Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Copyright © 2006 Supplier Profile Training Guide for Suppliers Polaris Industries presents: Published: December 2006.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Generation Business Line
INTRODUCTION TO CLARK CONSTRUCTION WOMEN’s CONSTRUCTION COALITION.
California High-Speed Train Construction Package 2-3 Business Opportunities Briefing July 7, 2014 Hanford, California.
JOHN DEIGHAN CHIEF PURCHASING OFFICER ALLEGHENY COUNTY DEPARTMENT OF ADMINISTRATIVE SERVICES DIVISION OF PURCHASING.
87th Air Base Wing Ms. Suzanne Edgar Flight Chief, 87 CONS Doing Business with the Federal Government.
Agenda Safety Topic Overview of Agenda Introductions
Veteran-Owned Business Seminar Presented by Gayle Nuppnau Dept. of General Services Bureau of Small Business Opportunities August 14, 2014.
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
Contracting with WYDOT
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Subcontracting. Subcontractors % of work is subbed –Significant impact on costs and schedule –Want to develop a working relationship with good.
ESTIMATING By Laith Jacob.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
The Government as a Business Partner Christopher Way NH Procurement Technical Assistance Program (PTAP)
BUILD WITH US. ™ Contractors
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Federal Acquisition Service U.S. General Services Administration Facilities Management Solutions 2010 GSA Caribbean Training Conference March 2010 Donald.
Welcome to the Conference and a Brief Introduction to KIRA Presented by: Carlos Garcia Owner / CEO KIRA, Incorporated Date: June 17, 2014.
A Partnership for Safe Chemical Weapons Destruction 1 Welcome  Safety Topic  Overview of Agenda  Introductions –Lori Baker, Acquisition Services Manager.
1 COMBAT VEHICLES SUPPORT INITIATIVE (CVSI) Industry Day Briefing Defense Supply Center Columbus 16 Oct 2007.
Proven performers, good neighbors 1 Prequalification Requirements for Subcontract Opportunities June 1, 2006.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
1 Bechtel Parsons Blue Grass Vendor Training Kentucky Procurement Assistance Program Richmond, Ky September 26, 2007 Bobbi Carlton.
HOW TO DO BUSINESS WITH THE FEDERAL GOVERNMENT An Introduction to Business Matchmaking Thursday, October 30, 2003 Hyatt Regency Houston.
Office of Small Business Utilization U.S. General Services Administration GSA Mentor-Protégé Program Anthony “Tony” Eiland Program Manager.
How To Do Business With B&W Y-12 L. Weldon Hammond II Socioeconomic Programs Office August 27, 2009.
1 Doing Business with the University of North Texas System September 2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Specification & Quantities Estimating
Department of Finance Annual Report on City Procurement Presented by Antonio Watson August 31, 2015 City Council.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Operated by Los Alamos National Security, LLC for DOE/NNSA U N C L A S S I F I E D Slide 1 Los Alamos National Laboratory Yvonne Gonzales, Small Business.
HOW TO DO BUSINESS WITH THE FEDERAL GOVERNMENT An Introduction to Business Matchmaking Saturday, January 10, 2004 Cal State University - Fullerton.
Project Update August 2008 Richard Rife Deputy Project Manager.
Contracting with CMS and other Federal Agencies CMS Industry Day October 30, 2015 Anita Allen, Small Business Specialist and Claude Cable, SBA Procurement.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Doing Business With The U.S. Environmental Protection Agency EPA’s Mission and Buying Offices; What and How EPA Buys; Finding Procurement Opportunities;
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
IAS Pre-proposal Conference NOVEMBER 2, 2011 Pre-proposal Conference NOVEMBER 2, 2011 Tahoma NATIONAL CEMETERY PHASE 2 DEVELOPMENT KENT, WASHINGTON Project.
Doing Business With the U of I Facilities and Services Construction Division Overview of Construction Programs and Contracting Processes Gary Biehl, Assoc.
August 2012 TINKER AND THE PRIMES 2012 Government Contracting Boot Camp Presented by: The Oklahoma Bid Assistance Network and The SBA Teaming Pilot Program.
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Vera Konstantinova, Procurement Contracting Officer July 16, 2015 REQUEST FOR PROPOSAL (RFP) 6922 IN-HOME OUTREACH TEAMS AND ASSISTED OUTPATIENT TREATMENT.
BONDING & ACCESS TO CAPITAL SMALL CONTRACTORS INITIATIVE.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Procurement & Strategic Sourcing
Proximity to Opportunity IAH New Terminal C North
Evaluation Grids Evaluation Grids.
(Refer to Chapter 2 of the textbook)
Redevelopment Projects & Contracting Opportunities
Procurement & Strategic Sourcing (Law School Media Wall)
PRE-PROPOSAL MEETING, January 16, 2018 Contract No.:
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Designers’ Manual Overview and Chapter Contents
Washington Metropolitan Area Transit Authority (WMATA)
Doing Business with the University of Georgia UGA Procurement
Procurement & Strategic Sourcing
Learn about bidding the Facility Services Targeted Small Business Enterprise Tier 2 Program Welcome Confirm who is doing the speaking for each slide……
Presentation transcript:

