Implementing American Recovery and Reinvestment Act Work Safely Sam Easterling ES&H Projects Specialist ES&H B&W Y-12.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Laser Direct Manufacturing of Nuclear Power Components
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Technical Report NREL/TP April 2007 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Spring 2007 Composite Data.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Smart Grid Primer Funded by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability Energy Bar Association – Primer for Lawyers.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
Megan Houchin Safety Analysis Engineering Y-12 National Security Complex SAWG May 7 th, 2012.
Contractor Safety Management
Keeping your Automated Devices Alive
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
1 NOTES This presentation is an outline of some of the most important aspects of DOE O 440.1B For completeness, copies of the Order should accompany this.
Slide 1 Upgrading the United States Transuranium and Uranium Registries’ Pathology Database Stacey L. McCord, MS USTUR Project Associate
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Risk Assessment – An Essential Standard
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
1 Los Alamos Legacy Cleanup Completion Project (LCCP) Post Fiscal Year 2016 Contract(s) Industry Day Request For Information & Capability.
Integrated Safety Management Summit Y-12 Safety Performance Driven by Employee Teams Doug LeVan Director, ES&H Performance Improvement August 2009.
Deposition Velocity Issues at Y-12 Bruce A Wilson Chief Engineer, Nuclear Facility Safety Douglas Clark Analyst B&W Technical Services Y-12 May 9, 2012.
CLICK TO EDIT MASTER TITLE STYLE TRIPR FLAMMABLE LIQUID UNIT TRAINS 8.0 CLEAN-UP AND POST-EMERGENCY OPERATIONS.
1 Floyd Galvan October 12-13, 2011.
Health and Safety Policy
PRES-ET A011 Lynn J. Harkey SDIT Project Engineer Uranium Processing Facility Project B&W Y-12 August 26, 2009 The Process, Methods and Tool Used.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
2009 DOE ISM Conference Putting Spokes in the Wheel: Understanding Feedback and Improvement Vance S. Tisdale Operational Performance Improvement Manager.
2011 Broward Municipal Green Initiatives Survey Results GHG Mitigation Energy 2/3 of Broward’s reporting municipalities have implemented incentives or.
Gas-Electric System Interface Study OPSI Annual Meeting October 8, 2013 Raleigh, North Carolina.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
Y-12 Integration of Security and Safety Basis, Including Firearms Safety David Sheffey Safety Analysis, Compliance, and Oversight Manager B&W Technical.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
V Work Environment Forecast – Dec There is a COLD WIND a coming… Larry Supina Manager, Pantex Readiness Consolidated Nuclear Security, LLC
Primer Briefing “Brand Name or Equal” Purchase Descriptions Ask a Professor - # Date:
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Technical Report NREL/TP April 2008 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Spring 2008 Composite Data.
THE Y-12 EXPERIENCE: IMPLEMENTING AND MEASURING A NUCLEAR SAFETY CULTURE Dr. Jeff Miller, Oak Ridge Associated Universities (ORAU) Paul Wasilko, B&W Y-12.
John Blair Woods Manager, Program Analysis and Evaluation Safeguards, Security, & Emergency Services B&W Y-12 August 27, 2009 Integrated Safety and Security.
1 Technical Report NREL/TP June 2010 Early Fuel Cell Market Deployments: ARRA Quarter 1 of 2010 Composite Data Products Final Version February.
V UNCLASSIFIED This document has been reviewed by a Y-12 DC/UCNI-RO and has been determined to be UNCLASSIFIED and contains no UCNI. This review does not.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Improvement of Integrated Work Management and ISM Presented.
National Renewable Energy Laboratory 1 Innovation for Our Energy Future.
Evaluation of the Impact to the Safety Basis of Research Conducted in Production Facilities at the Y-12 National Security Complex Rebecca N. Bell Senior.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable.
2015 NARUC Winter Meeting Nick Wagner – Iowa Utilities Board 1.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Responsibilities of Sponsor, Investigator and Monitor
LCLS-II ES&H Requirements: Subcontractors
Planning for Succession
Responsibilities of Sponsor, Investigator and Monitor
Subset Selection in Multiple Linear Regression
September Workshop and Advisory Board Meeting Presenter Affiliation
Injury and Illness Prevention Program (IIPP)
September Workshop and Advisory Board Meeting Presenter Affiliation
TRIPR High Hazard flammable Trains
2/3 20% 71% Half 54% Over Half 45% 14% Introduction GHG Mitigation
Presentation transcript:

Implementing American Recovery and Reinvestment Act Work Safely Sam Easterling ES&H Projects Specialist ES&H B&W Y-12

Sam Easterling - Background Bachelor of Science Degree in Environmental Health East Tennessee State University More than 30 years experience in the Environmental, Safety and Health field including; –Ten years service improving DOE/NNSA Projects through ES&H Support –Twenty years of ES&H service to the Y-12 National Security Complex supporting Environmental Monitoring, Environmental Compliance, and Safety Management functions –Environmental Health regulatory experience with three states (Florida, Commonwealth of Virginia and Tennessee) Committed to ES&H Continuous Improvement through Involvement

Y-12 ARRA Projects

Implementing ARRA Work Safely Safety is the number one B&W Y-12 Core Value

Implementing ARRA Work Safely B&W Y-12 expects ALL work to be performed in a manner that: –provides safe working conditions –protects worker health –minimizes potential risk –protects the public and environment –complies with applicable regulations –continuously seeks opportunity to improve performance –provides for Stop Work Responsibility/Stop Work Authority

