Size of Workforce and Workforce Adjustment Units or dollars Of Backlogs, backorders , or stockout Inventory Levels Production per month (in units or $) Units or dollars subcontracted

Aggregate Planning Objectives Minimize Costs/Maximize Profits Maximize Customer Service Minimize Inventory Investment Minimize Changes in Production Rates Minimize Changes in Workforce Levels Maximize Utilization of Plant and Equipment

Examples of Capacity Adjustment to Meet Demand Units Time Producing at a constant rate and using inventory to absorb fluctuations in demand Hiring and firing workers to match demand Maintaining resources for high demand levels Increase or decrease working hours (overtime and undertime) Subcontracting work to other firms Using part-time workers Providing the service or product at a later time period (backordering)

Planning Strategies Chase Strategies Level Strategies Mixed Strategies Match demand during the planning horizon by either Vary workforce or vary output rate Level Strategies Maintain a constant workforce level or constant output rate during the planning horizon Constant workforce or constant output rate Mixed Strategies Combined several strategies PURE STRATEGIES

Pure Strategy Level Production Chase Demand Units Time Chase Demand Production Demand Units Time What are pros / cons of these strategies?

TABLE 14.1 PLANNING STRATEGIES FOR AGGREGATE PLANS Possible Alternatives Possible Alternatives Strategy during Slack Season during Peak Season 1. Chase #1: vary workforce Layoffs Hiring level to match demand 2. Chase #2: vary output Layoffs, undertime, Hiring, overtime, rate to match demand vacations subcontracting 3. Level #1: constant No layoffs, building No hiring, depleting workforce level anticipation inventory, anticipation inventory, undertime, vacations overtime, subcontracting, backorders, stockouts 4. Level #2: constant Layoffs, building antici- Hiring, depleting antici- output rate pation inventory, pation inventory, over- undertime, vacations time, subcontracting, backorders, stockouts

Aggregate Planning Costs Regular-Time Costs Overtime Costs Hiring and Layoff Costs Inventory Holding Costs Backorder and Stockout Costs

Ex 1 Candy Company Given the following costs and quarterly sales forecasts of a candy company, compare the two strategies: Strategy 1: Level production with constant workforce level Strategy 2: Chase production by varying workforce level Quarter Sale Forecast (LB) Spring Summer Fall Winter 80,000 50,000 120,000 150,000 Hiring cost Firing cost Inventory carrying cost Production rate per employee Beginning workforce $100 per worker $500 per worker $0.50 per pound per quarter 1000 pounds per quarter 100 workers

Transportation Method A method of LP Gather all cost info into one matrix Try to obtain the lowest cost alternative

Notations It = inventory at the end of period t (I0 = beginning inventory) h = holding cost per unit per period, r = regular production cost per unit, o = overtime cost per unit, u = undertime cost per unit s = subcontracting cost per unit, b = backordering cost per unit per period Rt = regular-time capacity in period t Ot = overtime capacity in period t St = subcontracting capacity in period t Dt = forecasted demand for period t U = total unused capacities

Tableau Method Step 1: Put all capacities from the total capacity column into the unused capacity column. Next, put unit costs in each of the small boxes Step 2: In column 1 (period 1), allocate as much production as you can to the cell with the lowest cost but do not exceed the unused capacity in that row or the demand in that column. Step 3: Subtract your allocation from the unused capacity for the row. This quantity must never be negative.

Tableau Method (Cont’d) Step 4: If there is still some demand left, repeat step 2, allocating as much production as possible to the cell with the next-to-lowest cost. Repeat until the demand is satisfied. Step 5: Repeat steps 2 through 4 for periods 2 and beyond. Take each column separately before proceeding to the next. Be sure to check all cells with unused capacity for the cell with the lowest cost in a column.

Ex 2: Transportation Method Given the following costs and quarterly sales forecasts, use the transportation method to design a production plan. What is the total cost of the plan? Inventory carrying cost = $3 per unit per quarter Production/worker = 1000 units/quarter Regular workforce = 50 workers Overtime capacity = 50,000 units Subcontracting capacity = 40,000 units Regular production cost = $50/unit Overtime production cost = $75/unit Subcontracting cost = $85/unit Quarter Sale Forecast (unit) 1 2 3 4 50,000 150,000 200,000 52,000

Linear Programming Model (LP) Pure/Mixed Strategy: not guarantee optimal solution LP: can get optimal solution LP: Excel, LINGO, CPLEX, … LP Formulation** Objective function Constraints Ex 2: Formulate LP model for Ex 1 Candy Company and Ex 2