Proven performers, good neighbors 1 Doing Business with Bechtel Parsons Blue Grass September 26, 2007 Diane Osbourne Small Business Advocate

Proven performers, good neighbors 2 Introductions & Safety Topic  Safety Topic  Introductions –Evan Carlson, Field Procurement Manager –Gary Cough, Construction Manager –Dave DuRegger, Subcontracts Manager –Denise Hart, Procurement Manager

Proven performers, good neighbors 3 Richmond, KY Current Project Staffing  Bechtel Parsons Blue Grass Team currently employs personnel located as follows: –Richmond, KY: 60 (18 local hires) –Jobsite: 27 –Pasadena, CA; Pasco, WA; Columbus, OH and San Diego, CA: 317  Subcontractor and Direct Hire construction workers on site: each day and growing Jobsite

Proven performers, good neighbors 4 Construction Work nearing completion  Access road 99% complete except for guard rail work  Roadway Concrete/ACB Potable Water & Sewer (100% complete)  Perimeter Fencing (100% complete)  ACB Electrical Power and Roadway (58% complete)  Access Control Building (81%)  Active Security Vehicle Barrier (84%)

Proven performers, good neighbors 5 Construction Near-Term Work  Subcontracts –Badging Facility  Subcontract awarded on July 29, 2007 –Personnel Support Building  Subcontract awarded on June 23, 2007 –Maintenance Building  Subcontract awarded on June 25, 2007 –Access Control Building Canopy  Currently bidding  Underground Material –Purchase Orders have been awarded and the majority of the material has been received on site for:  Storm Drainage, Sanitary Sewer  Electrical Ductbanks/Lighting/Grounding  Fire Protection and Process Water Piping

Proven performers, good neighbors 6 Construction Future Work  138 KVa Main Power Substation & Pole Line – Subcontract Awarded on July 26, 2007  MDB Horizontal Concrete Material (Rebar/Embeds/Formwork)*  Permanent Plant Equipment * Contingent upon receipt of an authorizing Notice to Proceed from the Government to perform the work

Proven performers, good neighbors 7 Acquisitions As of 30 August 2007: 94.9% ConstructionProject Total Total Awards$37,654,294$42,295,455 Awards to Local Businesses $23,567,31263%$23,958,07557% Kentucky Businesses Outside Local Area $1,627,9614%$1,714,4264% Businesses Outside Kentucky $12,459,02133%$16,622,95439% Total Awards to Kentucky Businesses $25,195,27367%$25,672,50161%

Proven performers, good neighbors 8 Bechtel Supplier and Contractor Portal  All interested companies are required to register on the Bechtel Supplier and Contractor Portal- –Dunn and Bradstreet Number –Bonding capacity, bid range –Annual sales –Area of expertise, work experience –Business size classification  Information is utilized to assess interested company’s capability  You may also a letter of introduction & company capabilities to the Project Small Business Advocate

Proven performers, good neighbors 9 Bechtel Supplier and Contractor Portal

Proven performers, good neighbors 10 Prequalification Process  Most RFP Opportunities will be posted on the project website under Suppliers/Subcontractors/Opportunities:  Prequalification requirements will be listed on the description for the scope of work  All project RFP’s are Invitation to Bid Only. A completion of prequalification process does not guarantee participation in any RFP.  Submit interest and prequalification documents utilizing the tool by clicking the envelope icon

Proven performers, good neighbors 11 BGCAPP Project Website

Proven performers, good neighbors 12 Prequalification Process  Prequalification for Materials and Fabricated Equipment –Work History –Manufacturer Agreements –Certifications-ASME, ISO 9000, Class of Code Stamp –Quality Program –Shop Capacity –Financial Capability –Schedule –References  Prequalification for Subcontracts and Services –Work History –Safety, Experience Modification Rate, OSHA 300 logs –Quality Program –Financial Capability- Bonding & Insurance –Teaming Partners –References

Proven performers, good neighbors 13 Small Business  Bechtel Parsons Blue Grass (BPBG) is committed to providing meaningful roles for small, small disadvantaged, HUBZone, women-owned, veteran- owned and service disabled veteran-owned businesses  Am I a small business?  BPBG strongly encourages partnerships between small businesses and small and large businesses  Identify the role of each partner in your plan  Submit prequalification documents for each partner

Proven performers, good neighbors 14 Contact Information Diane Osbourne Small Business Program Advocate 301 Highland Park Dr. Richmond, KY (859)