Implementing ARRA Work Safely The Integrated Safety Management System is the process implemented to ensure work is performed safely and securely. –Includes Integrated Safeguards and Security Management and Environmental Management System –ARRA work scope has a project manager and core project team

Implementing ARRA Work Safely B&W Y-12 Project Team Define the Scope of Work –Determine work scope, prioritize, and obtain authorization for work to be performed –Work scope definition includes overview of significant hazards –Initiate work requests through appropriate work control process (Operations, Maintenance, Construction, or Procurement/ Subcontractor) Subcontractor Define the Scope of Work –Participate in the procurement process (Review Request For Proposal and participate in pre-bid meetings and walk downs) –Develop technical approach and prepare pre-award submittals including historical safety performance (Experience Modification Rates and OSHA 300 Logs)

Implementing ARRA Work Safely B&W Y-12 Project Team Analyze Hazards –Use a graded approach to evaluate hazards and risks Review safety basis documentation Prepare security evaluation Conduct nuclear criticality safety evaluation Review environmental and waste management aspects Review existing facility condition Conduct walk downs Perform job hazards analysis (JHA) based on the work control process Subcontractor Analyze Hazards –Conduct follow-up walk downs post contract award –Determine Activity Hazards Analysis (AHA) needed (number and structure based on work scope) –Perform AHA/JHA –Begin development of Site Safety and Health (ES&H) plan and other plans

Implementing ARRA Work Safely B&W Y-12 Project Team Develop and Implement Controls –Develop work instructions based on the work control process (plans, JHA, permits, work packages, and/or procedures) –Line management ensures work instructions are appropriately reviewed and approved according to the work control process Graded approach per work control process, activity hazard and B&W Y-12 ISMS requirements (Operational Safety Boards and/or Management Review Board) Subcontractor Develop and Implement Controls –Develop work instructions (programs, plans, and AHAs) –Provide submittals for review and approval in accordance with the subcontract –Demonstrate to B&W Y-12 readiness to obtain Notice To Proceed –Implement controls

Implementing ARRA Work Safely B&W Y-12 Project Team Perform Work within Controls –S–Schedule work coordinating with site organizations and facilities –W–Work is placed on the Plan of the Day –P–Pre-job briefing is performed –O–Obtain work-start approval –P–Perform work implementing controls Subcontractor Perform Work within Controls –S–Schedule work coordinating with Subcontract Technical Representative –W–Work is placed on the Plan of the Day –P–Pre-job briefing is performed –O–Obtain work-start approval –P–Perform work implementing controls

B&W Y-12 Project Team Feedback and Continuous Improvement –Utilize feedback and improvement mechanisms Behavior-based Safety Lessons Learned Pre- and post-job briefings B&W Y-12 assessments, inspections and observations DOE NNSA oversight Safety meetings Performance metrics B&W Y-12 feedback and improvement reports –Inspector General oversight Subcontractor Feedback and Continuous Improvement –Utilize feedback and improvement mechanisms Implement feedback mechanisms as specified in the subcontractor’s ISMS Lessons Learned Worker feedback Subcontractor ES&H representative oversight Subcontractor management oversight B&W Y-12 oversight and monthly subcontractor Lessons Learned meeting DOE NNSA oversight –Inspector General oversight

Implementing ARRA Work Safely ALL new employees and subcontractors receive general worker training including an overview of: –hazards present at Y-12, –means used to identify hazardous areas, –site emergency procedures and alarms, –site safety, site security, and quality assurance programs, and –site procedures and instructions applicable to all employees. In addition, ALL employees learn about: –Stop Work Responsibility/Stop Work Authority, –Integrated Safety Management System, –Behavior-Based Safety observations, –Lessons Learned, and –reporting employee concerns.

Implementing ARRA Work Safely Ensuring workers are qualified (specific worker training) –Jobs and tasks are analyzed for training needs Compliance training matrix identifies training requirements Job tasks are analyzed to determine specific training needs Work control documents specify training requirements Training requirements are assigned to individuals in SAP –Qualifications are verified Supervisors use SAP to verify workers, including staff augmented subcontractors, are qualified prior to work assignments Task-based subcontractor training requirements and implementation are incorporated into subcontract requirements and subcontractor work control documents

Implementing ARRA Work Safely There is nothing in the Recovery Act scope for B&W Y-12 that we haven’t done before –L–Legacy waste disposition (legacy pool projects) –S–Scrap yard cleanup ( scrap yard cleanup) –B–Building D&D (1.2 M square feet under the Infrastructure Reduction Program) –P–Process deactivation (Development foundry deactivation, beryllium- contaminated, is under way)

Legacy waste disposition has included: –Reduced legacy low-level waste by 93% (including the disposition of more than 5,000 chemicals) –Removed more than 120 excess vehicles, 120 transformers, one locomotive, and two ’50s-era DOD railcars Cleanup of the scrap yard is complete –1,700 containers and 45 Sealand containers of debris Yard Before Yard After

Implementing ARRA Work Safely B&W Y-12 expects ALL work to be performed in a safe manner –R–Recognize changing conditions and take appropriate action –S–Stop work as needed for safety –E–Execute effective management, technical support and worker roles and responsibilities –S–Share lessons learned –I–Integrate self evaluation, feedback and oversight for continuous improvement –R–Recognize safe work practices ZERO ACCIDENTS IS OUR EXPECTATION

DISCLAIMER This work of authorship and those incorporated herein were prepared by Contractor as accounts of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor Contractor, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, use made, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency or Contractor thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency or Contractor thereof.